Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 459 SALEM STREET 11/17/2022 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 459 Salem Street MAP: 038.0 LOT: 0055 INSTALLER: Peter Breen 978-687-7774 DESIGNER: Vladimir Nemchenok / Bill Dufrense 978-475-3555 PLAN DATE: 08.02.2022 BOH APPROVAL DATE ON PLAN: 09.28.2022 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 10.03.2022 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 10-19-22 D. Ottenheimer DATE OF FINAL GRADE INSPECTION: 10/31/2022 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction / 2-piece (circle one) If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle / effluent filter installed (circle one) If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum ___ inch diameter Pipe penetrations appear watertight using rubber boots / hydraulic cement (circle one) Comments: N/A – Existing Tank to be Used DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header Retaining wall material, location and height if specified on plan Comments: Bed Bottom – 10.03.2022 c layer visible, 30 x 50” LxW, Sand ok, using Torremeo Sand FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: 10.24.2022 S. Casey – Existing tank, 3 covers to grade need to bring inspection port to grade. 10.31.2022 – inspection port to grade. DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 100.00 HR = 0.30 HI = 100.30 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT Septic Tank IN Septic Tank OUT Pump Chamber IN Pump Chamber OUT Distribution Box IN Distribution Box OUT Lateral 1 BEGINNING Lateral 1 END 9.80 90.17 90.53 Lateral 2 BEGINNING Lateral 2 END Lateral 3 BEGINNING Lateral 3 END Lateral 4 BEGINNING Lateral 4 END 10-18-22 – Location of top of foundation could not be accurately determined so benchmark was not exact. Survey equipment was a laser with receiver located some 10’ in the air so was not accurate. Therefore, even though the rough calculations above indicate SAS is not at correct elevation this should be viewed as an estimate and not an exact measurement. Designer to provide as-built with confirmation. D. Ottenheimer