HomeMy WebLinkAbout2008-11-05 Conservation Commission Minutes b4 #010
Conservation Commission Meeting Minutes
November 5, 2008
Members Present: John Mabon, Chairman, Sean F McDonough Vice Chairman, Joseph W
Lynch, Jr , Deborah A Feltovic, Louis A Napoli
Members Absent: Scott L Masse, Albert P Manzi, Jr
Staff Members Present: Jennifer A Hughes, Conservation Administrator, Donna M Wedge,
Conservation Secretary
Mr. McDonough arrived at the meeting at: 7:25 P. M.
Meeting came to Order at: 7:15 P. M. Quorum Present.
Pledge of Allegiance
General Business
242-784, PCOC Request,Roadways at Abbott Village Estates (North Andover Land
Corp.)(Hayes Engineering, Inc.)
No one was present for the applicant The applicant is requesting a continuance to the December
3, 2008 meeting A motion to continue to the December 3, 2008 meeting was made by Ms
Feltovic, seconded by Mr Napoli Unanimous
242-1345, Modification & COC Request 1915 Great Pond Road (Lot 1)(Pelich)(New
England Engineering Services, Inc.) Request to cont. to 12/3/08)
No one was present for the applicant The applicant is requesting a continuance to the December
3, 2008 meeting A motion to continue to the December 3, 2008 was made by Ms Feltovic,
seconded by Mr Napoli Unanimous
242-1382, Modification Request, 1820-1830 Turnpike Street (GFM General
Contracting)(Eastern Land Survey Associates, Inc.)(Request to cont. to 11/19/08)
No one was present for the applicant The applicant is requesting a continuance to the November
19, 2008 meeting A motion to continue to the November 19, 2008 meeting was made by Ms
Feltovic, seconded by Mr Napoli Unanimous
242-265, PCOC Request, 46 Wintergreen Drive (Lot 20)(Albert)(Christiansen & Sergi,
Inc.)
No one was present for the applicant Ms Hughes states the filing was for the roadway, utilities
and drainage for the subdivision There are no wetlands on this lot or within 100-feet A motion
to issue the PCOC was made by Ms Feltovic, seconded by Mr Napoli Unanimous
I
242-1250, COC Request,Adams Avenue(DPW)(Westin & Sampson Engineers, Inc.)
Ms Hughes presented the COC request for the Town of North Andover DPW Ms Hughes
inspected the drainage improvements on Adams Avenue with Gene Willis and confirms they are
constructed as proposed The blueberry bushes on the bank are disturbed by foot traffic Mr
Napoli asks if Autran Avenue is part of this filing Ms Hughes responds it will be a separate
filing A motion to issue the COC was made by Ms Feltovic, seconded by Mr Napoli
Unanimous
242-1341, COC Request, 2 Blueberry Hill Lane ffurlong)(LeBlanc Survey Associates,Inc.)
The applicant Stacey Furlong and William Attrachi were present Ms Hughes states the
restoration area is undisturbed and the plantings have been monitored for 2 years Several of the
blueberry bushes were not thriving and the applicant planted two red maples at Ms Hughes'
request The wetland markers were also moved from temporary stakes onto mature trees and one
post A motion to issue the COC was made by Mr Lynch, seconded by Ms Feltovic
Unanimous
242-1367, COC Request, 31 Court Street (Castricone)(Giles Surveying)
No one was present for the applicant Ms Hughes states project in compliance but wetland
markers are on wire stakes (not permanent) The NACC discusses the history of the project Mr
Lynch recommends markers are placed on two pressure treated lumber posts at either end of the
restored buffer zone Markers should be field located by the Conservation Administrator A
motion to issue the COC and release the bond was made by Mr Lynch, seconded by Ms
Feltovic COC should not issue until markers are in place Unanimous
242-1396,COC Request,350 Holt Road (Crusader Paper)(New England Engineering
Services, Inc.)
No one was present for the applicant Ms Hughes states only a small corner of the project was in
jurisdiction(R.iverfront) Ms Hughes noted on a site inspection that grass was only recently
planted and was not yet established Mr Lynch stated lack of stabilization in detention area
could result in silty water getting to the resource area Ms Feltovic agreed Mr Lynch stated a
partial bond release was possible but not a COC Mr McDonough stated the growing season is
over and stabilization not likely this year A motion to continue to November 19, 2008 meeting
was made by Ms Feltovic, seconded by Mr Lynch Unanimous
242-1435, COC Request, 69 Oakes Drive(Weiting)(New England Engineering Services,
Inc.
No one was present for the applicant Ms Hughes states a grass Swale was constructed as
proposed along the rear property and is sloped to carry water away from abutters Mr Lynch
confirmed that site is stabilized Ms Hughes noted slight discrepancies in the septic system
location. All parts of the system are outside of 50-foot No-Build zone There is discussion about
inspections done by Board of Health Mr Mabon states the Health Department would likely be
stricter than NACC in system inspections A motion to issue the COC and release the bond was
made by Ms Feltovic, seconded by Mr Napoli Unanimous Mr McDonough requests Ms
Hughes discuss the types of inspections conducted by BOH to determine if system location is
confirmed with measurements
2
No Recess
Public Hearings: 8:00 P. M.
Abbreviated Notice of Resource Area Delineation & Modification Request
242-1444, 575 Osgood Street (Edgewood Retirement Community,Inc.)(Christiansen &
Sergi, Inc.)
