HomeMy WebLinkAbout2022-01-04 Pool Maintenance & BMP Plan WSP Sul/,Nan .EngineePrng Croup, LLC
CYrr11 ErlginooTs&Land Development CovsuAgnts
Pool. Maintenance and BMP Plan
212 Brentwood Clecle
North Andover, MA 01846
Dec, 27, 2021
Storage of Chemicals
Pool chemicals will be stored inside the new shed and according to their presoribed storage
environments, in order to ensure containment of spills.
D indown a0d Malntenance
Prior to seasonal closure. or draining of the pool for maintenance, chlorine levels will be reduced to
undetectable levels of<0.1 mg/1 i either by: I) eliminating chlorine usage for approximately
ten days to allow chlorine levels to dissipate, or 2) utilizing sodium thiosulphate or other pool
dechlorination chemicals. approved by DEP for use in watershed areas. Vllater will only be discharged
into the river rock trench on the backside of the pool:pato, which will allow further filtration and infiltration
of the water. The trench has sufficient storage to prevent any overflow of water.
Overflow ProtectIQ
Whenever a severe or 190-year storm .event is predicted, the pool water level will be drained, pursuant
to the above methods, to a level.to permit 8 inches of rain to be colleckod in the pool
Infiltration Reach h ainte ancg
Infiltration trenches will be inspected at the seasonal opening acid closing of the pool, and after major
storm events per.above. Debris will be removed, and any 'silted or clogged stone will be replaced .as
needed to maintain the design performance of the trenches.
Engineer's Certification --212 Brentwood Circle
1, John D. Sullivan III, P.E., certify by..signirig below that the work as depicted on the plan titled
'Plot Plan of Land—212 Brentwood Circle, NA, dated 9/24/2021, revised 12/6/21 prepared by
Sullivan Engineering Group, LLC Will not result in the significant degradation of the duality or
quantity of water in or entering l_ako Cochichewick.
In accordance with Sta.bdaard 9 in the Massachusetts StoXmwater Randbook a Long Tehn O&M drainage plan
is being pxovicled to aecoinpany the pool/patio/shed ns lation�at the above propcity. The owner selected a
low-impact,drainage design(river rock none tration tFemhes)which wM roqui�d little to no maintenance.
In-order to detor,wi -e if the i.7-rer rodk 16 functioning as designed.the following haspeaf Oxis.shall occur at least
once a year and after any storm event(3" or gteater).
R0'. Box.2004 Wobuzn,M A.:b1888 (181) g54�4644 e-xa affjacksWI53@conica$t.net
a, .Site vegetation and onsite landscaping shah be maintained.in healthy condition to prevent erosion and
sedimentation in the two river rock infiltration trenches.
b. River Rock trenches---$hall be inspected trice annually. Sediment and debris (including leaves) shall
be removed and disposed of in accordance with all applicable federal, state, and local_laws. In the
eventthat water does not leaw the trench within.72 hours this is a sign of failure and the trench should
be repaired,including excavating and replacing stone,to insure proper functioning.
Submitted by: j
E. 12--27-2021
ro 8u an : Date:
J 2-27-202I
John To o,Property Owner Date:
P.O. Bok 2004 Woburn,MA 01.888 (781) 854-5.644 e-mail.:jacksu1153@egmcast.net.
i
i
i
Sullivan .Engineering Group, LLC
Civil Englneers&Land Development Consultants
Pool Maintenance and BMP Plan
212 Brentwood Circle
North Andover, NIA 01845
December 8, 2021
Storage of Chemicals
Pool chemicals will be stored inside the new shed and according to their prescribed storage
environments, in order to ensure containment of spills.
Draingkown and intenance
Prior to seasonal closure or draining of the pool for maintenance, chlorine levels will be reduced to
undetectable levels of <0.1 mg/1, either by: 1) eliminating chlorine usage for approximately
ten days to allow chlorine levels to dissipate, or 2) utilizing sodium thiosulphate or other pool
dechlorination chemicals approved by DEP for use in watershed areas. Water will only be discharged
into the river rock trench on the backside of the pool pato, which will allow further filtration and infiltration
of the water. The trench has sufficient storage to prevent any overflow of water.
Overflow Protection
Whenever a severe or 100-year storm event is predicted, the pool water level will be drained, pursuant
to the above methods, to a level to permit 8 inches of rain to be collected in the pool
InfiltEa_tion Trench Maintenance
Infiltration trenches will be inspected at the seasonal opening and closing of the pool, and after major
storm events per above. Debris will be removed, and any silted or clogged stone will be replaced as
needed to maintain the design performance of the trenches.
Engineer's Certification --212 Brentwood Circle
1, John D. Sullivan ill, P.E., certify by signing below that the work as depicted on the plan titled
"Plot Plan of Land — 212 Brentwood Circle, NA, dated 9/24/2021, revised 1216/21 prepared by
suliivan Engineering Group, LLC will not result in the significant degradation of the quality or
quantity of water in or entering Lake Cochichewick.
In accordance with Standard 9 in the Massachusetts Stormwater Handbook a Long Tenn O&M drainage plan
is being provided to accompany the pool/patio/shed installation at the above property. The owner selected a
low-impact drainage design(river rock stone infiltration trenches) which will require little to no maintenance.
In order to dete>inine if'the river rock is functioning as designed the following inspections shall occur at least
once a year and after any storm event(37'or greater).
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net ;I'
a, Site vegetation and onsite landscaping shall be maintained in healthy condition to prevent erosion and
sedimentation in the two river rock infiltration trenches.
b. River Rock trenches—shall be inspected annually. Sediment and debris (including leaves) shall be
removed and disposed of in accordance with all applicable federal, state, and local laws, In the event
that water does not leave the trench within 72 hours this is a sign of failure and the trench should be
repaired, ' uding excavating and replacing stone,to insure proper functioning.
Submitted b ) W.
y:
12-8-2021
Jolt . Surgr Date:
• Z
12-8-2021
John Te ullo,Property Owner Date: