HomeMy WebLinkAbout242-1866, 104 Bonny Lane OOC - Permits #242-1866 - 104 BONNY LANE 4/13/2023 4
I
i
Massachusetts Department of Environmental Protection Provided by MassDEP;
Bureau of Resource Protection - Wetlands 242-1866
MassDEP File#
Ll WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
A. Genera( Information
Please note: North Andover
this form has 1. From:been modified Conservation Commission
with added 2.This issuance is for
space to a.® Order of Conditions b.❑ Amended Order of Conditions
accommodate (Check one):
the Registry
of Deeds 3. To: Applicant:
Requirements
Patrick Gaffny
a.First Name b.Last Name
Important.
When filling
out forms on c.organization
the 104 Bonny Lane
computer, d.Mailing Address
use only the
tab key to North Andover MA 01845
move your e.City/Town f.State g.Zip Code
cursor-do
not use the q. Property Owner(if different from applicant):
return key.
r� a. First Name b. Last Name
c.Organization
rerun
d. Mailing Address
e.C€tyfTown f.State g.,Zip Code
5. Project Location:
104_Bonny Lane North Andover
a.Street Address _ b,City/Town
Map 62 Lot 47
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known: 42d71m1028s 71d09m557s
d. Latitude e. Longitude
wpaform5.doc•rev 511812020 Page 1 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242.-1866
MassDEP File#
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDl P Transaction#
ILI North Andover
City[Town
A. General Information (cont.)
6. Property recorded at the Registry of Deeds for (attach additional information if more than
E
one parcel):
Northern Essex
a.County b.Certificate Number(if registered land)
16_3_99 64
c.Book d, Page
March 7, 2023 _March 22, 2023 April 13, 2023
7. Dates; a.Date Notice of Intent Filed b. DateWPublic Hearing Closed c. Date of Issuance
s. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
Proposed Site Plan 104 Bonny Lane
a, Plan Title
Andover Consultants, Inc. Dennis Griecci, PE
b.Prepared By c.Signed and Stamped by
December 6, 2022 1"=20'
d.Final Revision Date e.Scale .W. .._-
See Attached List of Approved Documents
f.Additional Plan or Document TiNe g. Date
B. Findings
i, Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act), Check all that apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish a ® Prevention of
Pollution
d. ® Private Water Supply e. ® Fisheries f. ® Protection of
Wildlife Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control.
wpaform5.doc•rev 5/18/2020 Page 2 or 13
4
Massachusetts Department of Environmental Protection Provided by MasslDEP:
Bureau of Resource Protection - Wetlands 242-1866
WPA Form 5 -- Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L, c. 131, §40 eDEP Transaction#
ILI North Andover
City/Town
B. Findings (cunt.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c, ❑ the information submitted by the applicant is not sufficient to describe the site, the work,
or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
3. ® Buffer Zone Impacts: Shortest distance between limit of project 51
disturbance and the wetland resource area specified in 310 CM 10.02(1)(a) a.linear feet
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
9. ❑ Bank a.linear feet b. linear feet-- c. linear feet d. IiRear feet
S. ❑ Bordering _
Vegetated Wetland a.square feet b.square feet c.square Feet d.square feet
6. ❑ Land Under
Waterbodies and a.square feet b,square feet c,square feet d.square feet
Waterways
e.c/y dredged f.cfy dredged
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet C.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet W f.cubic feet g.cubic feet h,cubic feet m
8. ❑ Isolated Land
Subject to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9. ❑ Riverfront Area a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c,square feet d.square feet e.square feet f,square feet..._....
Sq ft between 100-
200 ft g.square feet h.square feet 1.square feet j.square feet
wpaform5.doo•rev Ell8/2020 Page 3 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP;
Bureau of Resource Protection - Wetlands 242-1866
MassDEP File 0
W.
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
ILI North Andover
Cityfrown _. _...
B. Findings (cons.)
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
1(). ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
11. ❑ Land Under the _
Ocean a.square feet b.square feet
c.c/y dredged d.c!y dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
13. ❑ Coastal Beaches _ ou yd cu yd
a.square feet b.square feet c. nourishment d. nourishment
14. ElCoastal Dunes cu yd cu yd
a.square feet b.square feet G. nourishment d. nourishment
15, ❑ Coastal Banks ........._
a.linear feet b, linear feet
16. ❑ Rocky Intertidal
Shores a.square feet b,square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.c/y dredged d.clq"6;d-ged
19, ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.cly dredged b.c/y dredged
21. ❑ Land Subject to
Coastal Storm a.square feet b.square feet
Flowage
22. ❑ Riverfront Area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e,square feet f.square feet
Sq ft between 100-
200 ft g,square feet h.square feet i.square feet J.square feet
wpaform5.doc•rev 6116/2020 Page 4 or 13
4
I
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1866
MassDEP File#
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaciion#
ILI North Andover
CitylTown
B. Findings (cont.)
protect is For 3.If the
23. ❑ Restoration/Enhancement*:
the purpose of
restoring or a.square feet of BVW b.square feet of salt marsh
enhancing a
Welland 24. ❑ stream Crossin 5
resource area g( ):
in addition to
the square
footage that a,number of new stream crossings b. number of replacement stream crossings
has been C. General Conditions Under Massachusetts Wetlands Protection Act
entered in
Section 6.5.c
(Bwv)or The following conditions are only applicable to Approved projects.
