Loading...
HomeMy WebLinkAbout2007-08-08 Application SPR No ark Town of North Andover Office of the Planning Department Commuxdty Development and Services Division r'—I'f"0"F[) " , 1� ( A' 1600 Osgood Street North Andover,Massachusetts 01845 sr 4 hjjR:Z w-w-w.townofnor thandover. has eStamp c" wr er im Lincoln Daley P 978-688-9535 Town Planner F 978-688-9542 Town of North Andover Planning Board M Milo, Please type or print clearly: 1. Petitioner: GFM General Contracting CoM, Address: 325 North MainStreet No- ISM,Middleton NIA 01949 Telephone Number: L617) 877-9963 2. Owners of the Land: can Paul R.--Pro_ulx Address:­L812 TMnike Street North Aid:oy—er,MA 01845 Telephone Number:_ Number of years ownership: 47'Years ' If applicant is not the owner,please state interest in property:Agplicant has ent ered into a Purchase Ment-mjLh the Owner. I Request for a Special Permitmider Sections-,8&2)(ajfl) & -10.3--of the North Andover ZoMing' Bylaw'§eeWn g Construction of -Site PIN Special Permit for the .q15,900 retaiVoffte building to be located at 1820- 1830 Turnpike Street. 4. Location of Property: 1812, 1820-L830 Turnpike Street(Route 114) Zoning District: General Business (GB)—_ — Assessors: Map: LORL— Lot# 4§and 47 Registry of Deeds: Book#:202 Page# 119 Existing Lot: (VACANT) Lot Area (Sq.Ft): _ 88g45 Building Height:, Street Frontage: 383.85 Side Setbacks: N Front Setback:- Rear Setback: A Floor Area Ratio; Lot Coverage: N/ NIA 6. Proposed.Lot(if applicable): Lot Area (Sq.Ft): 88,245 , r, Building Height: 44.6 Street Frontage: 383.85 Side Setbacks: 25 .„ Front Setback: 106.00 hear Setback. 36 Floor Area Ratio: NIA-- Coverage: 23.92% 7. Required Lot(as required by Zoning Bylaw); Lot Area(Sq.Ft.): 25,000 Building Height: 45 Street Frontage: 12,__5.0_, Side Setback: 25 1 Front Setback: i 1 .00 _ Rear Setback: 35 (1) Floor Area Ratio: WA », Lot Coverage: 35.OQEo (1) Setback may be required to be increased by 15 feet where locus is determined to abut a residential zone. S. Existing Building(if applicable):N/A Ground Floor(Sq.FL) #of Floors Total Sq.Ft.; Height: Use: Type of Construction: 9. Proposed Building: Ground Floor(Sq.Ft.) 11,025 #of Floors 2 Total Sq.Ft.; 25.909 Height: 44.6 ft. Use: Commercial(4ftice/RetaM _ Type of Construction: Wood Frame 10. Has there been a previous application for a Special Permit from the Planning Board on these premises?Yes.. If so,when and for what type of construction?The site received a Site Plan Special Permit bv_ lecision,dated December 20 2091 for th couLtogfioa of a 2-story clapboard and woo metal frame offic /lretail building.Such approval has expired and was not used. i 11. Petitioner and Landowner signatare(s): Every application for a Special Permit shall be made on this form which is the official form of the Planning Board. Every application shall be filed with the Town Clerk's Office. It shall be the responsibility of the petitioner to furnish all supporting documentation with this application. The dated copy of this application received by the Town Clerk or Planning Office does not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and legal notification. Failure to comply with application requirements,as cited herein and in the Planning Board Rules and Regulations may result in a dismissal al by the Planning Board of this application as incomplete. GFM General Contracting Corp. By i atto a rmlak&Vaughan LLP Petitioner's Signature; ' Print or type name her .Gino Fodera.President `Jean Paul R.Prouls,by the Applicant,GFM General Contracting Corp.pursuant to Owner letter of Authorization,B p lica t' tto a s,Smolak&I ughan LLD Owner's Signature: W Print or type name here: o P ul IL roulx TOWN OF NORTH ANDOVER. PLANKING BOARD APPLICANT: GFM GENERAL CONTRACTING CORP. OWNER.: JEAN PAUL R. PROUD PROPERTY: ASSESSOR MAP 106.1)PARCELS 46 and 47 1812, 1820-1830 TURNPIKE STREET, NORTH.ANDOVER MEMORANDUM IN SUPPORT OF ALPLIgATION FOR SITE PLAN REVIEW ,SPECIAL PERMIT (Sections 8.3 and 10.3 of North Andover Zoning Bylaw) I. INTRODUCTION GFM General Contracting Corp. is the applicant(the"Applicant") seeking site plan approval of a proposed 25,909 +/-s.f. retail/office building„Project" as further described below. Specifically, the Applicant is the prospective purchaser of certain real property consisting of 2.026 acres (88,245 s.f.),known and numbered as 1820-1830 Turnpike Street,located between Turnpike Street(Route 114) and Berry Street and is designated on the Town Assessor's Maps as Map 106D,Lot 46,along with a 4,085 s.f. portion of said adjacent lot,known and numbered as 1812 Turnpike Street,shown on the Town Assessor's Maps as Map 106D,Lot 47 over which the Applicant has obtained easement rights to the west of the building site (also owned by the Owner) to construct parking,landscaping