Loading...
HomeMy WebLinkAbout2018-06-19 Monitoring Report WSP P Town of North Andover Office of the Planning Department Community Development and Services Division 120 Main Street North Andover, Massachusetts 01845 Monitoring Report Date of Inspection: 2018-09-17 Project Location: 35 Dale Street Permit Type: Watershed Special Permit Date of Decision: 2018-06-21 Date of Approved Plan: Monitor(s): Monica Gregoire Monitor's Title(s): Staff Planner Describe present phase of construction: Excavation X Regular Pre-storm event. During storm event Post-storm event Weather Information Has it rained since the Last inspection? N/A Rain totals: 0 Weather at time of this inspection: Sunny and 83 degrees f @ 1:50 pm Erosion Control BMP Description BMP Installed and Corrective Action Date for Corrective Operating Properly Needed Action/ Responsible party Silt Fence/Silt Sock, X Yes No Any sediment that Silt Sack is on top of the erosion control must be corrected. Are all slopes and X Yes No N/A disturbed areas not being work properly stabilized Are perimeter X Yes No Silt Sock must controls and overlap. There is sediment barriers evidence of erosion adequately passing installed? over/through. Is there evidence of Yes XNo None sediment being tracked into the street Is trash/litter from Yes No None work areas collected and placed in covered dumpsters Are vehicle and Yes No None equipment fueling, cleaning and maintenance areas free of spills, leaks or any other deleterious material? Overall Site Issues BMP/Activity Implemented Maintained Corrective Date for corrective Action Action/responsible Needed person Are all slopes Yes No XYes No None and disturbed areas not actively being worked property stabilized V Are natural XYes No Yes No resource areas protected with barriers or similar BMP's Are perimeter Yes No Yes No Please Clear controls and sediment sediment which is on carriers top of the adequately erosion installed and control. maintained Is there Yes X No Yes No evidence of sediment being tracked into the street Is trash/litter Yes No Yes No No Dumpster from work on site. areas collected and placed in covered dumpsters? Are vehicle and X Yes No Yes No equipment fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious materials? Field notes : Stockpiled materials must be covered. Additional Comments: Please note, the elevation must match that of the approved plan approved by the Planning Board dated March 20, 2018. Site Photographs p a �/ .�'"� „I ��; r apt ,;„ ; �� 1 l���/;JJ�.!�'/i � ✓V � � Y w ry awl r/ Fri / r P ry i1 �/r a Erosion control corrected and now overlaps ff VG, � rJ Y Sand must be removed from the sloped area. Slopes must be regraded to reflect the approved plan,