Loading...
HomeMy WebLinkAboutConstruction Notes & photos - Consultant Review - 25 Beechwood Drive 12/27/2022 North Andover Health Department (ommunity and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 25 Beechwood Drive MAP: 34 LOT: 50 INSTALLER: Rocci DeLucia, Jr. DESIGNER: Ben Osgood PLAN DATE: 10/18/21 BOH APPROVAL DATE ON PLAN: 11.18.2021 INSPECTIONS TANK INSPECTION: 06.28.2022 S.Casey DATE OF BED BOTTOM INSPECTION: 6.17.2022 sand — 06.21.222 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 9/28/22 — D. Ottenheimer 10/21/22 — D. Ottenheimer. 10/26/22 — D. Ottenheimer DATE OF FINAL GRADE INSPECTION:12/22/2022 S. Casey SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: SEPTIC TANK ® Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ® Tank size and loading per plan Monolithic tank construction ® If monolithic, water tightness of tank has been achieved by visual testing ® Inlet tee installed, centered under access port ® Outlet tee installed, centered under access port ® Gas baffle installed ❑ Riser with cover to within 6" of finish grade installed over one access port ® Manhole and riser minimum 20 inch diameter ❑ Pipe penetrations appear watertight using rubber boots Comments:9/28/22 — Pipe existing septic tank at an angle, boot held on with metal clamp. Requested contractor demonstrate that this connection is watertight at the next construction inspection. D. Ottenheimer 10/21/22 — Contractor demonstrated watertightness of tank penetration. D. Ottenheimer DISTRIBUTION-BOX ❑ Installed on stable stone base ® H-20 D-Box ® Inlet tee (if pumped or >0.08'/foot) ® Hydraulic cement around inlet & outlets ® Even distribution observed ® Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) ❑ Bottom of SAS excavated down to specified soil layer, as provided on plan ® Size of SAS excavated as per plan ® Sand installed, if specified on plan ® Sand displays few fines when handled ❑ 40 Mil HDPE barrier installed, if specified on design plan ® Laterals installed and ends capped or connected to header (and vented if impervious material above) ❑ Retaining wall material, location and height if specified on plan Comments: 9/28/22 — Leach stone contained fines and unsuitable material adhered to it. To be removed, bed bottom inspection performed, then re- inspected. D. Ottenheimer 10/21/22 — Leach trench elevations were incorrect by as much as 9". Need to be re-constructed. D. Ottenheimer 10/26/22 — Re-inspection showed additional stone added to leach trenches to make pipe inverts correct FINAL GRADE ® Final cover as per plan ® Loamed ® Seeded ® Cover per plan Comments: 12.22.2022 S.Casey seeding and straw placed DOCUMENTS NEEDED ® Certification of Installation Form submitted by designer and signed and dated by designer and installer ® As-Built Plan by designer 10/21/22 — Benchmark on the onsite wastewater design plans no longer available. New benchmark had been established at elevation 67.09. Engineer requested to provide a statement indicating this is correct and acceptable to use. D. Ottenheimer BM = 67.09 H R = 2.44/2.82 HI = 69.53/69.91 Tank and D-box