HomeMy WebLinkAbout2009-06-16 Recorded Decision SPR I
' d
ABOVE FOR,REGISTRY OF DEEDS USE OIVL F
COVER SHEET
THIS IS THE FIRST PAGE OF THIS DOCUMENT
DO NOT REATOVLF
JJGRAN, OR, GRANTEE -
O`� r
ADDRESSD OF PROPERTY- CITY/TOWN
TYPE OF DOCUMENT
]CLC ASSIGNMENT
TYPE
DEED 6D
MORTGAGE NOTICE
TYPE
DISCHARGE SUBORDINATION
AFFIDAVIT CERT
TYPE
'DEC OF HOMESTEAD UCC
TYPE
DEC OF TRUST
OTHER y�
DESCRIBE
-- - �, ssz North Registry 6fD6eds.
Robert F. Kelley, Register
. 354 Merrimack St, Suite 304
Lawrence, NIA, 01843
(978) 683-2745
Www.lawrencedeeds.com
NORTH
OL
t fi7t1 rZFC'F'IVE0
CF•F)CE
.2009 UUN 17 PH 4: 05
��SSACHUS���y
I'OWH O
PLANNING DEPARTMENT MASS ACHUSEl-TS
Community Development Division
1600 Osgood Street
North Andover, Massachusetts, 01845
SITE PLAN REVIEW—DECISION
Date: June 16, 2009
this Is to osrtlfti, <,: Twenty(20)days
Date of Public Hearing: June 16, 2009 have elapsed fro Gate of decislon,filed
without filing of all
Date
Petition of: M.E.M.L.V., LLC Joyce-A.BrOshaw
P.O. Box 623 Town Clerk
492 Sutton St.
North Andover, MA 01845
Premises Affected: 492 Sutton Street. (airport) North Andover, MA 01845, Assessor's Map
76, Lot 3
Referring to the above petition for Review of a Site Plan, according to the requirements of the
North Andover Zoning Bylaw, Sections 8.3, 10.3,and 10.31 and MGL C.40A, Sec. 9
So as to allow the construction of a 6,375 sq. ft., 75' X 85' airplane hangar in a paved section of
the airport in the Industrial -2 District.
After a public hearing given on the above date, the Board recommended APPROVAL of the Site
Plan Review Special Permit based on the following conditions.
On behalf of the North Andover
Planning Board
John Simons, Chairman
Timothy Seibert
Michael Walsh
Courtney LaVolpicele
ATTEST:,
A 1'rurp, Copy,.
Town C[erk
Site Plan Review - Special Permit
492 Sutton Street-M.E.M.L.V.
The Planning Board herein approves the Special Permit/Site Plan Review for the construction of
a metal building of 6,375 square feet within the Industrial-2 Zoning District, This Special
Permit was requested by M.E.M.L.V., Inc, P.O. Box 623, 492 Sutton Street North Andover, MA
01845. This application was Bled with the Planning Board on May 14, 2009. The applicant
submitted a complete application which was noticed and reviewed in accordance with Sections
8.3, 10.3, and 10.31 of the Town of North Andover Zoning Bylaw and MGL c.40A, see. 9.
The Planning Board makes the following findings as required by the North Andover Zoning
Bylaws Section 8.3 and 10.3;
FINDINGS OF FACT:
1. The specific site is an appropriate location for the structure, as it will be constructed adjacent
to existing hangar buildings located on the property of an airport facility. The North Andover
Zoning Board of Appeals granted a Variance on April 14, 2009 from Section 7, Paragraphs
7.2 (Street Frontage), 7.3 (Yard Setback), &Table 2, and Section 8, Paragraph 8.1 (Off Strect
Parking) of the Zoning Bylaw for dimensional relief and for a Special Permit from Section 9,
Paragraph 9.1 (Non-Conforming Uses) of the Zoning Bylaw in order to extend a non-
conforming use(airport) in the I-2 zoning District.
2. The use as developed will not adversely affect the neighborhood, as the hangar will not be
visible from adjacent streets or residents.
3. The hangar will not generate any new vehicular or pedestrian traffic.
4. The existing conditions of the site are currently paved, as such no increase in runoff rates or
volume will occur. The project is currently under review by the Conservation Commission
for stormwater management.
5. The applicant has met the requirements of the Town for Site Plan Review as stated in Section
8.3 of the Zoning Bylaw.
Finally the Planning Board finds that this project generally complies with the Town of North
Andover Zoning Bylaw requirements as listed in Section 8.35 but requires conditions in order to
be fully in compliance. The Planning Board hereby grants an approval to the applicant provided
the following conditions are met:
SPECIAL CONDITIONS:
1. Prior to the endorsement of the plans by the Planning Board, the applicant must
comply with the following conditions:
a) A bond in the amount of two thousand ($2,000) dollars in the form of a check
must be posted for the purpose of insuring that a final as-built plan showing the
location of all on-site utilities, structures, curb cuts, parking spaces, topography,
and drainage facilities is submitted. The bond is also in place to insure that the
site is constructed in accordance with the approved plan. The form of security
must be acceptable to the Planning Board.
