Loading...
HomeMy WebLinkAboutSeptic Approval - Correspondence - 600 FOSTER STREET 11/16/2022 North Andover Health Department Community and Economic Development Division November 16, 2022 Mike Abele 600 Foster Street North Andover,MA 0 1.845 Re: Subsurface Sewage Disposal System flan for 600 Faster Street (Map 10411,Lot 47) Dear Mr. Abele: 'I"he proposed onsite wastewater systein design plan for the above site elated 7/8/22 with a final revision date of 1.1/1/22 has been.approved for issuance of a Disposal System Construction Permit (DSCI'). Once issued, a DSC'P will authorize the construction of"the onsite wastewater system per the plan referenced above and as allowed under'l"'itle .5 of the:Massachusetts Environmental Code (31.0 CMl2. 15.000). You will. need involvement from the designer of the onsite wastewater systern throughout the installation process so YOU should be sure to coordinate with them. The design has been approved .for use in the construction of an upgrade on-site wastewater system for a 3-bedroorn home utilizing the existing septic tank and a standard stone-and-pipe soil absorption system as indicated on the design plan. This design plan approval is valid for 2 years fro:rn the above date. During this time, a licensed septic system installer should obtain a permit and complete this work., and a Certificate of` Compliance be endorsed by the installer, designer, and the Town of North Andover. If these activities are not completed within this time period then it is possible a new design plan will need to be completed and submitted for review, In the event an imminent health problem such as sewage backup into the dwelling is occurring the North Andover Board of Health may reduce the tame period for which this plan is valid. Tlxas approval is subject to the following conditions. Please be sure to review these with the designer and installer. Page 1. of 3 North Andover Health Department 1.20 Main. Street-Town Hall North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542 j. No sewage shall be discharged to the onsite wastewater system until as Certificate I of Compliance has been issued by this office In addition, you should be aware of"the long-term operation gUidChlleS Ofau onsite wastewater system (these are not part of the DSCJ1 but are tnentioned below as information for the property owner): I. An onsite wastewater system can function as ain integral part of the infrastructure of the property if it is properly operatcd and maintained. This is the, responsibility of the owner ol'the property and is generally not specified by regulation. You are encouraged to contact a wastewater system PLUTIper/service provider to partner with you to implenient, steps needed to cISSUre the lonV,evity of the onsite wastewater system being installed at this location The issuance of"a DSCP does not constrUe and/or imply compliance with any peri-nits, approvals or licenses which might be needed frorn other agencies such as the Conservation Commission, Zoning Board, planning Board, Building Insf.,)ector, Plumbing Inspector and/or Ellectrical Inspector. Please feel free to contact the of1ice with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and '8,SSUre protection of public health and the environnlent of North Andover. Sincerely, sterl 11 C asey Jr. I lealth Inspector, 'Town of North Andover Encl. Installers list cc: Vladimir Nemehenok, P.E. File ... ........ —------- Page 3 of North Andover Health Department 120 Main Street-'rown Hall North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542