PROJECT
On April 18, 2017,the Planning Board approved a Site Plan Review Special Permit to allow an upgrade
to the existing athletic fields to provide a modern synthetic turf field and running track, viewing bleachers
(2,500 seats)with a press box, a new field house building for concessions bathrooms,team/locker rooms,
and a small event area.
On July It, 2017,the Planning Board approved a requested Unsubstantial Change to the remove the
proposed 7,500SF field house building and replace it with a smaller 2,200SF building for restroom
facilities and concessions.
On March 27,2018 Merrimack College requested an Unsubstantial Change to the original design to
temporarily gravel a portion of the baseball field site for occasional overflow parking purposes (280
spaces), The reason for this change is due to the determination that the baseball field was not needed,
however overflow parking is. No additional utilities are required for the site. The project's Independent
Monitor has reviewed the scope of the request and advised that the baseball field site is extremely flat and
the insignificant change should have no impact on the resource areas on the Andover side of the project.
I
DECISION
After discussion at the April 3, 2018 Planning Board meeting, and upon a motion by J. Simons, seconded
by P, Boynton,to deem the proposed changes to be unsubstantial changes that do not alter either the
intent or the conditions of the original Special Permits. The vote was 5-0, unanimous in favor.
CONDITIONS
• A pre-construction meeting must be held with the developer,Independent Monitor and Planning
Department(and other applicable departments)to determine if additional erosion control
measures will be necessary.
• The applicant shall provide the Planning Board an update on the status of the entire project site,
including the status and long-term plan for the temporary parking area, within 18 months from the
date of this Notice of Decision,
• Monitoring will continue on the site.
iE
iI
I
I
MER.RIMACK COLLEGE 315 Turnpike
NortNorthAndoverer,,MA 01845
merrimack.edu
{
1
a
March 27, 2018
I
Dear Planning Board Members,
I
Merrimack College is looking to temporarily gravel a portion of the previous baseball field site
as part of the Athletic District Project, as reviewed and approved by the Planning Board as a
Site Plan Review Special Permit on April 18, 2017, The previous reviewed plans for this
portion of the project along the North Andover/Andover border deep within campus, were to
remain in its existing condition since the college had no plans to change the landscape there,
During construction, it Was decided-that the baseball field was not needed and demolition of
backstop fencing and dugouts was done. As you may know, the baseball field remains in its
existing condition behind new fencing, has no relationship to current campus operations or
pedestrians and is not visible by any public ways in North Andover.
The College is in need for additional overflow parking and would like to create a gravel lot for
such occasional overflow parking purposes, notably for upcoming Commencement. This minor
project change request is being reviewed by the Andover Conservation Commission, as a
minor modification as well. Attached please find a plan of how parking spaces may be laid out
on the proposed gravel surface.
Thus, the College is submitting a Request for Unsubstantial Change in order to temporarily
create this gravel overflow parking lot under the existing Site Plan Review Special Permit
approved by the North Andover Planning Board. If you have any questions or concerns,
please feel free to contact me on campus at (978) 837-5459 or via email
at schwarxf@merrimack.edu. Thank you.
Sincerely,
Felipe Schwarz, AICP
Associate Vice President, Campus Planning& Facilities
An Augustinian Catholic college est-ibUshed in 194Z
1
4/3/2018 Town of North Andover Mail-Fwd:Merrimack College-Athletic District Project-Request for Ensigni€lcant Change
Fpia�
Jean Enright<jenrlght@northandoverma.gov> j
Fwd: Merrimack College -Athletic District Project - Request for Insignificant Change
1 message
Schwarz, Felipe<schwarzf@rnerrimack.edu> Tue.Apr 3, 2018 at 2:15 PM
To: Jean Enright<jenrlght@northandovorma.gov>
i
fyf..
..........Forwarded message-------
From:Gregory Hochmuth <ghochmuth@wsengineers.com>
Date:Tue, Mar 20, 2018 at 9:47 AM
Subject: RE:Merrimack College-Athletic District Project-Requast for Insignificant Change
To: "Schwarz, Felipe"<schwarzf@merrlmack,edu>, "Douglas, Robert"<rdouglas@andoverma.gov>,"Viselli, Lynn"
<Iviaelll@andoverma.gov>
Bob& Lynn,The Insignificant change should have no Impact on the resource areas on the Andover side of the
project, The area In question Is the former baseball field and It Is extremely flat,rI had a discussion with Mr.Schwarz,
and If the Insignificant c ange s granted,—am prepared to meet with an he d the contractor to determine if additional
erosion control measures will be necessary. Please let me know what the Commission decides and if you have any
questions for me. The school and their contractor have done an excellent job to date and have been responsive to all
of our recommendations. Take Care,Greg
From: Schwarz, Felipe [mallto:schwarzf@merrimack,edu]
Sent:Tuesday, March 20, 2018 8:53 AM
To: Douglas, Robert;Viselli, Lynn
Cc: Gregory Hochmuth
Subject: Merrimack College-Athletic District Project- Request for Insignificant Change
Good morning,
I hope all Is well.Please see attached request for Insignificant change for consideration. I hope we can move forward on
such a request review soon, If at all possible, If you have any questions, please contact me.Thank you.