13,17.c(salt
Marsh)above, 1 Failure to comply with all conditions stated herein, and with all related statutes and other
please enter regulatory measures shall be deemed cause to revoke or modif this Order.
the additional g y , y
amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. The work is a maintenance dredging project as provided for in the Act; or
b. The time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
c. If the work is for a Test Project, this Order of Conditions shall be valid for no more than
one year.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order. An Order of Conditions for a Test Project may be extended for one
additional year only upon written application by the applicant, subject to the provisions of 310
CMR 10.05(11)(0.
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on unless extended in writing by the Department.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
wpaform5.doc rev 5/1812020 Page 5 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1866
MassDEP File#
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
ILI North Andover
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have been
completed.
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP")
"File Number 242-1866 "
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance(WPA Form 8A) to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition #13 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of Intent.
15, The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
wpaform5.doc•rev 511 812 0 2 0 Page 6 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1866 u
MassDEP File#
WPA Form 5 -- Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
Ll
CitylTown _
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her designee
shall inspect the erosion controls on a daily basis and shall remove accumulated sediments
as needed. The applicant shall immediately control any erosion problems that occur at the
site and shall also immediately notify the Conservation Commission, which reserves the
right to require additional erosion and/or damage prevention controls it may deem
necessary, Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
19. The work associated with this Order(the"Project")
(1) ❑ is subject to the Massachusetts Stormwater Standards
(2) ® is NOT subject to the Massachusetts Stormwater Standards
If the work is subject to the Stormwater Standards,then the project is subject to the
following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution control measures and best management practices
(BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i, all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, and/or treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii. as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
wpafofm5.doc-rev 5118/2020 Page 7 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
242-1866
Bureau of Resource Protection -Wetlands MassDEP F
MassDEP File#
LLI WPA Form 5 -- Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
C. General Conditions Under Massachusetts Wetlands Protection Act (cant.)
iv. all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans) approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified
that another party has legally assumed responsibility for BMP maintenance. Prior to
requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible
party (defined in General Condition 18(e)) shall execute and submit to the issuing authority
an Operation and Maintenance Compliance Statement("O&M Statement) for the
Stormwater BMPs identifying the party responsible for implementing the stormwater BMP
Operation and Maintenance Plan ("O&M Plan") and certifying the following:
i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of
Compliance, and
ii,) the future responsible parties shall be notified in writing of their ongoing legal
responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f) through 18(k) with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f) through
18(k) with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
wpatorm5.doc•rev 5/1812020 Pago 8 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 242-1866
WPA Form 5 -- Order of Conditions aSSDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City[Town W
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3) consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits) shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text
document):
20. For Test Projects subject to 310 CMR 10.05(11), the applicant shall also implement the
monitoring plan and the restoration plan submitted with the Notice of Intent. if the
conservation commission or Department determines that the Test Project threatens the
public health, safety or the environment, the applicant shall implement the removal plan
submitted with the Notice of Intent or modify the project as directed by the conservation
commission or the Department.
waform5,doc•rev 5/18/2020 Page 9 of 13
4
Massachusetts Department of Environmental Protection Provided by MassOBP:
Bureau of Resource Protection - Wetlands 242-1866
MassQBP
Ll WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPfransaction#
North Andover
CitylTovrn
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The North Andover hereby finds (check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1.Municipal Ordinance or Bylaw 2.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
b. ® that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
North Andover Wetlands Protection Bylaw& Regulations Chap. 190
1.Municipal Ordinance or Bylaw et. seq.
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
North Andover Conservation Commission Findings & Special Conditions (see attached)
wpaformUoc•rev 5/18/20ZG Page 10 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1866
NLI WPA Form 5 - Order of Conditions INassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 e6EPTransaction#
North Andover
CityfTown
E. Signatures
03 This Order is valid for three years, unless otherwise specified as a special 0 c" — —
condition pursuant to General Conditions#4,from the date of issuance. 11. Date of Issuance
Please indicate the number of members who will sign this form.
This Order trust be signed by a majority of the Conservation Commission. 2.Numb&of Signers
The Order must be mailed by certified mail(return receipt requested) or hand delivered to the applicant.A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmenta['Protection Regional Office, if not fling electronically, and the property owner, if different
from applicant,
na a Printed Name
W ignature7 Printed Name
Signature's %'ter Printed Wa-m'-e---
Signature
Printed Name
Signature Printed Name
Signature Printed Name
Signature Printed Name
Signature Printed Name
❑ by hand delivery on by certified mail, return receipt
! requested, on
Date Date
wpaform5.doc•rev 5118/2020 Page 11 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 24
MasslsIDEP
7EP File#
WPA Form 5 — Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction#
ILI
North Andover
City/Town
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the
land subject to this Order, or any ten residents of the city or town in which such land is located,
are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a
Superseding Order of Conditions. The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request for Departmental
Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from.
the date of issuance of this Order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this
appeal will be required to demonstrate prior participation in the review of this project. Previous
participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding
Order, or providing written information to the Department prior to issuance of a Superseding
Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act (M.G.L. c. 131, §40), and is inconsistent with the
wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
wpaform5.doo•rev 511 812 02 0 Page 12 of 13
4
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 242-1866
MassDEP File#
WPA Form 5 -- Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
North Andover
City/Town
G. Recording Information
Prior to commencement of work, this Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land subject to the Order. In the
case of registered land, this Order shall also be noted on the Land Court Certificate of Title of
the owner of the land subject to the Order of Conditions. The recording information on this page
shall be submitted to the Conservation Commission listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
.--------------------------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission _.._.
