Loading...
HomeMy WebLinkAbout2004-03-04 Drainage Report SPR andover consultants 1 Fast River Place Inc. Methuen, Massachusetts 01844 Tel, (978) 687-3828 Fax(978) 686-5100 DRAINAGE REPORT for MacLeod Hanger This project will result in 8,030 SF of new impervious area consisting of 6,001 SF of rooftop and 2,029 SF of pavement. See Site Plan prepared by Andover Consultants Inc. dated January 22, 2004. There is a recently completed pavement removal project for Runway"Echo"which removed approximately 26,800 SF of pavement. This information is shown on plans entitled Construction of Airport Improvements prepared by Dufrense-Henry dated April 2003. Portions of those plans are attached. Comparing both projects, there is a net reduction of 70% impervious area. Given that :both projects are in the same watershed, the combined peak rate of stormwater runoff from both project areas will result in a reduction of peak rates under post-construction conditions. OF ri Jo PH P. Bl7RKE is CIVIL �a,3�080 Dl 2 Doi ;.�..0rs7� ;Fy�SIOIdAL��' Civil Engineers • Land Surveyors • Land Planners