HomeMy WebLinkAboutConstruction Notes - Consultant Review - 79 FULLER ROAD 12/1/2022
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 79 Fuller Road MAP: 65 LOT: 80
INSTALLER: James Boraczek – 978-479-5236
Permit # 69642 vp
INSPECTIONS
Inlet Outlet Baffle Only – 12.01.2022 S.Casey
SEPTIC TANK
Building sewer in continuous grade, on
compacted firm base
Cleanouts per plan
Bottom of tank hole has 6” stone base
Tank size and loading per plan
Monolithic tank construction / 2-piece
(circle one)
If monolithic, water tightness of tank has been
achieved by visual testing
If 2-piece, water tightness of tank has been
achieved by water / vacuum test (circle one)
Inlet tee installed, centered under access port
Outlet tee installed, centered under access port
Gas baffle / effluent filter installed (circle one)
If effluent filter, riser to finished grade over filter
Riser with cover to within 6” of finish grade
installed over one access port
Manhole and riser minimum ___ inch diameter
Pipe penetrations appear watertight using
rubber boots / hydraulic cement (circle one)
Comments: Replaced pipe to d-box from tank
- Slope present (level used), all Sch.40