Please be advised that the Order of Conditions for the Project at:
104 Bonny Lane 242-1866
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
Northern Essex
County Book Page
for: Patrick Gaffny
_._..._
Property Owner
and has been noted in the chain of title of the affected property in:
16399 64
Book Page��
In accordance with the Order of Conditions issued on:
04-13-23
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5,eoc•rev 5118/2020 Page 13 of 13
I
104 Bonny Lane #242-1866
Findin s of Fact
Current Project Site Conditions: The 1.06-acre project site currently consists of an existing
single-family house constructed in 1981 associated driveway, deck, lawn, fencing,
landscaping and utilities.
The project site has been subject to previous wetland permitting with the North Andover
Conservation Commission (NACC),which includes the following:
•OOC # 242-123 - governed construction of the house, a full and complete CofC was
issued in 1984
The NACC agrees with the delineation of the following wetland resource areas as inspected
on site by the Conservation Field Inspector and are reflected
on the approved plan. The applicant has not attempted to overcome the presumption
of significance of these resource areas to the identified interests in the Act and
Bylaw.
a. Bordering Vegetated Wetland (BVW) - Wetland Flags 1A - 9A
U. 100-Foot Buffer Zone to BVW containing the 25' No Disturb Zone and 50-Foot
No Build Zone
c. The property is not within NHESP Priority Habitat.
d. The property is not within the 100-year floodplain or 200-Foot Riverfront Area
i
E
Therefore, the NACC hereby finds that the following conditions are necessary, in accordance
with the Performance Standards set forth in the State Regulations, the local Bylaw and
Regulations, to protect those interests noted above. The NACC orders that all work shall be
performed in accordance with said conditions and with the Notice of Intent/approved plans
referenced below. To the extent that the following conditions modify or differ from the
Plans,, specifications or other proposals submitted with the Notice of Intent, the conditions
shall control.
GENERAL CONDITIONS
21. The proposed work includes: construction of an in-ground pool, associated minor
grading,tree removal, 2' high landscape retaining wall, pervious paver patio, removal
of existing fence that encroaches into the 25' NDZ and neighboring property and
restoring this area to a naturalized state with native seed mix, installation of new
fencing, 1,000-gallon drywell and pool equipment. Work is within the 100-foot Duffer
zone to BVW with new patio just outside the 50' NBZ and pool at 567 from the
wetland. Fence removal and restoration to be performed within the 25' NDZ.
Construction access points are proposed on the southern and easterly side of the house
so as to avoid impact to existing hardscape and the 50-Font No Disturb Zone.
104 Bonny Lane #242-1866 NACC findings&Special Conditions
Page 1 of 13
104 Bonny Lane #242-1866
The site is located within the Watershed Protection Overlay District and received a
variance approval from the ZBA and a Watershed Special Permit from the Planning
Board. The Planning Board required a 3,d party peer of the stormwater design
performed by Horsley Witten, as the proposed pervious patio will serve as the
stormwater BMP to capture and infiltrate runoff.
22. The work shall coi form to the following (except as noted in the remainder of this
document where revisions may be required);
Notice of Intent and associated attaclunents filed by: Patrick Gaffny
104 Bony Lane
North Andover,MA 01845
Engineer; Deauiis Griecci, PE
Andover Consultants, Inc.
1 East River Place
Methuen, MA 01844
Approved Site Plans & Documents;
• "Proposed Site Plan" prepared by Andover Consultants, Inc., signed and
stamped by Dennis Griecci, scale 1"=20' final revision dated December 6,
2022
• Horsley Witten Peer Review Letters dated October 21, 2022, December 6,
2022 and December 14,2022;
• Andover Consultants, Inc. response letters to peer review dated
November 11,2022 (2 of same date,stormwater and wetland evaluation)
and December 6, 2022
• Operation&Maintenance/BMP Plan, prepared by Andover Consultants,
Inc., dated December 6, 2022.
23. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be
notified in writing within 30 days of all transfers of title of any portion of property that
takes place prior to the issuance of a Certificate of Compliance.
24. The conditions of this decision shall apply to, and be binding upon, the applicant,
owner, its employees and all successors and assigns in interest or control. These
obligations shall be expressed in covenants in all deeds to succeeding owners of
portions of the property.
25. Failure to comply with all conditions stated herein, and with all related statutes and
other regulatory measures, shall be deemed cause to revoke or modify this Order.
104 13onny Lanc #242-1866 NACC Findings&Special Condilions
Pa o2of13
104 Bonny Lane 9242-1866
26. This Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Environmental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued, to evaluate compliance with this Order of
Conditions, the Act (310 CMR 10.00), the North Andover Wetland Bylaw and
Regulations, and may require any information, measurements, photographs,
observations, and/or materials, or may require the submittal of any data or
information deemed necessary by the NACC for that evaluation. Further,work shall
be halted on the site if the NACC, agent or DEP determines that any of the work is not
in compliance with this Order of Conditions. Work shall not resume until the NACC
is satisfied that the work will comply and has so notified the applicant in writing.
27. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by-laws
or regulations.
28. The work authorized hereunder shall be completed within three years from the date of
this order.
29. This Order may be extended by the issuing authority for one but not more than two
periods of up to one year each upon application to the issuing authority at least thirtX
days (30) prior to the expiration date of the Order (Refer to Section 8.3) of the North
Andover Wetland Regulations).
30. The NACC reserves the right to amend this Order of Conditions after a legally
advertised public hearing if plans or circumstances are changed or if new conditions
or information so warrant.
31. Where the Department of Enviromnental Protection (DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission shall
be a party to all agency proceedings and hearings before the Department.
32. The NACC finds that the intensive use of the upland areas and buffer zone proposed
on this site will cause further alteration of the wetland resource areas. In order to
prevent any alteration of wetland resource areas a twenty five foot (25`) No
Disturbance Zone and a fifty foot (50`) No Build Zone shall be established from the
edge of the adjacent Bordering Vegetated Wetland resource area. The Conservation
Administrator and/or other agents of the NACC do not have the authority to waive
these setbacks as established under the local bylaw. No disturbance of existing grade,
soils or vegetation is permitted in the No-Disturbance zone. (See Section 3.4 &
Appendix F of the local Regulations).
104 Bonny Lane #242-1866 NACC Ciodings&Special Conditions
Page 3 of 13
I
104 Bonny Lane #242-1866
33. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors,
and other personnel performing the permitting work are fully aware of the permits
terms and conditions. Thereafter, the contractor will be held jointly liable for any
violation of this Order resulting from failure to comply with its conditions.
34. The owners of the project and their successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed any drainage
system and that said Town shall not be liable for any damage in the event of failure.
By acceptance of this Order, the owners agree to'indemnify and hold harmless to the
Town and its residents for any damage attributable to alterations undertaken on this
property pursuant to the Order. Issuance of these Conditions does not in any way
imply or certify that the site or downstream areas will not be subject to flooding, storm
damage or any other form of water damage. Maintenance of the drainage system, if
accepted by the Town as part of a public way,becomes the responsibility of the Town.
35. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other fore of
water damage..
PRIOR TO CONSTRUCTION
36. After its post-hearing deliberation, the NACC.believes that groundwater will be
encountered during excavation of the proposed in ground pool. With that in.mind,
the Commission will require that before any activity on site occurs for the project, the
applicant shall advance a sufficient number of test pits in the pool area to demonstrate .
the groundwater elevation and report its findings to the NACC. The NACC will then
determined a Modification to the approved plan or this Order of Conditions is
required to address any dewatering or other considerations that are necessary to
protect the wetland resource areas and Lake Cochichewick.
37. No work shall be undertaken until all administrative appeal periods from this Order
have elapsed or, if such an appeal has been filed, until all proceedings before the
Department or Court have been completed.
38. This Order shall be recorded, in its entirety, by the applicant at the Registry of Deeds
immediately after the expiration of all appeal periods. No work shall be undertaken
until the Final Order has been recorded in the Registry of Deeds or the Land Court for
the district in which the land is located, within the chain of title of the affected
property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done. In the case of registered land, the Final Order shall also
104 Bonny Lane 9242-1866 NACC Findings&Special conditions
Page 4 of 13
i
104 Bonny Lade #242-1866
be noted on the Land Court Certificate of Title of the owner of the land upon which
the proposed work is to be done, The recording information shall be submitted to the
North Andover Conservation Commission on the form at the end of this Order prior
to commencement of the work. Any Order not recorded by the applicant before work
commences may be recorded by the NACC at the applicant's expense.
39. A check payable to the Town of North Andover shall be provided in the amount of
three thousand dollars $3,000 which shall be in all respects satisfactory to Town
Counsel,Town Treasurer, and the NACC, and shall be posted with the North
Andover Town Treasurer through the NACC before commencement of work. Said
deposit of money shall be conditioned on the completion of all conditions hereof, shall
be signed by a party or parties satisfactory to the NACC, and Town Counsel, and shall
be released after completion of the project, provided that provisions, satisfactory to the
NACC, have been made for performance of any conditions which are of continuing
nature. The applicant may propose a monetary release schedule keyed to completion
of specific portions of the project for the NACC's review and approval. This condition
is issued under the authority of the local Bylaw.
40, The applicant shall designate an independent Wetland Scientist (or other
envirorunental professional as approved by the NACC or its agent) as an"Erosion
Control Monitor" to oversee any emergency placement of controls and regular
inspection or replacement of sedimentation control devices. Proof of the retained
monitor must be submitted to the Conservation Department on letterhead by the
retained consulting firm. The name and phone number of the erosion control monitor
must be provided to the NACC in the event that this person has to be contacted, due
to an emergency at the site, during any 24-hour period, including weekends. This
person shall be given the authority to stop construction for the purposes of
correcting problems with erosion control, The Environmental Professional will
immediately notify the Conservation agent of any matter that requires attention by
the Commission or the agent. The erosion control monitor will be required to inspect
all such devices and oversee cleaning and the proper disposal of waste products.
