HomeMy WebLinkAboutFoundation Plans - Plans - 161 CAMPBELL ROAD 5/6/2022 EXISTING \I PROPOSED
I
EXISTING POURED
CONCRETE PIERS
EXISTING PROPOSED Q
EXISTING IDWELLING(ABOVE)
MASTER
BEDROOM I 21'4a'
FINISH 1ST FLOOR
+ — I 5-8" 4'-2"
NOTE:
I— - I SURVEYOR TO CONFIRM THE
LOCATION AND ZONING COMPLIANCE
FAMILY ROOM OF EXISTING/PROPOSED STRUCTURES
FINISH 1ST FLOOR L
�i EXISTING POURED I J
j CONCRETE FOUNDATION I OUTLINE OF PROPOSED BASEMENT ACCESS.
V�BASEMENT STAIRWAY _, ( HOWN FOR FULL HEIGHT FOUNDATION)---\\
I -
EXISTING FINISH BASEMENT FLOOR n I 7 NEW FULL HEIGHT
FOUNDATION WALL
+ _ REMOVE EXISTING REMOVE EXISTING
FOOTING AT LOCATION - THIS AREA�11
— CHIMNEY FOUNDATION I m T-6"
OF NEW STAIRWAY
EXISTING DEWATERING SYSTEM � �I CONCRETE SLAB
+PROPOSED FINISH BASEMENT FLOOR
EPDXY GROUTED DOWELS I I
FINISH BMT.FLOOR.
STEEL REINFORCING CRUSHED STONE I I ELEVATION T.B.D. Q
NEW POURED CONCRETE FOUNDATION
/APPROXIMATE
SECTION F2 T- I OUTLINE OF
J I // PROPOSED
_J STAIR
EXISTING PORCH(ABOVE)
SECTION F2
� I
EBAR
WATERPROOFING L
5 BOT.
SYSTEM &BOT. — — — — — — — — L J
URED CONCRETE _
4"SOLID PVC SLEEVES Oz OTING&AT8'O.C. - UNDATION PERIMETER FOUNDATION DRAIN: 4"THICK CONCRETE SLAB
4"DIA.PERFORATED PVC PIPE _3/4"CRUSHED STONE
FILTER FABRIC"WRAP"DISCHARGE TO APPROVED"LOW POINT" o
VAPOR BARRIER ~
U
3/4"CRUSHED STONE N P—SFoa
FOUNDATION PLAN McCARTHY RESIDENCE
V.I.F.ADEQUATE (PROPOSED) 161 CAMPBELL ROAD
SECTION F1 SOIL BEARING CAPACITY NORTH ANDOVER, MA