and other improvements as shown on the Site Plans attached hereto as Exhibit A (the"Property"). The Property is owned by Jean Paul R. Proulx (the"Owner"). The Owner acquired the Property by deed from Ernest J. Morin,dated September 23,1.959 as recorded at Book 902, Page 119 of the Essex County North District Registry of Deeds. The Property is located in the General Business ("GB") Zoning District, where the proposed use of the Property as a mixed commercial use (retail/office) is permitted by right,subject to site plan review. Please also note that the Planning Board previously voted to grant a special permit/site plan approval by decision, dated December 0,2001,to the Owner for the construction of a"two-story clapboard and wood/metal frame office/retail,building„ on 1820-1830 Turnpike Street(the 2001 Decision"). The 2001 Decision,however,has since expired. II. PROPOSED PROJECT The Applicant,GFM General Contracting Corp.,proposes the following project, including: (a) the construction of a two-story traditional style commercial office and retail building of 25,909 square feet in size, including; Site Plan Review Memorandum — Planning Board 1 (i) 9,184 s.f. of first floor space, of which 5,840 s.f. would be dedicated to general retail use, and 3,344 s.f. of first floor space would be dedicated to a specialty retail convenience market use;and, (ii) 10,911 s.f. of second floor office space,along with 5,814 s.f. of storage space available in the attic above the second floor; (iii) and having a building exterior which includes a combination of brick, simulated stucco and millwork to provide a residential scale to complement and serve as a transition to the current and proposed residential uses adjacent to the Property. (b) the construction of a total of 98 parking spaces,along with Colonial-style lighting as shown on the Landscaping Plan attached hereto; (c) the construction of a main site access drive to be located on Route 114,with two (2) secondary drives located along Berry Street;and, (d) the extensive re-landscaping and re-vegetation of the front,side and rear yards as shown on the Landscaping Plan. A set of building plans is attached as Exhibit B. A perspective rendering of the building and other site improvements is attached as Exhibit C. A Lqnd�sca PI i�n MA for the Property is attached hereto as Exhibit D. Collectively,the proposed improvements as described above and as shown on Exhibits A through D shall be referred to as the Project. RE'QUIRED RELIEF Based upon our Preliminary review of the proposed improvementsand after a meeting with the Building commissioner, the Applicant has determined that a Site Plan Review Special Permit will be required to be issued by the Planning Board in accordance with Sections 8.3 and 10.3 Of The Zoning Bylaw of the Town of North Andover,as most recently amended in May,2006 (the-Zoning Bylaw"). In addition to approvals required from the Planning Board, the Proposed Project will require either a finding by the Zoning Board of Appeals (or in the alternative,a rear yard setback variance) to enable the building to be constructed a distance of 36 feet fro Berry Street,a Wetlands Order of Conditions issued by the North Andover m Conservation Commission, local sewer and water connection permits to be issued by Site Plan Review Memorandum — Planning Board 2 the Department of Public Works,and various licenses and other approvals to be issued by the Board of Health as well as the Board of Selectmen in its capacity as Licensing Authority. In addition,the Project will require the issuance of a curb cut permit from MassHighway. Over the course of the past six months,representatives of the Applicant have met with individual representatives of the Planning Department,the Building Department, Board of Health,Fire Department,and Conservation Commission. The Applicant's Project was also reviewed by the Towes Technical Review Committee (TRC). As a result of those meetings and consultations, a number of their recommendations have been incorporated into the Site Plans. IV. SITE PLAN REVIEW AND SPECIAL PERMIT CRITERIA Section 8.3(6) and Section 10.31 of the Zoning Bylaw list the criteria by which the Planning Board will evaluate the Project as part of its site plan review special permit process. A description of these criteria, and how the Project meets such criteria,are described as follows: SITE PLAN REVIEW GRIT .