Cleaning shall include removal of any entrapped silt.
41. At least once during each week in which construction activities occurs on-site and for
as long thereafter as ground remains unstabilized, the applicant shall submit a written
report with photographs from the "Erosion Control Monitor" to the NACC certifying
that, to the best of his/her knowledge and belief based on a careful site inspection, all
work is being performed in compliance with this Order of,Conditions and that
approved setbacks are being adhered to. The erosion control monitor must visually
inspect all sedimentation/erosion control measures and assume responsibility for their
maintenance on a weekly basis and that they are functioning as intended. In addition,
all wetland resource areas must be visually inspected for siltation, turbidity, and/or
other water quality impacts. The Erosion Control Monitor shall be on site during
and/or following a major storm event of 1/2" inch of rain or greater (24-hour event) to
ensure that soils remain stable, and erosion controls are adequate and secure.
104 Bonny lane #242-1866 NACC Findings,&Special conditions
Page 5 of 13
104 Boony Laue #242-1866
42. The proposed pool shall employ a cartridge style filter system (not a backwash
system). Specifications for the cartridge system shall be provided to the Conservation
Department prior to sign�. off of the building permit.
43. The use of polymeric sand for the patio is strictly prohibited as the patio is an
infiltration feature. A bill of lading for pervious sand material shall be provided.
44. A sign, visible from the street, shall be displayed at the site not less than two square
feet or more than three square feet in size bearing the words "Mass. DEP #242-1866."
45. Wetland flagging on site shall be checked prior to start of construction and shall be re-
established where missing. All wetland flagging shall remain visible and enumerated
per the approved plan(s) throughout the life of the project and until a Certificate of
Compliance is issued so that erosion control measures can be properly placed and
wetland impacts can be monitored. Such barriers shall be checked and replaced as
necessary and shall be maintained until all construction is complete.
46. At a minimum, a row of staked 9" mulel/wood chip sock (Filtrexx SiltSoxx or
equivalent) backed by entrenched, staked silt fencing shall be properly installed
between all construction areas and wetlands as shown on the plans approved and
referenced herein and shall be inspected and approved by the NACC or its agent prior
to the start of construction and shall remain 'intact until all disturbed areas have been
permanently stabilized to prevent erosion, All additional erosion prevention and
sedimentation protection measures found necessary during construction shall be
implemented at the direction of the NACC or its agent. The NACC reserves the right
to impose additional conditions on portions of this project to mitigate any impacts
which could result from site erosion, or any noticeable degradation of surface water
quality discharging from the site. For example, installation of erosion control
measures may be required in areas not shown on the plan(s) referenced in this Order
of Conditions. Should such installation be required by the NACC, they shall be
installed within 48 hours of the Commission's request.
47. The applicant/contractor shall have on hand at pre-construction meeting, removal or
stockpiling, additional 50 feet of mulch sock and 1 roll of 100% biodegradable
erosion control blanketing (NO plastic netting allowed) and sufficient stakes for
staking,both covered from the elements, and shall be used only for the control of
emergency erosion problems and shall not be used for the normal control of erosion.
48. The erosion controls shall serve as the Iimit of work. Workers should be informed that
no use of machinery, storage of machinery or materials, stockpiling of soil, or
construction activity is to occur beyond this line at any time.
104 Bonny lane #242-1866 NACC Findings&Special Conditions
Page 6 of 13
104 Bonny Lane ##242-1866
49. Prior to any work on the project commencing on site, the offending fence shall be
removed from the 25' No Disturbance Zone and the area scarified and seeded with a
native seed mix. Appropriate erosion controls (i.e. staked and entrenched silt fence)
shall be installed at the wetland edge to protect the resource area from this work. This
area shall be left to naturalize and not subject to routine residential landscape
maintenance.
50. Prior to any work on the project commencing on site, the edge of existing vegetated
areas adjacent to the BVW and the edge of the restored area within the 25' NDZ shall
be monumented with six (6) weather resistant posts (i.e. 4x4 pressure treated posts or
cedar posts) or where appropriate on the chain link fence that shall receive wetland
markers. These posts and markers shall be installed at roughly 35-foot intervals facing
upland. Said markers shall incorporate the following text on their upland side:
"Protected Wetland Resource Area This will designate their sensitivity and assure
no further inadvertent encroacl-unent into the wetland. Said markers are available for
purchase in the Conservation Department at Town Hall. The applicant shall instruct
all agents to explain these markers to buyers/lessees/landscapers and all persons
taking over the property from the applicant. These markers shall remain posted and
be replaced as necessary in perpetuity.
51. Prior to any work corm encing on-site and in time for the on-site pre-construction
meeting, the applicant shall submit to the NACC or its Administrator for review and
continent, a detailed work schedule/sequence of construction.
52. No changes to the approved plan shall be implemented in the field until written
approval has been Wanted„by_ the NACC. Any changes in the submitted plans caused
by the applicant, another Board's decision or resulting from this Order of Conditions
must be submitted to the NACC for approval prior to implementation. If the NACC
finds said changes to be-significant, the NACC will call for another public hearing (at
the expense of the applicant). Within 21 clays of the close of said public hearing the
NACC will issue an amended or new Order of Conditions. Any errors found in the
plans or information submitted by the applicant shall be considered as changes.