Anthony Capachietti of Christiansen& Sergi, Inc , David M Mermelstein of Trident Project
Advantage Group, and Kevin Tremblay Director of Development and Construction were present
for the applicant and Chris Ward of the Trustees of Reservation was present as an abutter Ms
Feltovic read the legal notice Ms Hughes describes the resource area and confirms the wetland
line is correct as depicted in the ANRAD Mr Capachietti states the open field is hayed twice per
year The modification is to fence the horse paddock and remove invasive plants along the
stonewall at Osgood Street A new stone wall would be added at the entrance to Edgewood Drive
within the 25-foot No-Disturbance zone A post and rail fencing would be installed behind the
stone walls also within the 25-foot No-Disturbance zone A motion to issue the ORAD was
made by Mr McDonough, seconded by Ms Feltovic Unanimous
242-1398, Modification Request, 575 Osgood Street (Edgewood Retirement Community,
Inc.)(Christiansen & Sergi, Inc.
Anthony Capachietti of Christiansen & Sergi, Inc , David M Mermelstein of Trident Project
Advantage Group, and Kevin Tremblay Director of Development and Construction were present
Mr Capachietti presents additional modifications including a parking lot change and a utility
pole removal plan Mr Capachietti states the parking lot modification would result in 2,000 s f
less impervious area The pole removal is necessary as utilities have been installed underground
Mr Lynch states requests the pond outlet be protected during removal of phragmites and that
erosion control be shown for the remainder of the work Mr Lynch questions if the paddock will
continue to be used Mr Lynch questions the applicant about stormwater changes related to the
parking lot modification Mr Lynch requests documentation of TSS removal and need for a
sediment forebay/forebay extension Mr Capachietti states the catch basin will be replaced with
a Stormceptor Mr Mabon requests a more detailed description of the landscaping work and a
construction sequence for the phragmite removal Mr McDonough discusses the location of the
stone wall and fencing Mr Lynch confirms need for waiver request Ms Feltovic questions the
effects of the wall on wildlife movement None anticipated Mr Mabon summarizes additional
information needed including the number of utility poles to be removed and submission of a
waiver request for fencing and stone walls A motion to continue to November 19, 2008 meeting
was made by Ms Feltovic, seconded by Mr Napoli Unanimous
Notice of Intent (s)
242-1443,,Berry Street (Lot 5)(Brooks)(Merrimack Engineering Services,Inc.)(cont. from
10/22/08)
The applicant Nathan Brooks and William Dufresne of Merrimack Engineering Services, Inc
were present Ms Feltovic read the legal notice Mr Dufresne presents the project Mr
Dufresne states the applicant is working on a plan to access sewer line of from Route 114 This
3
j r
would remove the need for waivers as an on-site system would not be needed Mr Napoli asks if
project complies with zoning and discusses location of loam stockpile Mr Lynch asks for a
detail of a pump and treat area/slurry pit for use when the well is installed There is discussion
on moving the well NACC requires installation of a dry set field stonewall as a physical barrier
to deter yard waste dumping Mr Lynch states revised plans are needed There is discussion of
the restoration area and possible change in the wetland line when fill is removed Restoration
area documentation needed A motion to continue to November 19, 2008 meeting for revised
plans was made by Ms Feltovic, seconded by Mr Napoli Unanimous
242-1428, Lot4N-A Turnpike Street(Merrimack Condominiums)(One Hundred Fourteen
Trust)(Patrick C. Garner Company,Inc.)(cont. from 10/8/08)
The applicant Peter Hingorani of One Hundred Fourteen Trust, and Patrick C Garner Company,
Inc were present Abutter John W Haggerty of 1874 Turnpike Street was also present Mr
McDonough is recused as an abutter Mr Garner presents changes to the project Buildings
cannot be moved according to the ZBA Mr Garner indicates plants and fencing will be flipped
The NACC discusses the different design iterations of the project Mr Lynch indicates he does
not remember wetland fill (other than the limited project crossing) being proposed when project
originally filed Mr Napoli also does not remember fill proposal on earlier iterations of plans
Mr Napoli is concerned about NHESP issues Mr Garner states wetland fingers were
discovered during later peer review by Mark West and filling was proposed Mr Lynch
discusses alternatives layouts for the H units Mr Garner discusses profitability and unit
reduction Mr Mabon states ZBA is willing to consider changes if required by the NACC Mr
Garner states applicant would like to avoid return to ZBA process and consider additional
mitigation Ms Feltovic states she is not in favor of the filling of the wetland resource areas Mr
Lynch states documentation of alternatives is needed Mr Mabon requests a copy of the ZBA
financial analysis Mr Garner discusses the use of retaining wall to reduce fill Mr Napoli
suggests reduction of a unit Mr Lynch expresses concern for closeness of project to resource
areas It leaves little room for errors in construction Mr Lynch discusses replication and
mitigation requirements Ms Hughes states this property is pristine and the loss of tree canopies
would effect the resource areas Mr Lynch states they could eliminate some of the buildings on
the site so the area would not be so cramped Natural Heritage is involved because of the 2
certified vernal pools on the site Off-site alternatives for mitigation are discussed Mr Garner
requests a meeting regarding stormwater issues with Mr Lynch and Mr Napoli A motion to
continue to November 19, 2008 meeting was made by Ms Feltovic, seconded by Mr Napoli
Unanimous
Decision
242-1441, 1.54 Main Street
Motion to issue decision as drafted made by Ms Feltovic, seconded by Mr Napoli Unanimous
A motion to adjourn the meeting at: 10: 15 P. M. was made by Ms. Feltovic, seconded by
Mr. Napoli. Unanimous.
4