(Section 8.31 GENERAL a. Conformance with all appropriate provisions of the Zoning Bylaw. The proposed uses of the site for retail/office uses are uses allowed by right in the General Business(GB) Zoning District. Except for the rear yard setback which is subject to both a pending request for finding and petition for variance, the Project conforms to all dimensional criteria listed in Section 7,including but not limited to,Table 2(Summary of Dimensional Requirements),of the North Andover Zoning Bylaw. Compliance with dimensional requirements is summarized on the Site Plans as well as on the Site Plan Review Application Form. b. Protection of abutting properties from detrimental site characteristics. The Project provides appropriate building setbacks from the adjacent properties. The adjoining properties are zoned both ViUa&e Residential(VR) as well as Residential-3 (R-3),and will not be negatively impacted by the proposed Project In fact,the Project in fact will provide an essential service and complement the surrounding uses. Site Plan Review Memorandum -- Planning Board 3 ENVIRONMENTAL a. Protection of unique or important natural,historic or scenic features. The majority of the site is cleared and is maintained by routine mowing activities. Woody vegetation is limited to a tree overstory along the eastern and northeastern property boundaries. All trees located outside the development limits will be preserved. Wetland resource areas will not be impacted,as the 25- foot Non-Disturbance Zone described in the North Andover Wetlands Protection Bylaw will be maintained,and other storm water management Best Management Practices (BMPs) measures will be implemented to protect wetland resource areas. Additionally,a Buffer Zone Enhancement Plan will be implemented within the 25-foot No-Disturbance Zone to re-vegetate areas previously altered by mowing activities. b. Adequacy of proposed methods of refuse disposal. The Project includes a disposal area located to the northeast side(or rear)of the Property. The disposal area (which will be screened with a six-foot chain link fence with privacy slats)will adequately handle the needs of the building,and provide for appropriate screening of the.facilities. Solid waste disposal would be handled by a private commercial,hauler. c. Ability of proposed sewage disposal and water supply systems within and adjacent to the site to serve the proposed use. The Project will be connected to the municipal water system and sewer system which ties into a main located in Turnpike Street. Based upon the Project Engineer's discussion with the DPW,sufficient capacity exists within the municipal system to accommodate the proposed Project's water and sewer needs. d. Adequacy of the proposed drainage system within and adjacent to the site to handle the increased runoff resulting from the development. A sub-surface drainage system is being proposed,and accommodates all runoff resulting from the development. This system employs Best Management Practices and includes the installation of deep sump catch basins,an infiltration bed,and stormceptors which will provide pretreatment of stormwater runoff. All drainage and runoff systems are designed to prevent the contamination of groundwater,and drainage and runoff will be recharged onsite. Site stormwater will be managed in accordance with the DEP's Stormwater Management Policy and related technical guidance,and will also be separately reviewed as part of the wetlands review process by the North Andover Conservation Commission. Please refer to the enclosed excerpt from the Stormwater Management Report attached as Exhibit E for additional information. Site Plan Review Memorandum -- Planning Board 4 e. Provision of adequate landscapin&including the screening of adjacent residential uses,provision of street trees,landscape islands in the parking lot and a landscape buffer along the street frontage. As noted above,the majority of the site is cleared and is maintained by routine mowing activities. Woody vegetation is lin-dted to a tree overstory along the eastern and northeastern property boundaries. All trees located outside the development limits will be preserved. This submission also includes a Landscape Plan providing proposed landscaping within the parking lot,side yards,rear yards and front yard areas which show additional buffering and screening areas. A copy of the Landscape Plan is attached. f. Adequacy of the soil erosion plan and any plan for protection of steep slopes,both during and after construction. All proposed grades within landscape areas will not exceed 2:1,and all slopes will be stabilized both during and after construction. The Applicant will take particular care with respect to maintaining enhanced erosion and sedimentation controls to avoid impact to both on-site wetlands and adjacent properties. g. Protection of adjacent properties by minimizing the intrusion of lighting,including parking lot and building exterior lighting. A lighting facilities plan has been provided as a part of this submission. Lighting will not cause glare and will minimize spillover onto adjacent properties or streets. h. The