53. Prior to any work commencing on site, it is the responsibility of the applicant to
procure all other applicable federal, state and local permits and approvals required for
this project, and no work within the Commission's jurisdiction shall commence
until all other state or local permits, approvals, and variances have been obtained.
This is to ensure that impact to jurisdictional areas are avoided in the case that any
such permit is denied or withheld for any period of time, thereby maintaining the
integrity of the resource area or buffer zone until such time all approvals are
granted. Note: The Building Permit shall have been applied for at the time of a pre-
construction meeting with the Conservation Department, and Conservation
Department sign off will not be granted until pre-construction conditions are satisfied.
104 Bonny Lanc #242-1866 NACC Findings&Special Conditions
Page 7 of 13
104 Bonny Lade 9242-1866
54. The applicant and/or the legal owner of that portion of land upon which these Orders
of Conditions have been placed shall provide to the NACC prior to transferring, or
assigning any portion of said land to another party, subject to said Orders of
Conditions, the "Compliance Certification Form Affidavit" attached via "Appendix
A" signed under the pains and penalties of perjury, stating that said applicant and/or
owner has read these Orders of Conditions and is in compliance with each and every
condition. This document shall apply to each of the conditions referenced herein and
shall be provided to the Conservation Department at least five (5) business days prior
to the closing of said land transaction.
55. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
56. Once these above-mentioned pre-construction requirements are complete, the
applicant shall contact the Conservation Office prior to site preparation or
construction and shall arrange an on-site conference with an NACC representative, the
contractor, erosion control monitor and the applicant to ensure that all of the
Conditions of this Order are understood. This Order shall be included in all
construction contracts, subcontracts, and specifications dealing with the work
proposed and shall supersede any conflicting contract requirements. The applicant
shall assure that all contractors, subcontractors and other personnel performing the
permitted work are fully aware of the permit's terms and conditions. Thereafter, the
contractor will be held jointly liable for any violation of this Order of Conditions
resulting from failure to comply with its conditions. The applicant or contractor shall
notify the NACC in writing of the identity of the on-site construction supervisor hired
to coordinate construction and to ensure compliance with this Order. A reasonable
period of time shall be provided as notice of the pre-construction meeting (e.g. 72
hours).
"STORMWATER MANAGEMENT CONDITIONS
57. There shall be no increase in the post development discharges from the project or any
other changes in post development conditions that alter the post development
watershed boundaries as currently depicted in the Notice of Intent and approved by
this Order of Conditions, unless specifically approved in writing by the Commission.
58. Water quality in down gradient BVW's shall not differ significantly following
completion of the project from the pre-development conditions. There shall be no
sedimentation into wetlands or water bodies from discharge pipes or surface runoff
leaving the site.
104 Bonny lane 0242-1866 NACC Findings&Special Conditions
Page 8 of 13
I
104 Boiiny Lane #242-1866
59. The Operation & Maintenance/BMP Plan shall be adhered to post construction to
ensure that the pervious paver patio and the associated 4" perforated drain pipe are
functioning properly. Reporting of any needed maintenance shall be submitted to the
Conservation Department as requested or as such need arises.
DURING CONSTRUCTION
WJ
60. Upon beginning work, the applicant shall submit written progress reports every
month detailing what work has been done in or near resource areas, and what work is
anticipated to be done over the next period. This will update the construction
sequence and can be a part of the weekly erosion control reports.
61. Any fill used in connection with this project shall be clean fill, containing no trash,
refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire,
lath, paper,cardboard, pipe, glass,processed glass aggregate, concrete,recycled
concrete aggregate, tires, ashes, refrigerators, motor vehicles or parts on any of the
o certificate of origin
foregoing. Any fill imported to the site must be accompanied by a cert„„
or an analysis certifying.cleanliness -whichever is most applicable as determined b
the Conservation Coirunission or its staff,
62. All exposed soil finish grade surfaces shall be innnediately landscaped and stabilized,
or loamed, seeded and mulched,with a layer of mulch hay. All disturbed areas must
be graded, loamed and seeded prior to November 1st of each year. Outside of the
growing season, exposed soil finish grade surfaces shall be stabilized with a layer of
mulch hay until climate conditions allow for seeding. During construction, any area of
exposed soils that will be left idle for more than 30 days shall be stabilized with a layer
of)mulch hay or other means approved by the NACC,
63. Associated pavement and roadways shall be swept at least weekly or as directed by
the Erosion Control monitor, the Site Supervisor,Project Manager, or Conservation
staff for as long as the site remains exposed and un-stabilized. If material is tracked
beyond the construction entrance onto the adjacent roadway, it will be swept up daily.
64. The construction access for the project shall be swept daily to remove sediment
deposited by construction vehicles accessing the site and avoid tracking on to public
right of way.
65. All materials stockpiling area shall be more than 50 feet from the wetland. At no time
shall be stockpiling of soil or any other materials occur on the wetland side of the
erosion controls.
66. All waste generated by, or associated with, the construction activity shall be contained
within the limit of work, and away from any wetland resource area. There shall be no
104 Bonny Lane 9242-1866 NACC Findings&Special Coiidilions
Page 9 of 13
104 Boiiny Lane 9242-1866
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain dumpsters (or other suitable means) at the site
for the storage and removal of such spent construction materials off-site. However, no
trash dumpsters will be allowed within 50 feet of the edge of IVW.
