HomeMy WebLinkAbout2002-10-07 Decision SPR Town of forth Andover E �oRrk
= o..%o ' d* 0
a
Office of the Planning Department 4. .
Community Development and Services Division
27 Charles Rreet "o� tlby
no oh�
North Andover, Massachusetts 01845
acr+us
Telephone (978)688-9535
Fax(978)688-9542
Notice Of Decision
Any appeal shall be filed
Within (20) days after the
Date of filing this Notice r.
In the Office of the Town "
Clerk {
7
Date: October 7, 2002
Date of Hearing: August 6, 2002,
August 20, 2002, September 1Q,
2002, October 1, 2002
Petition of: New England Power Company, 55 Bearfoot Road,Northborough,MA 01532
Premises Affected: on Foster Street
Referring to the above petition for a Site Plan Special Permit. The application was noticed
and reviewed in accordance with Sections 8.3 and 10.3 of the North Andover Zoning
Bylaw and M.G.L. c.40A, sec. 9.
So as to allow: Construction of an electric substation and access driveway located in the
Residential-1 Zoning District.
After public hearings given on the above date, the Planning Board voted to APPROVE,
the Site Plan Special Permit, based upon the following condi ' ns:
Signed:
/ lGti�
J n Simons, Chairman
Cc: Applicant Alberto Angles, Vice Chairman
Engineer Richard Nardella, Clerk
Abutters Felipe Schwarz
DPW George White
Building Department
Conservation Department
Health Department
ZBA
BOARD OF APPFALS 688-9541 BUILDING 698-9545 CONISI;RV>sTION 688-9530 KALTH 688-9540 1'LANNING688-9535
Site Plan Special Permit
New England Power Company, Foster Street, Map 28 /Parcel 29
The Planning Board herein approves the Site Plan Special Permit for the construction of a
528 s.f equipment enclosure and access drive. The structure is located in the R-1 Zoning
District. This Special Permit was filed on June 19, 2002 by New England Power
Company, 55 Bearfoot Road, Northborough, MA 01532.
The Planning Board makes the following findings as required by the North Andover
Zoning Bylaws Sections 8.3 and 10.3:
F0DINGS OF FACT:
1. The specific site is located within the Residential-1 Zoning District. A Special Permit
was granted by the Zoning Board of Appeals to allow this use in the Residential
District.
2. The use as developed will not adversely affect the neighborhood as a sufficient buffer
has been provided.
3. There will be no nuisance or serious hazard to vehicles or pedestrians.
4. There is considerable community need for the services provided by the Applicant.
5. A Special Permit under North Andover Zoning Bylaws Sections 4.12 (10) and 2.65
has been granted by the Zoning Board of Appeals on August 13, 2002.
6. An Order of Conditions has been granted by the Conservation Commission on August
28, 2002 and amended on September 6, 2002.
7. The Planning Board has granted a Lot I Slope Special Permit for this site, granted
October 1, 2002,
8. The applicant has met the requirements of the Town for Site Plan Review as stated in
Section 8.3 of the Zoning Bylaw.
Finally the Planning Board finds that this project generally complies with the Town of
North Andover Zoning Bylaw requirements as listed in Section 8.35 but requires
conditions in order to be fully in compliance. The Planning Board hereby grants an
approval to the applicant provided the following conditions are met:
SPECIAL CONDITIONS:
1. Prior to the endorsement of the plans by the Planning Board, the applicant
must comply with the following conditions:
a) The Plan must receive a satisfactory review report fi•om an outside
1
s
engineering consultant appointed by the Town. The Town Planner shall
review the report for consistency with the Planning Board's decision.
b) A bond in the amount of one thousand ($1,000) dollars in the form
acceptable to the Town of North Andover must be posted for the purpose
of insuring that a final as-built plan showing the location of all on-site
utilities, structures, curb cuts, parking spaces, topography, and drainage
facilities is submitted. The bond is also in place to insure that the site is
constructed in accordance with the approved plan.
2. Prior to the start of construction:
a) During construction, the site must be kept clean and swept regularly.
b) A construction schedule shall be submitted to the Planning Staff for the
purpose of tracking the construction and informing the public of
anticipated activities on the site.
3. Prior to FORM U verification (Building Permit Issuance):
a) The Planning Board must endorse the final site plan mylars and three (3)
copies of the signed plans must be delivered to the Planning Department.
b) One certified copy of the recorded decision must be submitted to the Planning
Department.
4. Prior to verification of the Certificate of Occupancy:
a) The applicant must submit a letter from the engineer of the project stating that
the building, signs, landscaping, lighting and site layout substantially comply
with the plans referenced at the end of this decision as endorsed by the Planning
Board.
b) Applicant shall submit a letter from a geotechnical engineer stating that all
slopes are properly graded and stabilized
c) The buildings must comply with applicable state fire and building codes.
S. Prior to the final release of security:
a) The Planning Staff shall review the site. Any screening as may be
reasonably required by the Planning Staff will be added at the applicant's
expense. The Town Planner will review the site and any screening as
may be reasonably required by the Town Planner will be added at the
applicant's expense.
2
j
b) A final as-built plan showing final topography, the location of all on- site
utilities, structures, curb cuts, parking spaces and drainage facilities must
be submitted to and reviewed by the Planning Staff and the Division of
Public Works.
5. Any stockpiling of materials (dirt, wood, construction material, etc.) must
be shown on a plan and reviewed and approved by the Planning Staff.
Any approved piles must remain covered at all times to minimize any dust
problems that may occur with adjacent properties. Any stock piles to
remain for longer than one week must be fenced off with siltation fence
and covered.
7. Any plants, trees or shrubs that have been incorporated into the Landscape
Plan approved in this decision that die within one year from the date of
planting shall be replaced by the owner.
8. The hours for construction shall be limited to between 7.00 a.m. and 5:00
p.m. Monday through Friday and between 8:00 a.m. and 5:00 p.m. on
Saturday.
9. The contractor shall contact Dig Safe at least 72 hours prior to
commencing any excavation.
10. Gas, Telephone, Cable and Electric utilities shall be installed underground
as specified by the respective utility companies.
11. No underground fuel storage shall be installed except as may be allowed
by Town Regulations.
12. The provisions of this conditional approval shall apply to and be binding
upon the applicant, its employees and all successors and assigns in interest
or control.
13. Any action by a Town Board, Commission, or Department, which requires
changes in the plan or design of the building, as presented to the Planning
Board, may be subject to modification by the Planning Board.
14. Any revisions shall be submitted to the Town Planner for review. If these
revisions are deemed substantial, the applicant must submit revised plans
to the Planning Board for approval.
15. This Special Permit approval shall be deemed to have lapsed October 1,
2004 (two years from the date permit granted) unless substantial use or
construction has commenced. Substantial use or construction will be
determined by a majority vote of the Planning Board.
3
16. The following information shall be deemed part of the decision:
Plan Titled: Woodchuck Hill Substation No. 56
Prepared For: New England Power Company
55 Bearfoot Road
Northborough, MA 01532.
Prepared By: National Grid, USA
55 Bearfoot Road
Northborough, MA 01532
Scale: varies per sheet
Date: March 21, 2002, last revised June 17, 2002
Sheets: Drawings number 2 through 7
Report Titled: Stormwater Design Report
Dated: Received with application.
Prepared By: National Grid, USA
55 Bearfoot Road
Northborough, MA 01532
Report Titled: Sound Study—Proposed Woodchuck Hill Substation
Dated: February 4, 2002
Prepared By: George A. Cook
cc: Applicant
Engineer
Abutters
File
4