Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 199 OLD CART WAY 11/15/2022 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 199 Old Cart Way MAP: 107.B LOT: 0108 INSTALLER: Blake Seale – 978-697-8773 DESIGNER: Vladimir Nemchenok / Bill Dufresne – 978-475-3555 PLAN DATE: 03.31.2022 BOH APPROVAL DATE ON PLAN: 05.04.2022 INSPECTIONS TANK INSPECTION: 07.27.2022 S.Casey DATE OF BED BOTTOM INSPECTION: 08.03.2022 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: 8/5/2022 – Leach field reconfigured due to ledge. Elevations on design plan had errors. D. Ottenheimer SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction / 2-piece (circle one) If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle / effluent filter installed (circle one) If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum ___ inch diameter Pipe penetrations appear watertight using rubber boots / hydraulic cement (circle one) Comments: 07.27.2022 Pass DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header (and vented if impervious material above) Retaining wall material, location and height if specified on plan Comments: 08.03.2022 S.Casey Ledge hit (see image) designer to re-design plan. 22 x 27 field gives 60 sq ft which is > 5 sq replaced SOIL ABSORPTION SYSTEM (Other) FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: 11.07.2022 seeded and loamed – S. Casey DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 187.72 HR = 1.07 HI = 188.79 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 3.10 185.36 186.35 Septic Tank IN 3.84 184.62 182.80 Septic Tank OUT 4.12 184.34 182.55 Distribution Box IN 5.70 182.76 182.30 Distribution Box OUT 5.88 182.58 182.13 Lateral 1 BEGINNING 5.96 182.50 182.10 Lateral 1 END 6.09 182.37 181.90 Lateral 2 BEGINNING 5.96 182.50 182.10 Lateral 2 END 6.09 182.37 181.90 Lateral 3 BEGINNING 5.96 182.50 182.10 Lateral 3 END 6.09 182.37 181.90 Lateral 4 BEGINNING 5.98 182.50 182.10 Lateral 4 END 6.09 182.37 181.90 Lateral 5 BEGINNING 5.96 182.50 181.10 Lateral 5 END 6.09 182.37 181.90