HomeMy WebLinkAbout03-31-23 Rev Site Plan 1845 Turnpike - Plans - 1845 TURNPIKE STREET 3/31/2023 �"��i ERR aNFO HNISH GRADE NOTES
1,SEE TOWN OF NORTH ANDOVER PARCEL ID IF107.B-0077-0000.0,
OR—TO I-EKITIF L DEED BOOK 05959 PAGE 328 AND PLAN#13362 ENDRD FOR SITE,
rx NX
m< F HHO HEIR 2.TOPOGRAPHIC DATUM BASE IS NAVD88,BENCHMARK IS TOP OF
? "'1TOP SIDES AND BD70N FOUNDATION of HOUSE ELEVATION=145.5 PER SITE PLAN BY
TOP
EL 1a3.so K b$o a oo i MARCHIONDA ASSOCIATES DATED JUNE 27,2001,
�ll 3.WETLANDS DELINEATED BY HORSE ENVIRONMENTAL SERVICES,
0
°o f
3 TYNGSBOROUGH,MA.OCTOBER 2022.
EL 1a1.29OF crvnneeR STONE BELow 4.ZONE DISTRICT. (VR)VILLAGE RESIDENTIAL REQUIRES 25'FRONT,
15,SIDE AND 30'REAR YARD SETBACKS.
PROP.TEWPORAII ART
`TC'KP
HE
AREA
5.EXISTING GRADE IN AREA OF PROPOSED ADDITION TO BE THE
TYPICAL CROSS SECTION PROP.RETAI O$HE(ON DONC.SLACKER FINISH GRADE-NO GRADING CHANGES AT DECK,TO BE ENCLOSED,
ROOF INFILTRATION SYSTEM uW°°+V' PROP-RoIF oRAN ARE PROPOSED-ALL NOW PAVED DISTURBED AREAS TO BE LOAM
WHLiR'A TO SYSTEM AND SEED FOUNDATION FOR ADDITOH TO BE FROST WALL WITH
rv.rs' ,,• /F DRAIN(TIP Roar SLAB ON CRADE.
'FSRT VIEW__
HOK{OVIOS,assoaAnon� 6 EXISTING RETAING WALL TO BE REMOVED TO PROVIDE CONSTRUCTION
""" U wNsaaUT(TYP_) EQUIPMENT ACCESS TO CONSTRUCTION AREA AND THEN REBUILT IN
Tau aN was1ED, �P / PR��DILTso0c PLACE WHEN ADDITION IS COMPLETED.
WCLTE'BECHAR NR CCO(R InODEL) �IAy ; (E ION CCN INOL)
I IEEE LaRoi c IF UNDER PRVEUENT i 1MI'JS4T X/ -- 250.00 ].THE SITE IS SHOWN AS BEING IN THE TOO YEAR FLOOD PLAIN
NF T/ ��«°p Plop.IT N5 AND LANDING ZONE"OTHER X"PER FEMA COMMUNITY PANEL NO.25009CO239F
z' BE Fo DATED JULY 3, 2012, HOWEVER THE 100 YEAR FLOOD PLAIN DOES
N `n�h� NOT CRO55 ROUTE 114 PER THESE MAPS,AND THEREFORE THE
WA u o 100 YEAR FLOOD ELEVATION IS BELOW 13GE
( d n 1 I I`
G'oO" ��Ados
� ` ENCLOSED BUILDING
ON EXIST,DECK FOOTPRINT
( gT6 T T (REPLACE EXIST FOOTINGS WITH SONOTUBES)
PE 1 6.
PAR;(Is"Ee oernlq xz RNOPiaNOINc LEGEND
rnrvY TREEUNE
PROP.SILT SOCK X 181 SPOT ELEVATION
ROOF INFILTRATION SYSTEM '"' T T ;1,,,k 1 ��,G, '� "�'°� gFASIDN CONTROL)
--�aa ELEVATION coNTouR
(1 CHAMBER �` XT Tv i.asyw° �'pa Cq C� T.sHEo Ta BF I _ _ EDGE of DELINEATED WETLANDS
„� 1( REMOVED AND RESET ��� SILT SOCK(EROSION CONTROL)
AD TgQgE LAND AREA LOAM RFM OECD A,BE WETLAND FIELD FLAG
2` a Wo \ N/F NOW OR FORMERLY
FND FOUND
.LOT 1 W.F. WOOD FRAME
>c COP CEMENT CONCRETE PAD
hsR d °�• •. 1�� PROP. PROPOSED
nrrecx mr+rePco uv �1' �°.a°I "•" �/ )P� i CEM.CONC. CEMENT CONCRETE
�a11111T III MA
swvaar eaz Y 1 1 " i�T NET. RETAINING
a vvc ra wr.o nr x 61\ 1 �� •PC
DOWNSPOUT
1 v "1�° �'11p �� ♦ Ro OOF DRA N
...t R_�� L °°
vac vaxiw cxc� 3 '.� mz `♦♦ ED
ro eonoM or cunuern = .
ce�vnxizro ore snixuss "T "'
INSPECTION PORT _____________ ter, \\ ♦ �``0
TYPICAL INSTALLATION DETAIL
oIOFA.�owPP� 1 Y,bw ♦µ.a� ��� �`_ „ � SITE PLAN
usx eEacu 250.00' '° n S55'17'29"E LAND AT 1845 TURNPIKE STREET
IN
NORTH ANDOVER, MA
SHOWING PROPOSED ADDITION
ROOF LEADER DETAIL PREPARED FOR
TURNPIKE STREET QING HE AND
s. (PUBLIC—1116 LAYOUT B _ w_R
YARONG YO UNG
q< IR45 TURNPIKE STREET
LAID AN IRASE PER
ITS NORTH ANDOVER,MASSACHUSETTS 01845
0OW
IT s 0.' 1-11 DATE FERRVARY 28,2023 REVISED MARCH 31,2023
cano SCALE 1-20'
s(Lr socK DETAIL MERRIMACK ENGINEERING SERVICES
66 PARK STREET
cor m sce�c s o i ANDOVER.MASSAUHUSET RE 01810
PHONE- (978)475-3555 FAX: (978)475-1448
EMAIL' MERRENC®API