67. Cement trucks shall not be washed out in any wetland resource or buffer zone area.
Any deposit of cement or concrete products into a buffer zone or wetland resource
area shall be removed by hand.
68. Accepted engineering and construction standards and procedures shall be followed in
the completion of the project.
69. During and after worlc on this project, there shall be no discharge or spillage of fuel, or
other pollutants into any wetland resource area. if there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the
applicant within one (1) business day, No construction vehicles are to be stored within
100 feet of wetland resource areas, and no vehicle refueling, equipment lubrication, or
maintenance is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
70. No underground storage of fuel oils shall be allowed on any lot within one-hundred
(100) feet of any wetland resource area. This condition shall survive this Order of
Conditions and shall run with the title of the property. This condition is issued under
the authority of the Town's Wetland protection Bylaw.
71. Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen
types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and
herbicides shall not be used within 100 feet of a wetland resource area. This condition
shall survive this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the TowWs Wetland Protection Bylaw and
shall remain in perpetuity. "This condition may be superseded by more restrictive
conditions administered by the Planning Board Watershed Special Permit."
72. No sodium-based products shall be used for control of ice or snow within 100 feet of
the wetland.
73. There shall be no dumping of leaves, grass clippings, brush, or other debris into a
wetland resource areas or the 25-foot No-Disturb Zone. This condition shall remain in
perpetuity.
74. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done by
104 Bonny Lane, #242-1866 NACC Findings&Special Condiflons
Page 10 of 13
i
I
104 Bonny Lane #242-1866
loan-ing and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved,
75. The use of coal tar-based pavement sealants is prohibited on the property, as they
have been determined to contribute high levels of polycyclic aromatic hydrocarbons
(PAHs) to stormwater runoff. This condition shall survive the Order of Conditions
and shall run with the title of the property.
I
76, Any/ pool water draw down shall be directed into the 1,000 drywell, and not
discharged directly into the bordering vegetated wetland,
77. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded,
78, Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A - "Request for a Certificate of Compliance,"
b. A letter from the applicant requesting a Certificate of Compliance.
c, The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the it trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project,
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission,
i. Check, payable to the Town of North Andover,for Certificate of Compliance filing
fee (inquire with Conservation Department for current fee rate).
j An"As-Built" plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor) of the
Commonwealth, for the public record. This plan will include:
➢ "As-Built" post-development elevations of all drainage & stormwater
management structures constructed within 100 feet of any wetland resource
area.
➢ "As-Built" post-development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local Wetland Protection Bylaw.
104 Bonny Lane 9242-1866 NACC Find'nigs€c Special Conditions
Page 1 I of 13
i
104 Bonny Lane #242-1866
➢ Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions,fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
➢ A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes pny disturbance of soils or vegetation.
79. The following special conditions shall survive the issuance of a Certificate of
Compliance (COC) for this project:
➢ 25' No Disturbance Zone and a 50' No Build Zone. Future work within 100'
of existing wetland resource areas will require a separate filing with the
NACC of the Regulations for performance standards within these zones.
The Conservation Administrator and/or other agents of the NACC do not
have the authority to waive these setbacks as established under the local
Bylaw (Condition #32);
➢ Pool filtration system shall be cartridge style (Condition#42);
➢ No polymeric sand shall be used on the pool patio (Condition #43);
➢ 25" NDZ restoration area left to naturalize (Condition #49);
➢ Resource Area Markers (Condition #50);
➢ Operation& Maintenance of pervious patio (Condition #59);
➢ Discharge or spillage of pollutants (Condition#69);
➢ Prohibition of underground fuels (Condition #70)
➢ Limitations on the use of fertilizers, herbicides, sodium based de-icing
compounds and pesticides (Conditions #71 & #72);
➢ No dumping of leaves, grass clippings,brush, or other debris into a wetland 9
resource areas or the 25-foot No-Disturb Zone (Condition #73).
➢ Prohibition of the use of coal tar based products for paving (Condition #75);
➢ Pool water management (Condition #76).
104 Bonny Lane, #242-1866 NACC Findings&Special Conditions
Page 12 of 13
I
144 Bonny Lane #242-1866
APPENDIX A- AFFIDAVIT
1, on oath do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK AT LEAST ONE BLOCIQ
1. I am the of
(position with applicant) (applicant naive or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission.
&/or
2. I am the Of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File#) and every condition which has been set forth
it said Order of Conditions.
4. 1 hereby affirm and acknowledge that on this day of 19
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth it Order of Conditions are presently in compliance,
(DEP File #)
5. 1 hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions .
(DEP File#)
Signed under the pairs and penalties of perjury this day of 19
(Signature-authorized agent of applicant or owner)
I04 Bonny Lanc #242-1866 NACC Findings&Special Conditions
Page 13 of 13
Pool and Patio
Operation & Maintenance/BMP Plan
104 Bonny Lane
North Andover, Massachusetts
December 6, 2022
Prepared for:
Patrick Gaffny
104 Bonny Lane
North Andover, MA 01845
Prepared By:
andover
consultants
inc.