2
b) The applicant must receive approval from the North Andover Conservation
Commission. The applicant must provide to the Planning Department copy of all
approvals.
c) The Town Engineer must review and approve the drainage plan.
2. Prior to the start of construction:
a) During construction,the site must be kept clean and swept regularly.
b) A construction schedule shall be submitted to the Planning Staff for the purpose
of tracking the construction and informing the public of anticipated activities on
the site.
3. Prior to Building Permit Issuance:
a) The Planning Board must endorse the final site plan mylars and three (3) copies of
the signed plans must be delivered to the Planning Department.
b) One certified copy of the recorded decision must be submitted to the Planning
Department.
c) All permits necessary from the FAA must be obtained and copies of the approvals
must be submitted to the Planning Department.
4. Prior to issuance of the Certificate of Occupancy:
a) The applicant must submit a letter from the architect and engineer of the project
stating that the building, signs, landscaping, lighting and site layout substantially
comply with the plans referenced at the end of this decision as endorsed by the
Planning Board.
b) The aircraft hangar must comply with applicable state fire and building codes.
5. Prior to the final release of security:
a) The Planning Staff shall review the site. Any screening as may be reasonably
required by the Planning Staff will be added at the applicant's expense.
b) A final as-built plan showing final topography, the location of all on- site
utilities, structures, curb cuts, parking spaces and drainage facilities must be
submitted to and reviewed by the Planning Staff and the Division of Public
Works.
6, Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a
plan and reviewed and approved by the Planning Staff. Any approved piles must remain
covered at all times to minimize any dust problems that may occur with adjacent
properties. Any stockpiles to remain for longer than one week mist be fenced off and
covered.
3
I
1
7. The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday
through Friday and between 8:00 a.m, and 5:00 p.m. on Saturday.
8. The contractor shall contact Dig Safe at least 72 hours prior to commencing any
excavation.
9. Electric utilities shall be installed underground as specified by the respective utility
companies.
10. No open burning shall be done except as is permitted during burning season under the
Fire Department regulations.
11. No underground fuel storage shall be installed except as may be allowed by Town
Regulations.
12. The provisions of this conditional approval shall apply to and be binding upon the
applicant, its employees and all successors and assigns in interest or control.
13. Any action by a Town Board, Commission, or Department, which requires changes in the
plan or design of the building, as presented to the Planning Board, may be subject to
modification by the Planning Board.
14. The Site Plan Review Special Permit is contingent upon the approval of the Conservation
Commission. The applicant shall submit copies of all decisions rendered to the Planning
Office by the Conservation Commission related to the project.
15. Any revisions shall be submitted to the Town Planner for review. if these revisions are
deemed substantial, the applicant must submit revised plans to the Planning Board for
approval.
16. This Special Permit approval shall be deemed to have lapsed June 16, 2011 (two years
from the date permit granted) unless substantial use or construction has commenced.
Substantial use or construction will be determined by a majority vote of the Planning
Board.
17. The hanger shall be used for the storage of airplanes and for no other purpose. There will
be no storage of items, which shall be in violation of any order or requirement imposed
by the Board of Health, Fire Department and Police Department or other appropriate
governmental body. No one shall do any act or cause to do any act, which would create a
nuisance or presents a danger to the safety and health of any person.
18. No repairs, maintenance or work of any type shall be done or caused to be done in or
about the structures.
19. The hangers shall not be used for residential purposes or for any other unlawful purpose.
Items which are volatile, flammable or explosive, or which are hazardous, which burn
with extreme rapidity, or which when burning or subjected to heat produces toxic fumes
or gases in quantities and under conditions dangerous to safety or health of any person,
may not be stored, used or kept in or about the structures. These items include, but are
not limited to the following:
4
1
a) Combustible Dust — Fine particles or matter stable to spontaneous ignition or
explosion or constituting a dust hazard such as lint, shavings, sawdust, flour,
starch, sulfur, metal powders and powdered plastics.
b) Explosive Gases — Acetylene, ether, ethyl chloride, ethylene, petroleum gases,
methyl chloride gas, and oxygen.
c) Flammable and Combustible Solids—Pyroxylin products, nitrocellulose, asphalt,
coal tar, pitch, waster paper and rags, straw, Kemp,oil,grease and fats.
d) Flammable Liquids — Ether, carbon, bisulfate, acetone, alcohol, kerosene,
turpentine and flammable paint and varnish.
e) Poisonous, Corrosive or Fume Hazard Substances -hydrochloric, nitric, sulfuric,
hydrofluoric, and other corrosive acids; corrosive, toxic, or noxious cyanides,
ammonia, chlorine, sulfin•dioxide, and similar substances providing like hazards.
f) Live animals,contraband, hazardous waste or any other item prohibited by law or
ordinance.
20. The following information shall be deemed part of the decision:
Plan Titled: Site Plan
North Ramp Road
Lawrence Municipal Airport
North Andover, Mass.
Prepared For: M.E.M.L.V., LLC
P,O. Box 623
492 Sutton St.
North Andover, MA 01845
Prepared By: Andover Consultants, Inc.
I East River Place
Methuen, MA 01844
Scale: 1"=20'
Date: May 11,2009, revised to June 16, 2009
Assessors: Map 76, Lot 3
cc: Applicant
Engineer
File