Loading...
HomeMy WebLinkAbout2022-01-04 As-Built Construction Certification WSP Sullivan Engineering Group, LLC 0v11 Engineers&Land Development Consultants October 245 2022 Town of North Andover Planning Dept, 120 Main Street North Andover,MA 01845 Re: 212 Brentwood Circle, NA. As-built plan & construction certification Planning Board members; I am writing this letter to confirm that the approved work in the Watershed Special Permit Decision (recorded in Book: 17422 Page: 39 on 1/4/2022)has been constructed in substantial compliance with the decision and approved plan. An As-built plan prepared by Sullivan Engineering Group,LLC, dated.October 24, 2022 is intended to accompany this letter. The owner completed the inground pool,pool patio, shed, fencing, drainage infiltration trenches, and associated site grading according to the approvals. Weekly inspections were conducted by this office throughout the project and monthly reports were provided to the Planning Department. The owner also prepared and recorded the Deed Restriction limiting fertilizer and pavement sealants (recorded in Book: 17388 , Page: 21 on 3/24/2022). The site is fully stabilized by landscaped means and the grass growth has established at greater than 95%rate. I would recommend that the Planning Board release the performance bond for this project. If you should have any quest' s or req additional information please feel free to contact me. Very T Yours, y Jac S 1 P.E. " 10) Cc: John&Michelle Tern l Enclosed: Site As-built Plan—212 Brentwood Circle dated Oct. 24, 2022 PO Box 2004 Woburn,MA 01888 781-854-8644 e-mail:jacksu1153@comeast.net