HomeMy WebLinkAbout2003 TRC Meeting Info SPR WITHDRAWN Town of North Andover
Office of the Planning Department
Community Development and Services Division
27 Charles Streets
North Andover, Massachusetts 01845
Planning Director: iwoods@townofnorthandover.com P (978) 688-9535
J. Justin Woods hi!p://w-ww.townofnorthandover.com F (978) 688-9542
Technical Review Committee
Purpose:
The Technical Review Committee(TRC)is an established forum whereby applicants can voluntarily submit
development plans of proposed projects for an informal discussion and comprehensive review with various Town
departments. This forum was established to enable discussion of the impacts of development on the Town and to
help the applicant discover and remedy potential roadblocks.
Discussions amongst staff members may provide input to Town boards on potential problems and written staff
recommendations to alleviate those potential problems before they occur.
Scope of Services:
The Technical Review Committee shall meet at IO:OOAM on the second and fourth Thursdays in the Town Hall
Conference room to discuss proposed projects. Each member of the TRC shall provide the applicant and the group
with input regarding their concerns about the regulatory requirements their department reviews.A written set of
recommendations from the TRC shall be provided to assist the applicant in preparing plans for submittal to Town
Boards within a week of the TRC meeting. An applicant must submit 12 copies of a conceptual plan eight days
prior to a TRC meeting to get on the agenda.
Members:
Standing members:
• Office of Town Manager
• Planning Department**
• Conservation Department
• Building/Zoning Department
• Public Works Department
• Fire Department
• Police Department
• Community&Development& Services Division
** The Planning Director shall Chair the TRC and shall perform the following functions;
• Act as the contact person for the applicant.
• Prepare the agenda,distribute supporting documentation, and assign project leads.
• Issue notices,draft correspondence,minutes of meeting and TRC report.
As required:
• Health Department
• School Facility Manager—in matters regarding large residential subdivision
• Town Clerk--licensing matters
• Youth Services
• Trails Committee
• Fields Committee
• Recreation
• Elder Services
• Open Space Committee
• Community Preservation Act Committee
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 14EAL'rI4 688-9540 PLANNING 688-9535
e r
a r c h i t e c t s and p 1 a n n e r s
Limited
03 June 2003
NORT11/lNOC)t.I-=f;
PLANNINq 6F;Pr;} I t rl :1111
Justin Woods, Planning Director
North Andover Planning Board
27 Charles Street
North Andover, MA
Reference: Foster Farm Elementary School
North Andover, MA
Subject: Technical Review Committee Submission
Dear Justin:
On behalf of the School Building Committee we request the Foster Farm Elementary School
project be placed on the Technical Review Committee (TRC) meeting scheduled for 12 June
2003. I, have included below a description of the project for TRC members.
PROJECT DESCRIPTION
The Town of North Andover has purchased 77'acres between Foster and Boxford Streets
which includes "conservation land" and the site for an elementary school. A feasibility study
for suitably siting a new 800 student elementary school was completed by Moriece & Gary
Landscape Architects in 2002.
The architectural firm of DiNisco Design.Partnership along with their team of consultant
.engineers has been retained to design the new Foster Farm Elementary School, The school
design for 800 students from Kindergarten through the 5th.grades and 100 staff is currently in
the schematic design phase. The program includes space for 37 general classrooms as well
as special education, art, music, and science classrooms, a cafeteria & kitchen, a
multipurpose room with stage platform, and a gymnasium. Current plans propose a two story
plus basement, steel frame structure with a footprint of 72,000 square feet and 120,000 gross
square feet of floor area on a 6 acre portion of the 77 acre Foster Farm site. There will be
approximately 120 parking spaces plus additional overflow parallel 'parking along designated
portions of the site drive.
Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 1' 7 . 4 2 6 , 2 8'5 8 f a x 4 2 6 , 1 4 5 7
ww %v . dinisco c o m
North Andover Planning Board, 03 June 2003 Page 2
We appreciate the opportunity to gather input from various Town departments at the TRC
meeting. Issues we plan on addressing include the following:
1. Traffic— Street improvements to Boxford Street will be investigated at the property
frontage and immediately east and west of the frontage for getting vehicles safely on
and off the property.
2. Conservation Commission /NOI /Stormwater Drainage Plan An Order of Resource
Area Delineation has previously been issued by the Conservation Commission. We
will be submitting a Notice of Intent to the Conservation Commission which will include
Sediment and Erosion Control, Stormwater Drainage Plan, Stormwater Management
Design and Stormwater Runoff Calculations. .
