HomeMy WebLinkAbout2005-09-20 Decision SPR i- CIEIVE'U
0
C-�!
ffIce i3f the 'PlAnning Depubnent T
Ti
"Ll-ILm"ty De-velopm,ent and Sery Aces Mt MW 3 PM 12!
14,
400 Osgood Street
North Andover, Massachusetts 01845
http://w+,v�v.townofnorthandover.com H
v.townofnorthandover.com OR H A'H'D"b\)
MASSACr
rim pl"Illner
F 0' t) 688-9-42
NOTICE OF DECISION
Any appeal shall be filed
kl'ithin (20) days after the
date of filing this Notice
in the office of the Town Daw: Scptciubor 20, 2005
Clcxk. Dift of Hearings: September 6—September 20. )005
Potition of WTF. LLC, P.O. Box 995, 492 Sutton St., N. Andover, NIA
Premises -UTected: 492 Sutton Street. (airport) North Andover, MA 01845
Referring to the above petition for a Site Plan Review Special Permit, from (he
requirements of the North Andover Zoning Bylaw, Section 8.3, 10.3, and 10.31,
So as to allow the construction of two (2) metal buildings (hangars) each totaling 6,640
Square feet within the .industrial-2 Zoning District.
IRO VE
At a public hearing given oa the above date the Planning Board voted to ATP. a
n Rmfiew Special Permit based on the following conditions:
Signod:
Lincoln Daft y, Town Planner
Richard Nai'della, Chair
-A)hn �ialofls' Vice chaii
fames, Phinney, C14trk
Alberto Ans'kns
jack
0-A,',hnrd RoxA, -U[PPiat;�
Site Plan Review -Special Permit Mup 76, Lot 3
492 Sutton Strget—Construction of Two Hangers
The Planning Board herein approves the Special Permit/Site Plan Review For the construction of
two (2) metal buildings (hangars) each totaling 6,640 square feet within the Industrial-2 Zoning
District, Map 76, 'Lot 3, This Special Permit was requested by WTF, LLC, P.O. Box 995, 492
Sutton St., North Andover, MA 01845, This application was filed with tite Planning Board on
August 5, 2005. The applicant submitted a complete application which was noticed and reviewed
in accordance with Sections 8.3, 10.3, and 10.31 of the Town of North Andover Zoning Bylaw
and MGL c.40A, sec. 9. A Public hearing was held on September 6,2005,
The Planning Board makes the following f lldings as required by the North Andover Zoning
Bylaws Section 8.3 and 10.3;
FINDINGS OF FACT:
I. The specific site is an appropriate location for the structures, as they will be constructed
adjacent to existing hangar buildings located on the property of an airport facility. The North
Andover Zoning Board of Appeals granted a Special Permit on May 28, 2004 to allow the
use.
2. The use as developed will not adversely affect the neighborhood, as the hangars will not be
visible from adjacent streets or residents.
3, There will be no nuisance or serious hazard to vehicles or pedestrians. The hangars will not
generate any new vehicular or pedestrian traffic and be restricted to the storage of planes
only.
4. The project will result in no change in existing iinpeirviotis surface area on site. Thus, there
will be no increase in the change or rate of volume of runoff from the site.
5. The applicant has met the requirements of the Town for Site Plan Review as stated in Section
8.3 of the Zoning Bylaw,
Finally the Planning Board finds that this project generally complies with the Town of North
Andover Zoning Bylaw requirements as listed in Section 8.35 but requires conditions in order to
be ftilly in compliance. The Planning Board hereby grants an approval to the applicant provided
the following conditions are inet:
SPECIAL CONDITIONS:
1) Prior to the endorsement of the plans by the Planning Board,the applicant must comply
with the following conditions:
a. A bond in the amount of two-thousand ($2;000.00) dollars in the form of a check
must be posted for the purpose of insuring that a final as-built plan showing the
location of all on-site utilities, structures, Curb cuts, parking spaces, topography, and
drainage facilities is submitted. 'File bond is also in place to insure that the site is
constructed in accordance with the approved plan. The Iiirm of security must be
acceptable to the Planning Board.
Page 1 of 4
Y
Site Plan Review-Special Permit Map 76,Lot 3
492 Sutton Street—Construction of Two Hangers
to t 2) Pr
ior r he start of construction:
a. A construction schedule shall be submitted to the Planning Staff for the purpose of
tracking the construction and informing the public of anticipated activities on the site.
b. During construction, the site must be kept clean and swept regularly.
3) Prior to Building Permit Issuance:
a. The Planning Board must endorse the final site plan mylars and three (3) copies of
the signed plans must be delivered to the Planning Department.
b. One certified copy of the recorded decision must be submitted to the Planning
Department.
c. All permits necessary from the FAA must be, obtained and copies of the approvals
must be submitted to the Planning Department.