Felipe,R.Schwarz,AICP
Associate Vice President, Campus Planning &Facilities
Merrimack College
315 Turnpike Street
North Andover, MA 01845
(978) 837-5459 office
(978) 857-1845 mobile
schwarzf@merrimack.edu
https:#mall.google.camlmalVulOf?ui=2&lk-7o2eff6266&jsverpA8g6)an 1 WAB.en.&view=pt&search-inbox&type=1628c991 c8683d31 Whu1628cb89220G214kimla
WETLAW
� f
MefLMO l
N/
rr'i ` � �.`/` s✓fir ,, + �1
l \
BLFFM
' r`� r
1 PAF404n SUMMARY
GRAYER_ 9f M SF rr � � 1
—`r -TOTAL 280 SPACM
r �
FMP
So
1 j
' t
e i t
t r
! r
®FT
r�ALE-�
Baseball Field - Temporary Gravel Parking Layout
Merrimack College
(2uirk
OORP.
3/19/2018 1 MAKM WAY C,PORGETOWN,Ma IBM
1
p
i
MERRIMACK COLLEGE N No Turnpike Street
No Turnpike
Andover,MA 01845 �
merrimack.edu
i
March 27, 2018 I
i
Dear Planning Board Members,
Merrimack College is looking to temporarily gravel a portion of the previous baseball field site
as part of the Athletic District Project, as reviewed and approved by the Planning Board as a
Site Plan Review Special Permit on April 18, 2017. The previous reviewed plans for this
portion of the project along the North Andover/Andover border deep within campus, were to
remain in its existing condition since the college had no plans to change the landscape there.
During construction, it was decided that the baseball field was not needed and demolition of
backstop fencing and dugouts was done. As you may know, the baseball field remains in its
existing condition behind new fencing, has no relationship to current campus operations or
pedestrians and is not visible by any public ways in North Andover,
The College is in need for additional overflow parking and would like to create a gravel lot for
such occasional overflow parking purposes, notably for upcoming Commencement. This minor
project change request is being reviewed by the Andover Conservation Commission, as a
minor modification as well. Attached please find a plan of how parking spaces may be laid out
on the proposed gravel surface.
Thus, the College is submitting a Request for Unsubstantial Change in order to temporarily
create this gravel overflow parking lot under the existing Site Plan Review Special Permit
approved by the North Andover Planning Board. If you have any questions or concerns,
please feel free to contact me on campus at (978) 837-5459 or via email
at schwarzf@merrimack.edu. Thank you.
T
Sincerely,
Felipe Schwarz, AICP
Associate Vice President, Campus Planning& Facilities
An Augustinian Catholic college establisher!in 7947
r - �
1 ,
WETLAND
-.
• / ` wEn.wa r
ORAVE L-91 M s
VA.-MR STAMW
ASH
P � F
r 1r P P
Baseball Field - Temporary Gravel Parking Layout
Merrimack College Quirk
OKST3/19/2018 1 Mwrra WAY GEO ,MA1833
r
......� _
NO
9 �
E - _,,` - q�,r �, '
S 1
h✓� '°� s I � k � c= E I� �
A
OR.
k
� r
N
On
}
S
9
`
I , _....
9
4
�pexenUW6� ..- -
ox
II n
M
I, ua
E:.
1
I
C
E �
I
Mr.
1 ;
1
ox
v
I I
�
1
i
i
TOWN OF NORTH ANDOVER TOWN CHARTER
(With Revisions through April 2015)
CHAPTER 2
TOWN MEETING
Section 9 Articles Having Environmental Implications
2-9-1 Articles Involving planning, zoning, subdivision control,land acquisition,conservation,
extension of sewer or water lines,the acceptance of streets and ways,and all other similar matters
relating to the environment shall not be voted on by the town unless the planning board shall have
considered them previously and Issued recommendations thereon.The chairman of the planning board,
or a designated representative,shall be present at the meeting to provide verbal explanations of the
board's recommendations.