3. Sewer line Extension — It is proposed that the existing sewer line which ends at
Boxford Street and Huckleberry Lane will be extended approximately 3,800 feet to the
school site. The sewer line extension project is being treated as a separate project and
is not being submitted to the Conservation Commission and Planning Board for
approvals at this time. The School Building Committee's objective is to come to
agreement with the town on a conceptual design for the sewer line extension.
4. Proposed Waterline Connection —At the request of the DPW, we are investigating the
feasibility of connecting the existing waterline on poster Street to the existing waterline
on Boxford Street.
We are submitting with this letter plans and additional documentation in advance of the
meeting as specified by TRC procedures. Enclosed are 14 sets (12 half size and 2 full size
drawing sets). One additional set is being sent directly to the consulting engineer, Please refer
to Attachment 1 for a table of contents. We look forward to seeing you next week.
Sincerely,
Jon Oxman
DiNISCO D IGN
/jo
cc: Timothy McIntosh, Vanasse Hangen Brustlin, Inc.
Louis Min icucci.(Attachment 1 only)
Nancy Kurtz
Paul Szymanski (Attachment 1 only)
Pat Saitta
Kenneth DiNisco (Attachment 1 only)
Richard Rice (Attachment 1 only)
Enclosures: Attachments 1 —6 (See Table of Contents, Attachment 1)
02458.0 CorPlanDept 28a
architects and planners
Limited
ATTACHMENT 1
FOSTER FARM ELEMENTARY SCHOOL
TECHNICAL REVIEW COMMITTEE SUBMISSION
TABLE OF CONTENTS
03 June 2003
Table of Contents (03 June 2003) ...................................................... Attachment 1
Proposed. Scope of Work(19 May 2003) ....................... Attachment 2
Existing Site (19 May 2003) .................................................... ................... Attachment 3
Rendered Site Plan (19 May 2003) .....................................................:......... Attachment 4
Traffic Impact Study (02 June 2003),.. ........... Attachment 5
Plan Set,...................... ....... Attachment 6
SITE
1.0.1 Site Survey- Overview (21 April 2003)
1.0.2 Site Survey— South (21 April 2003)
1.0.3 Site Survey— North (21 April 2003)
1.0.4 Site Survey— Boxford Road Roadway Detail (21 April 2003)
1,1.1 Site Preparation Plan Overview (03 June 2003)
1.1.2 Site Preparation Plan South (03 June 2003)
1.1.3 Site Preparation Plan North (03 June 2003)
1.1.4 'Site Plan Overview (03 June 2003)
1.1.5 Layout& Materials Plan South(03 June 2003)
1.1.6 Layout & Materials Plan North (03 June 2003)
1.1.7 Grading Plan South (03 June 2003)
1.1.8 Grading Plan North (03 June 2003)
1,1,9 Planting & Irrigation Plan South (03 June 2003)
1.1.10 Planting & Irrigation Plan North (03 June 2003)
1.2.0 Site Utilities, Legend, Details and General Notes (03 June 2003)
1.2.1 Site Utilities, Plan Part 1 Plan (03 June 2003)
1.2,2 Site Utilities, Plan Part 2 Plan (03 June 2003)
1.2.3 Not Used
1.2.4 Sanitary Sewer Extension Details (03 June 2003)
1.2.5 Sanitary Sewer Extension Part 1 Plan and Profile (03 June 2003)
1.2.6 Sanitary Sewer Extension Part 2 Plan and Profile (03 June 2003)
1.2.7, Sanitary Sewer Extension Part 3 Plan and Profile (03 June 2003),
1.2.8 Sanitary Sewer Extension Part 4 Plan and Profile (03 June 2003)
1.3.1 Schematic Stormwater Drainage Plan — South (03 June 2003)
1.3.2 Schematic Stormwater Drainage Plan — North (03 June 2003)
Kenneth DiNisco Richard N. Rice Gary E.Ainslie Christopher Huston Donna DiNisco
8 7 S u m m e r S t r e e t B o s t o n M A 0 2 1 1 0 6 I 7 . 4 2 6 . 2 8 5 8 t a x 4 2 6 . 1 4 5 7
wwiv . din isco . com
Table of Contents — North Andover Technical Review Committee.Submission Page 2
ARCHITECTURAL
3.3,1 Key Plans— Basement and First Floor (03 June 2003)
3.3.2 Key Plans - Second Floor and Roof (03 June 2003)
3.6.1 Elevations (03 June 2003)
ELECTRICAL
10.0.1 Site Lighting Plan.(03 June 2003)
02458.0 CorPlanDept 29b-TOC