4) Prior to issuance of the Certificate of Occupancy:
a. The applicant must submit a letter from the archihzt and engineer of the project stating
that the building, signs, landscaping, lighting and site layout substantially comply with
the plans referenced at the end of this decision as endorsed by the Planning Board.
b. The aircraft hangars must comply with applicable state fine and building codes.
5) Prior to the final release of security:
a. The Planning Staff shall review the site. Any screening as may be reasonably
required by the Planning Staff will be added at the applicant's expense.
b. A final as-built plan showing final topography, the location of all on- site utilities,
structures, curb cuts, parking spaces and drainage facilities must be submitted to and
reviewed by the Planning Staff and the Division of Public Works.
6) Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan
and reviewed and approved by the Planning Staff. Any approved piles must remain covered
at all times to minimize any dust problems that may occur with adjacent properties. Any
stockpiles to remain for longer than one week must be fenced off and covered.
7) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
8) Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the
respective utility companies,
9) No open burning shall be done except as is permitted during burning season under the Fire
Department regulations.
10) No underground fuel storage shall be installed except as may be allowed by Town
Regulations.
Page 2 of 4
Site Plan Review-Special Permit Map 76,Lot 3
492 Sutton Street—Construction of Two Hangers
i
3
11) The provisions of this conditional approval shall apply to and be binding upon the applicant,
its employees and all successors and,assigns in interest or control.
12) Any action by a TmNm Board, Commission, or Department, which requires changes in the
plan or design of the building, as presented to the Planning Board, may be subject to
modification by the Planning Board,
13) Any revisions shall be submitted to the To,,Am Planner for review. If these revisions are
deemed substantial, the applicant must submit revised plans to the Planning Board for
approval.
14) The Site Plan Special Permit is contingent upon the approval of the Conservation
Commission. The applicant shall submit copies all decisions rendered to the Planning
Department by the Conservation Commission related to this project.
1 S) This Special Permit approval shall be deemed to have lapsed September 20, 2007 (two years
from the-date permit granted) exclusive of the time required to pursue or await determination
of any appeals, unless substantial use or construction has commenced within said two-year
period. Substantial use or construction will be determined by a majority vote of the Planning
Board,
16) The hangars shall be used for the storage of airplanes and for no other purpose. There will be
no storage of items, which shall be in violation of any order or requirement imposed by the
Board of Health, Fire Department, and Police Department or other appropriate governmental
body or do any act or cause to do any act, which creates a nuisance or presents a danger to the
safety and health of any person.
17) No repairs, maintenance or work of any type shall be done or caused to be done in or about
the structures.
18) The hangars shall not be used for residential purposes or for any other unlawful purpose.
Items which are volatile, flammable or explosive, or which are hazardous, which burn with
extreme rapidity, or which when burning or subjected to heat produces toxic fumes or gases
in quantities and under conditions dangerous to safety or health of any person, may not be
stored, used or kept in or about the structures. These items include, but are not limited to the
following:
a. Combustible Dust — Fine particles or matter stable to spontaneous ignition or
explosion or constituting a dust hazard such as lint, shavings, sawdust, flour,
starch,sulphur,metal powders and powdered plastics.
b. Explosive Gases — Acetylene, ether, ethyl chloride, ethylene, petroleum gases,
methyl chloride gas,oxygen,
c. Flammable and Combustible Solids -w- Pyroxylin products, nitrocellulose, asphalt,
coal tar, pitch, waste paper and rags, straw,hemp, kapok,oil,grease and fats.
d. Flammable Liquids — Ether, carbon, bisulfide, acetone, alcohol, kerosene,
turpentine,and flammable paint and varnish.
e. Poisonous, Corrosive or Fume Hazard Substance — hydrochloric, nitric,
sulphuric, hydrofluoric, and other corrosive acids; corrosive, toxic, or noxious
cynanides, ammonia, chlorine, sulphur dioxide, and similar substances providing
like hazards.
Page 3 of 4
Site Plan Review-Special Permit Map 76,Lot 3
492 Sulizn'Strctt—Construction of Two Hangers RECEIVED
£ Live animals, contraband, hazardous waste or any other item prohrbQ� 1� � #�
ordinance. ZOOS SEP 23 PH 12: 25
19) The following information shall be deemed part of the decision;
rcwu OF
NORTH ANDCYE,i
Plan Titled: Site Plan MASSACHUS�TT' :
W.T.F., LLC Hangars
154 & 156 North Ramp Road
Lawrence Municipal Airport
North Andover, Mass.
Prepared For: William S. MacLeod
Prepared By; Andover Consultants, Inc.
1 East River Place
Methuen, MA 01844
Scale: I"=40'
Date: August 3,2005
Elevations: MacLeod Hangers
Lawrence Municipal Airport
North Andover Mass
Scale 1"= 10'
Dated: August 3,2003
cc: Applicant
Engineer
File
Page 4 of 4