HomeMy WebLinkAboutConstruction Notes - Septic Full Repair - Consultant Review - 250 ABBOTT STREET 2/14/2022 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 250 Abbott Street MAP: 038.0 LOT: 0159 INSTALLER: James Heider – 978-606-1435 DESIGNER: John M. Morin – 978-777-8586 PLAN DATE: 07.30.2021 BOH APPROVAL DATE ON PLAN: 08.30.2021 INSPECTIONS - Plan # 67868 TANK INSPECTION: 08.08.2022 S. Casey DATE OF BED BOTTOM INSPECTION: 08.09.2022 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 09/06/22 I. DaRowe DATE OF FINAL GRADE INSPECTION: 12/21/2022 SITE CONDITIONS Contractor reports any changes to design plan N/A Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: 9-6-22 By-pass vent was installed from D-box to septic tank to replace high vent as proposed on the design plan. Change was approved by the designer. I. DaRowe SEPTIC TANK - Existing N/A Building sewer in continuous grade, on compacted firm base N/A Cleanouts per plan N/A Bottom of tank hole has 6” stone base Tank size and loading per plan N/A Monolithic tank construction / 2-piece (circle one) N/A If monolithic, water tightness of tank has been achieved by visual testing N/A If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Effluent filter installed If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum ___ inch diameter Pipe penetrations appear watertight using hydraulic cement (circle one) Comments: 9-6-22 - (3) poly covers to finish grade. I. DaRowe PUMP CHAMBER (Delete if not present) Bottom of tank hole has 6" stone base Weep hole plugged 1000 gallon Pump Chamber installed H-10 loading Monolithic tank construction N/A Inlet tee installed, centered under access port Pump(s) installed on stable base Alarm float working Pump On/Off floats working Drain hole in pressure line 24” cover at final grade installed over pump access port Water tightness of tank has been achieved by Visual Hydraulic cement boots around inlet & outlet Comments: 9-6-22 - No inlet tee installed per plan per the installer. I. DaRowe CONTROL PANEL (Delete if not present) Alarm & Pump are on separate circuits Visual & audible alarm works as intended Location of control panel: outside of southern side of the house Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: 9-6-22 - 2” x 4” transition per plan. I. DaRowe SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled N/A40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header (and vented if impervious material above) N/ARetaining wall material, location and height if specified on plan Comments: 08.09.2022 S.Casey – Size and depth good, clean up old test pits and large rocks. Sand to be checked 08.10.2022 08.10.2022 – sand good, receipt attached. SOIL ABSORPTION SYSTEM (Other) Brand and Model: Presby Enviro-Septic Number of units per row and number of rows per design plan: 3.5 pipes x 9 lines Elevations of laterals and chambers installed as on approved plan FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: 09.19.2022 – Rough grade building patio and walkway so will finish final grade upon completion of those S.C. DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 102.91 HR = 6.16 HI = 109.07 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT ----- Septic Tank IN ----- Septic Tank OUT 9.10 99.62 99.7+/- Pump Chamber IN 9.50 99.22 99.54 Pump Chamber OUT 9.85 98.87 99.29 (4”) 2” x 4” coupling 7.39 101.33 101.41 Distribution Box IN 7.36 101.36 101.33 Distribution Box OUT 7.53 101.19 101.16 Presby Line 1 7.66 101.06 100.99 Line 2 7.66 101.06 100.99 Line 3 7.67 101.05 100.99 Line 4 7.67 101.05 100.99 Line 5 7.67 101.05 100.99 Line 6 7.66 101.06 100.99 Line 7 7.66 101.06 100.99 Line 8 7.66 101.06 100.99 Line 9 7.66 101.06 100.99 Bottom of sand 9.72 99.35 99.9 End manifold vent pipe 6.19 102.53 invert By-pass vent pipe invert 6.92 101.80 Bottom of Presby pipe 100.46 - 100.47 100.40