Loading...
HomeMy WebLinkAbout2019-06-04 Response Comments to NAFD SPR I a Prime 'F'r�(-wLgy coi'3si k'-n"11:' Inc. . L�.rItAvc.nrte - Sauj;s MA 0:1.9J[) M i Etc=ic;y %S:I.-?_ctE' 0201 fi j 25 Aprll 2019 Town of North Andover Planning Board 120 Main Street North Andover, MA 01845 RE: response to Review Comments—Fire Department Site An Application--Al. Prime Energy Consultant, Inc.--1725 Turnpike Street We received the following Fire Department comments via email from Staff Planner Monica Gregoire and added response comments in bold red text: Fire Department I The FD commentary Is as follows: e I'ftt''awRh Fire l c t1wrilon 000 Lt. M1Cl ael Bari€'ne W OI5 LMS C3MMa1B K1OWt 1. Relocate propane tank exchange storage cabinet away from Rt 114 side of building, preferably to the other side of the structure, to reduce the potential for cabinet being struck by moving vehicle leaving the roadway. AM Prime will install concrete and/or Steel lrompw s to I motet t thn cahin k which the M fci is will ad"i ,irately dic'!cabinet in lr¢o pf,sed locAjon at thm Rto 114 He of the building, A Mee is added to f.ho px€iposal sire layr,r.rt. 2. Perform a swept path analysis of parking lot using NAFD LS template to ensure NAFD apparatus can navigate the site. A copy of the Erne1r,Pen.y Vnhhde swept pFrt:h, vw, has beeia pr,€wided using ve hide data provided by the FO .and which cm'A€€ms t12:a tKa ,,r-s e eaw v0hr€l(-� can safely and r:e,rilde=udy n avwate the SH, 3, Request installation of a fire hydrant on the same side of the road as, and in close proximity to, either entrance due to storage and dispensing of flammable liquids at the location.A,L. j,,,ill r7 'IRe hydrant at the Intemec.tion of Route 114 and Q&Mal AveC9me r whikh is less thrin 250 fact from the proposed s'eom Kcat€cni and provides b t'or• fgdr<ant ccawaye € w dwellings at east: Sand of ColoMal Avenue, 4, While not required by code, due to the size of the proposed structure, we request that an automatic fire sprinkler system is installed.4.ilven that t:hp building l"s le:ss' fliarr halt the size rmqui€hIj a r,l:Ar-Ahr sytatc n , has a very lovi and shNi duraCion riri�a 4Mljl now hp wRIMi hose range of the rrr.=w hydrant the FE) feels that a bT fldirr3; is not required but can be in taHed at the ri1.`;f;i'Mears of AX Prime, Glv€?ri ' l-w cross Rmli:e 11,1%-vlCh a large � nem, service in order to hrstaH ii sprinkler, A.L. Pd'f-ne uvill not Itatall a i?ti€% si'yY'it"il{hr at Uhis €:frne, The fueling Kinds vrill be s:carrrpAar Oy covered by dry chcrnical suppre'ssiun systems inure appropriate for fs:rei Sires i:laan v.,aiter. 5. During construction, a construction site plan that meets 527 CMR Ch 16 as well as the applicable edition of NFPA 241,will be implemented. A.f... PrInne will 11-opleyllerit this rrequ irerrrent. 6. We noted that secured key access box included in submission [North elevation view, pg SGA] A.p.:. i'rirra€i %AH install a "I wx box" or slraHar key access per whatever North 6lrrr.lrwer Fh'r-'. Depaa i tra enA prefers/specs at the tirrie of r:r,ns, rrrcdon, 7. We noted that the fire alarm panel will be tied to FD radio box [General notes 5.101 f J, Prime ,Asill p:')rov1de central monitoring and alarm fm nel tits to FD radio box per whatever J�, Aradnver fire Department prefers/specs at the tithe of construction. A.fw. Prir3-ie will also sttl;irrld"i an alarm devVe laydmA psi;n fm FO review as },fired as filing for alarm sySicrii irrd<allation p;emit via the on-lire 1llrswlroht pernri9: rip:ip-a=don pmcesr. 8. Provide documentation showing diesel pump fire suppression system meets UL 1254. /�copy of i;hn list systern fire ha pecdon rop:mt has been pr'ciAded ducrrmentprrg that the exirrUn mterny at tl-iis facility are hoth cut'candy i_fl,.-J.�.1;4 c;crinpli ant. '1 he change In the gas it,k nd 5y 1-'rn is (-lire to the aiteration of th fi fflit1� art'Ki. AtUched is.;a s:c yy of a Baal on of the revisers We hyuut sprcrwirig, wite changed to Include pwtecticrrl uf they propane caa{short and a noW indIcaUng, the h`rr;trafieidon of a new fire hydrant, Also arttac:faacf is a copy A the Enic?Momy Ahicfe wept p Ki plan and the J<irau ar'y fire suppression system lnspectiolr c:on fraOng that the c',;hUng systems am t:if..-nS c;ermialiparlt. Sincerely, t'` - -- — Antho C b , P.E., Engineer A.L. Prime energy Consultant, Inc. Mobile--512-745-6400 1 Anthony.Guba@ALPrime,com 1 41112019 Town of North Andover Mail-Department Review-1725 Turnpike Street(Correction) i A. WOVE>2 hdassachutts. { Monica Gregoire <mgregoire@northandoverma.gov> Department Review - 1725 Turnpike Street (Correction) Mike Beirne <m bei rne @north andoverma.gov> Thu, Mar 21, 2019 at 5:09 PM To: Monica Gregoire <mgregolre@northandoverma.gov>, William McCarthy<wmccarthy@northandoverma.gov> The FD commentary is as follows: i 1. Relocate propane tank exchange storage cabinet away from Rt 114 side of building, preferably to other side of structure, to reduce potential for cabinet being struck by moving vehicle leaving roadway. 2. Perform a swept path analysis of parking lot using NAFD L1 template to ensure ensure NAFD apparatus can navigate site. 3. Request installation of a fire hydrant on the same side of the road as, and in close proximity to, either entrance due to storage and dispensing of flammable liquids at location. 4. While not required by code, due to the size of the proposed structure, we request that an automatic fire sprinkler system be installed. 5. During construction, a construction site plan that meets 527 CMR Ch 16 as well as the applicable edition of NFPA 241, will be implemented 6. We noted that secured key access box included in submission [North elevation view, pg SG-11 7. We noted that fire alarm panel will be tied to FD radio box[General notes 5.10] 8. Provide documentation showing diesel pump fire suppression system meets UL 1254. [Quoted text hidden] Lt Michael Beirne North Andover FD 795 Chickering Rd, North Andover Ma. 01845 978-688-9590 i https:llmall.google.com/m ai llul0?ik=dadd l 872e7&view=pt&search=al l&pe rm msgi d=msg-f%3Al 628650981721355113&slm pl=msg-f%3Al6286509817.,. 1/1