proposed development must not present a demonstrable adverse impact on the surrounding area resulting from excessive noise,dust, smoke,or vibration which are higher than levels now experienced from uses permitted in the surrounding area. The proposed use is to be located adjacent to Route 114 and is surrounded by commercial,residential and agricultural uses. The Project includes the construction of a retail/office building similar to that previously approved by the Planning Board in 2001,but substantially enhanced in appearance from that project approved in 2001. The Project layout has been designed to ensure that there will be no long-term impact on the surrounding area from excessive noise, dust,smoke or vibration. Site Plan Review Memorandum Planning Board 5 DESIGD! a. Buildings shall be located with respect to setbacks,placement of parking,landscaping and entrances and exits with surrounding buildings and development. The proposed site plan conforms to the required building setbacks except as otherwise provided above,and no conflict will exist between this site and the existing parking,landscape,entrance or exit of another adjacent use. The Traffic Impact and Access Study (the"Traffic Report )provides additional detail on the adequacy of site circulation as related to existing surrounding buildings and development. A copy of the Traffic Report is attached as Exhibit F. b. The buildings shall relate harmoniously to each other in architectural style,site location and building exits and entrances. The Colonial style of the proposed building has been designed in a manner to blend into the area architectural style,and will complement the surrounding neighborhood. A set of architectural elevation plans is attached as part of the Site Plans. C, Screening shall be provided for storage areas,loading docks,dumpsters, rooftop equipment,utility buildings and similar features. The proposed refuse area will be screened with a 6'chain fink fence enclosure with privacy slats. All mechanical,electrical and HVAC units have been either located within the building or will be suitably screened,and will not be visible, or create a nuisance,to surrounding properties. d. Electric,telephone,cable t.v,and other such lines and equipment must be placed underground. All utilities on the Property will be located underground.Please refer to the enclosed utility plan shown as part of the Site plans for more detailed information. e. Demonstrate that the scale,massing and detailing of buildings are compatible with those prevalent in the surrounding area. The Project structures will be designed to respect the scale and style of the buildings in the surrounding neighborhood.Please refer to the attached architectural renderings and elevations for additional detail. Site Man Review Memorandum — Planning Board 6 TRAFFIC/PARKINCx a. The location and number of curb cuts shall be minimized to reduce turning movements,and hazardous exits and entrances. The location and number of curb cuts proposed has been reviewed and is appropriate for the proposed use,as further described in the Traffic Report. The driveway has been designed to provide sight lines that exceed minimum requirements for safe stopping distances.The proposed landscaping and signs in the vicinity of the site driveway have been located sufficiently back from Turnpike Street so as not to impede the available sight distances.Turns into the site driveway will operate at level-of-service (LOS)B or better during the peak hours. Exiting movements from the site driveway will operate at LOS D or better during the peak hours. b. Provision for access to adjoining properties shall be provided as appropriate. .The Applicant has examined the feasibility of extending access from the 1820-1830 Turnpike Street onto and through to the existing access point onto Route 114 through the Equestrian Shop entrance at 1812 Turnpike Street. Although the project has been granted easement rights to use a portion of 1812 Turnpike Street for parking,landscaping and other improvements,the Applicant has been unable to secure rights from the Owner to access across 1812 Turnpike Street westerly through the existing driveway onto Route 114. Moreover,given the presence of existing wetland resource areas and buffer zones located to along the easterly boundary of 1820-1830 Turnpike'Street, it is not feasible to extend access onto the property abutting the Property to the east. C. Driveways shall be located opposite each other wherever possible. Given the odd-shaped configuration of the property, and the resulting difficulty in placing driveway access points in a manner which will maximize efficiency and safety of pedestrian and vehicular access,it is not possible to locate driveways opposite of one another and still maintain