1 East River Place
Methuen, MA 01844
YN0.6.0.1YPro;rcts121Y21.51 YdocslreportsiiO4 eanny_p81
ManuaLdan 104 Bonny Lane North Andover,.Mass
i
Project Information
Site Address
104 Bonny Lazne
North Andover,MA 01845
Owner
Patrick Gaffny
104 Bonny Lane
North Andover, MA 01845
Site Contact
Nazne:Patrick Gaffn
Telephone: 978 257-4163
Email:patgaffS@yahoo.com
M0,6.0,11Proieds12 112 1-5 71decslrepa1s11048enny 08M
Manuel.doc 1 104 Bonny Lane North Andover,Mass ,,
A. General Operation & Maintenance
A.1 Permeable Paver Patio Maintenance
The primary maintenance requirement for permeable pavers is to clean the surface
drainage voids. Pine debris and dirt accumulate in the drainage openings and reduce
the paver's flow capacity. Even though some irreplaceable loss in permeability
should be expected over the paver's lifetime,you can increase the longevity of the
system by following the maintenance schedule for sweeping and high-pressuie
washing, restricting the area's use by heavy vehicles,limiting the use of de-icing
chemicals and sand,and implementing a stringent sediment control plan.
Preventing Clogging of Permeable Paver Surface Areas
> Patio areas and/or other areas with permeable pavers shall be cleaned annually
with vacuums or hand swept.
> Do not allow construction staging,soil/mulch storage,etc. on unprotected
pavement surface.
> Maintain vegetated areas adjacent to areas with permeable pavers to prevent
washout of soil onto surface.
> Do not apply any type of sealant to permeable pavers.
Removing Snow and.Ice
> Shovel snow off permeable pavers as necessary.
> Do not apply abrasives such as sand or grit on or adjacent to permeable pavers.
> Avoid plowing of areas with permeable pavers.
Inspecting the System
> Inspect areas paved with permeable pavers monthly for the first three months
after construction to ensure proper functioning and correct any areas that have
settled or experienced washouts.
> Inspect areas paved with permeable pavers annually after initial three month
period.Annual inspections should take place after large storms,when puddles
will make any clogging obvious.
Repairing Damages
> Do not apply any type of sealant to permeable pavers.
> If necessary,add additional aggregate fill material made up of clean sand or
gravel,
> Damaged interlocking paving blocks should be replaced.
. .11Psofecis121121-5lldocs4eporls1f048anny_O&M
Manualal.doo 2 104 Bonny Lane North Andover, Mass
lAan
A.2 Pool Maintenance
Primary pollutants of concerns in swimming pools are chlorine,bromine or
chloramines used as disinfectants. These chemicals, if discharged to a resource area
or storm drainage system can have negative impacts on water quality and aquatic
life.
Storage of Chemicals
> Pbol chemicals should not be stored outside. Chemical shall be stored inside and
according to requirements of chemical provider in order reduce contamination in
event of spill.
> Spill clean up materials as recommend by chemical manufacture should be on
hand in the event of a spill.
Pool Drawdown and Maintenance
> The pool shall be equipped with a non-backwash cartridge filter to eliminate the
need to discharge pool water into lawn area during regular pool cleaning.
> fool grater should not be discharged directly to street or storm drains
> Prior to draining of pool,pool water shall be de-chlorinated per state municipal
requirements by eliminating chlorine usage for approximately ten days to allow
chlorine levels to dissipate or by utilizing sodium thiosulphate or other pool
dichlorination chemical approved by DPP and for use in watershed areas.
> Pool water should be discharged into the drywell slowing over a period of time
to allow for recharge of pool water into ground.
> When a severe (>100 year storm event)is predicted, the pool water level should
be drained to a sufficient level to allow for 8 inches of rain to be collected in the
pool.
A.3 Vegetated Areas Maintenance
Although not a structural component of the drainage system, the maintenance of
vegetated areas may affect the functioning of the storniwater management system.
This includes the health/density of vegetative cover and activities such as the
application and disposal of lawn and garden care products, disposal of leaves and
yard trimmings and proper aeration of soils.
> Inspect planted areas on a semi-annual basis and remove any litter.
> Maintain planted areas adjacent to patio to prevent soil washout.
> Immediately clean any soil deposited on patio.
> Re-seed bare areas;install appropriate erosion control measures when native soil
is exposed or erosion channels are forming.
> Pesticide/Herbicide Usage—Only organic or slow release nitrogen,phosphorus
free products shall be used, Non-organic pesticides and herbicides use is
prohibited
Y110.6.0.iIProJecisl2i12i-5lldacsVeporFslla48onny Q&A7 . 3 104 Bonny Lane North Andover,Mass
Manual,doc
A.4 Long Term Maintenance/ Evaluation Checklist
104 Bonny Lane -- North Andover, Mass
a � c
N rr
L +
V
a � Ci .� L. C � o
U C C L O 4� C L E
ca .0 .� C V N v1 ur N GN1 G�
t o a ❑ c) W a
Permeable Vacuum sweep or hand 1X per as
Pavers sweep year j j necessar
y
Pool as
Maintenance See requirements above yeXaprer j j necessar
y
Repair/re-seed bare
Vegetated spots, replant as 2X per as
Areas necessary to prevent year j / necessar
erosion y
❑t6.B.BJIPrgecls121521.51}dacs}repoHs}tpq[3onny_0&h1