Daniel Ottenheimer<dano@millriverconsulting.com> Wed, Sep 21, 2022 at 9:43 AM
To: "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, 'Brian Lagrasse (blagrasse@northandoverma.gov)" <baagrasse@northandoverma.gov>
Brain, Steve, Toni—
We took care of this plan review. There were a few small items which need attention but they did not warrant a full review
letter. The email below was sent to the designer.
Amy questions please do let me know.
Dan
Daniel Ottenheimer, PE
President
rIs
VMILL RIVER CONSULTING
Creative Solutions liar Laid Develolnnrnt
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.miliriverconsulting.com
https://mai l.google.com/mail/u/0/?i k=aOc6f4e4cf&view=pt&search=all&permth id=th read-f%3A1744586991152079243&simpl=msg-f%3A174458699115... 1/3
9/21/22,9:51 AM Town of North Andover Mail-FW:24 Farnum Street North Andover plan review
a
From: Daniel Ottenheimer
Sent:Wednesday, September 21, 2022 9:42 AM
To: Bill Dufresne (wrdufresne@comcast.net) <wrdufresne@comcast.net>
Subject: 24 Farnum Street North Andover plan review
Bill,
A few small items seem like they need to be addressed, as follows:
• The pump tank detail indicates a hole is to be cored in the pump tank for the force main to exit.Why not use a pre-
fabricated tank with a hole already cast into it?
• The leach line orifice sizes should be provided
• The plan notes on sheet 1 indicate to re-use the existing tank but that seems to conflict with the site plan which
says the tank is to be abandoned
• The profile and end section of the leach field simply calls for"stone"while elsewhere double-washed stone is
specified. To avoid construction issues it is suggest to use the term "double washed"throughout
• Note 2 indicates stone is to be double washed "as necessary". Title 5 (15.247) indicates double washed stone is
the minimum standard to be used so this wording cannot remain as stated. It seems perhaps what might be
prudent to say is that"double washed stone is to be further rinsed as necessary to remove fines, etc."or however
it is best stated
Let me know if any questions.
Dan
Daniel Ottenheimer, PE
President
fFMtLL RIVER CONSULTING
t..,7X!2tiVC iSCAUti(XiS for Laid Development
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.millriverconsulting.com
https://mai l.goog le.com/mail/u/O/?ik=a0c6f4e4cf&view=pt&search=all&permthid=thread-f%3A1744586991152079243&simpl=msg-f%3A174458699115... 213
9/21/22,9:51 AM Town of North Andover Mail-FW:24 Farnum Street North Andover plan review
r
Toni Wolfenden <tolfenden@northandoverma.gov> Wed, Sep 21, 2022 at 9:50 AM
To: Daniel Ottenheimer<dano@millriverconsulting.com>
Cc: Stephen Casey<scasey@ north an dove rma.gov>, "Brian Lagrasse (blagrasse@north an dove rma.gov)"
<blagrasse@northandoverma.gov>
Thank you.
This is so appreciated!!
-Toni
Toni K. Wolfenden
Health Department Assistant
978-688-9540
[,�cid:irnage002.jpg@O1 CD02A1.85A49B40
[Quoted text hidden]
image001.jpg
4K
hftps://mai l.goog le.com/mail/u/0/?ik=a0c6f4e4cf&view=pt&search=all&permthid=thread-f%3A1744586991152079243&si mpl=msg-f%3A174458699115... 3/3
8/31/22,3:19 PM Town of North Andover Mail-Sided 24 Farnum Street-Septic Co.hired
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
Sided 24 Farnum Street - Septic Co. hired
3 messages
SANDRA SIDERI <wssid@aol.com> Wed, Aug 31, 2022 at 3:16 PM
To: twolfenden@northandoverma.gov
Hello,
Here is the information requested.
Boraczeks Septic& Drain
Hampstead NH
603-329-6005
boraczeksseptic@gmail.com
Let us know if you need anything else.
Thank you!
Warren &Sandy Sided
Toni Wolfenden <twolfenden@northandoverma.gov> Wed, Aug 31, 2022 at 3:18 PM
To: SANDRA SIDERI <wssid@aol.com>
Received, thank you.
When the plan has been approved...please reach out if you have any questions about pulling the permit.
Have a nice afternoon.
Toni
Toni K. Wolfenden
Health Department Assistant
978-688-9540
[�cid:image002.jpg@01 CD02A1.85A49B40
[Quoted text hidden]
image001.jpg
4K
Toni Wolfenden <twolfenden@northandoverma.gov> Wed, Aug 31, 2022 at 3:19 PM
To: SANDRA SIDERI <wssid@aol.com>
Sorry,
Boraczeks Septic& Drain will be pulling the permit.
If you have any questions about the process please call.
Thanks,
https://mai l.google.com/mail/u/0/?ik=a0c6f4e4cf&view=pt&search=all&permth id=thread-f%3Al 742705454306794068&simpl=msg-f°/a3A17427054543... 1/2
8131/22,3:19 PM Town of North Andover Mail-Sideri 24 Farnum Street-Septic Co.hired
Toni
Toni K. Wolfenden
Health Department Assistant
978-688-9540
G�cid:image002.jpg@01 CD02A1.85A49B40
[Quoted text hidden]
image001.jpg
4K
https://mai l.goog le.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=al I&permthid=thread-f°/o3A1742705454306794068&simpl=msg-f%3A17427054543... 2/2