were examined on 10/21 using HI 69.52, Trenches were examined 10/26 using HI 69.91 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 65.50 Septic Tank IN 4.61 64.59 64.50 Septic Tank OUT 4.78 64.42 64.33 Distribution Box IN 5.10 64.10 64.08 Distribution Box OUT 63.90 Lateral 1 BEGINNING 5.90 63.68 63.60 Lateral 1 END 6.21 63.37 63.35 Lateral 2 BEGINNING 5.88 63.70 63.60 Lateral 2 END 6.19 63.39 63.35 GRAINSIZE DISTRIBUTION REPORT - AGGREGATE GRADING I I c c c c 5 0 0 0 0 IIIIIII III 0 0 IIIIIIIIIIII a 100 IIIIIIII III AoaIIIIIIIIIII I M ESBURY SCHOOL-SAND&GAEL 90 07 0 60 1114,4211 j 20 2: m 60 40Z 50Z �Mm4, w40 60m a3o 70` 20 80 10 I I I I s0 0 100 1000 100 10 1 0.1 0.01 0.001 GRAIN SIZE-mm. %Gravel %Sand %Fines %+3" Coarse I Fine lCoarsel Medium Fine Silt Clay 0 12 20 11 3b 19 2 SIEVE PERCENT SPEC." PASS? Material Description SIZE FINER PERCENT (X=NO) SAND AND GRAVEL. 3 100 100 2 98 1.5 96 Atterberg Limits 1 91 3/4 88 PL= LL= PI= 1/2 81 50-85 Coefficients 3/8 77 ;D90= 23.2806 D85= 16,0971 D60= 2.4904 #4 68 40-75 ;D50 1.2823 D30= 0.5743 D15= 0.3422 #10 57 D10= 0.2651 Cu= 9.39 Cc= 0.50 #20 41 Classification #40 21 10 35 USCS= SP AASHTO= #50 12 #60 9 Remarks #80 5 #100 4 #200 1.6 0.0-8.0 AMESBURY SCHOOL-SAND&GRAVEL Source of Sample:BEECHWOOD DR,No.ANDOVER STOCKPILE Sample Number: Lzl149A Date: 9-30-21 Client: M T T CRENG1rtTERr\G&TESTING,1NC. Project: FRANK DELUCIA&SON QC Project No: 21.113.NH Figure L21349A Tested By: DM/NL GRAINSIZE DISTRIBUTION REPORT - AGGREGATE GRADING S. S. N t0+1 Q 0 100 AMES III III 1I 1 1I I 1I II I II II II II II GRANULARFILL 0 90 1 1 1 0 so111Y11 _ I 20 ►— I I I I I I I I �"-:� I I I I I = 70 30 I I I I I I I r I I I I T 4i. r m I I I I I I �� 1r {I I I I 40 z w I I I I I I j gI I I so m Z 40 s t 60 w z m w 30 70 0- I I I I I I I I �� ' I 20 a 80 10 I I I I I I f 90 I I I I I I I I I I I ° 100 1000 100 10 1 0.1 0.01 0.001 i GRAIN SIZE-mm. % +3„ %Gravel %Sand %Fines Coarse Fine Coarse Medium Fine Silt Ciay 0 12 20 11 36 19 2 SIEVE PERCENT SPEC.` PASS? Material Description SIZE FINER PERCENT (X=NO) SAND AND GRAVEL. 3 100 2 98 15 9 1 91 Atterberg Limits 3/4 88 PL= LL= P1= 1/2 81 Coefficients 3/8 77 D90= 23.2806 D85= 16.0971 D60= 2.4904 #4 68 D50= 1.2823 D30= 0.5743 D15= 0.3422 010 57 30-90 D10= 0.2651 Cu= 9.39 Cc= 0.50 #20 41 Classification #50 12 1070 0# USCS= SP AASHTO= #60 9 Remarks #80 5 #100 4 #200 1.6 0.0-15 AMMURY SCHOOL-GRANULAR FILL Source of Sample: BEECIIWOOD DR.No.ANDOVER STOCKPILE Sample Number: L21349A Date: 9-30-21 Cllent: MU.IYR ENGINTtERMG&I SMG,INC. Project: FRANK DELUCIA&SON QC 04 Pro ect No: 21.113.NH Figure L21349A Tested By: DM/NL 10/3/22,7:37 AM IMG 2429.JPEG v wit .r Ar a t , r. 1 Y r ^ v` �Y �, Rs V. i ' ` F , T �.t�� " s , . . 3 k - ` I afS s g s v e v ^ qq 00, :g r ` •' 1 e ��E ..t t a ' ::.�r k';- fib� { � ..•� d i https://mail.google.com/mail/u/0/#inbox/FMfcgzGgQmSFDGCZrBnitNvIgShNvxfr?projector=l&messagePartld=0.2 1%1 1013/22,7:37 AM IMG_2424.JPEG w � � .fir' "µR� '•: �" . .. a 1 _ i 3 � 5 Wig 4 V ' 2 hftps:Hmail.google.com/mail/u/0/#inbox/FMfcgzGgQmSFDGCZrBnitNvIgShNvxfr?projector-1&messagePartld=0.3 1/1