safe and effective traffic circulation both on and adjacent to the Property. d. Joint access driveways between adjoining properties shall be encouraged. To the extent a new use is made of the Equestrian,Shop premises, joint access driveways will be re-examined at that time. As noted above, Site Plan Review Memorandum -- Planning Board 7 a connection may not be feasible due to the inability of the Applicant to secure through access onto 1812 Turnpike Street. e. Internal circulation and egress shall provide for traffic safety,and access to and from minor streets servicing one family dwellings shall be minimized. Internal circulation has been designed to minimize conflicts between vehicles and pedestrians,all as more detailed in the Traffic Impact and Access Study. Further,although access is provided onto Berry Street,such access is safe and effective to enhance traffic circulation on and adjacent to the property. SEE_(:UL EE_RAM APPROVAL CRUF jRIA(Section 10J11 Section 10.31 of the Zoning Bylaw provides that the Planning Board shall not approve any such application for a Special permit unless it finds that in its judgment all the following conditions are met. The following lists the criteria and how these criteria are met. a. The specific site is an appropriate location for such a use,structure or condition. As the property is zoned for retail and office use,the site is an appropriate location for the proposed Project. The site design compliments the surrounding uses and provides for sufficient traffic and circulation improvements,as well as sufficient water,sewer and other utilities. b. The use as developed will not adversely affect the neighborhood character. The Project provides appropriate building,landscaping and screening setback from the adjacent properties. The character of the Colonial-style building will complement the architectural style of existing buildings in the neighborhood, and the use is well suited for its proposed location. C. There will be no nuisance or serious hazard to vehicles or pedestrians. Driveways have been located to provide for the best available sight distance along Osgood Street. Site improvements have been desired to maxin-dze on-site and off-site safety. For additional detail please refer to the enclosed Traffic Report prepared by DJK Associates,Inc. d. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. Site Plan Review Memorandum — Planning Board 8 k The project is adequately and appropriately serviced by municipal water and other utilities that adequately address the needs of the Project. Stormwater management facilities will provide adequate treatment of stormwater in accordance with applicable requirements. Gas station facilities will be designed and operated in accordance with federal and state regulations,as well as recommendations of the North Andover Fire Department, e. The use is in harmony with the general purpose and intent of this Zoning Bylaw. In addition to the reasons described herein and as shown on the Site Plans and other information submitted as part of the site plan review process,the.proposed use is in harmony with the general purpose and intent of this Zoning Bylaw for the following reasons. First,the location of the proposed Project is ideally suited to perform a service function to the future redevelopment of the Route 114 corridor in this area of North Andover. Second,the siting of a facility in the proposed location will complement existing and proposed uses in this general area of Route 114, Third,the project will substantially enhance the aesthetics of the property with new building design,landscaping and screening. fourth,the Project will return a currently vacant and unused property back into productive use,and will provide an important source of new tax revenue to the Town. Fifth.,based upon the Applicant's experience with similar facilities,the off-street parking provided is adequate to serve the uses of the property in a safe and effective manner. Lastly,the project,as shown on the site Plans,complies with the Zoning By-Law. For these reasons,all of the proposed improvements and enhancements noted herein are in harmony with the general purposes and intent of Section 1 („Purposes") of the North,Andover Zoning Bylaw. V. REQUEST FOR APPROVAL For the above reasons,the Applicant,GFM General Contracting Corp.,respectfully requests that the Planning Board make the required findings and conditions described under Sections 8.3 and 10.31 of the North Andover Zoning Bylaw, and grant the Applicant's request for Site Plan Approval. Respectfully submitted, GFM General Contracting Corp. By s attorneys, ohn T. Smolak,Esq. Smolak&Vaughan LLP 820 Turnpike Street, Suite 203 North Andover, Massachusetts 01845 Site Plan Review Memorandum .- planning Board 9