Loading...
HomeMy WebLinkAbout1989-12-04 Department Review SPR O H- FFICS OF; Town of' NOW IMI(Mver, APPEALS NORTH ANDOVER HL"MING Milssacl I t IS("t Is 1 H45 DIVISKMOF 007CONSERVATION PLANNING PLANNING & CONIMUNII'Y DEVELOPMENT K1\11EN I 1.1'. NELSON, MEMORANDUM T0i Conservation Commission FROM: Scott A. Stocking,lW&Aanner DATE : October 21 , 1988 RE : Riparian Realty Trust Site plan Review Please be advised that the Planning Board has not held a public hearing on the above cited project. Due to an incomplete submittal to the Board. Staff would recommend that the commission not consider closing the public hearing on this project until the Planning Board has an opportunity to review the project during a public hearing and submit our findings and recommendations to you for consideration . The earliest this project could be considered by the Planning Board is November 17th. Please let me know if I can be of any further assistance , of .Z. NORTH ANDOVER FIRE DEPARTMEN"r GENTIW_ riRE HEADOUARTERS Z 124 Baer) Strop', "AND el Nortti An(iovor, Mass, 01845 WIt I 1AM V. 001,AN Tel. (617) 686-3812 Chief of Ou�parlmont To: Scott Stocking, Planning DEpt. From: Lt. Andrew Melnikas, Fire Prevention Officer Re: Site Plan Review-Riparian Industrial Park Berry St & Route 114 Date: October 28 , 1988 The Fire Department has reviewed these plans and has the following comments : 1 . Complete access around the building be provided. 2. The building be fully sprinklered. 3 . Horn lights, pull stations and indicator strobe light on each section be included. 4. Additional hydrants be included; location to be determined by the Fire Department. 5. A master fire alarm box will be required to connect the internal fire alarm system to the municipal Fire Alarm System. 6 . The developer shall work closely with others in the area in bringing the fire alarm line down Turnpike' Street. 7 . A secured key access box be installed on the building prior to occupancy. Lt. Andrew Melnikas Fire Prevention Officer DRS "' VE LIVES" of 14 tyre ). OFFICES OF: � Town of 120 M�,in Sireel APPEALS `';+ A1 Chiw1DO V ER NOrti, AI,�IE]Ve;� NORT , BUILDING �,esACHUB�stg �-1ass�,rli��s�,tl s()184} CONSERVATION DIVISION O I(i 1 7)685-4775 HEALTH PLANNING PLANNING & COMMUNI I`Y DEVELOPMENT KAIU i I.P. Nla.SON, 1llIZI.i"C(?It October 31 , 1988 Rivers Development Corp, 24 Gould Street Reading, MA 01867 Re : Riparian Industrial Park Site Plan Review Dear Sirs: Attached please find a copy of my staff report to the Planning Board for the above cited project. The first public hearing for this project is scheduled for November 17 , 1988 . Please plan to attend the next Technical Review Committee Meeting to be held on Wednesday, November 9, 1988 . Thank you for your time and effort in this matter. Sincerely, Scott A. Stocking ICP Town Planner / jle } STAFF REVIEW SITE PLAN REVIEW PLANNING BOARD MEETING November 17 , 1988 PROJECT , Riparian Industrial Park LOCATION : Rte 114 & Berry Street APPLICANTS Rivers Development Corp. Designers: Hayes Engineering Wakefield, MA 246-2800 EXISTING CONDITIONS , Forest/Pasture SUMMARYs Land was rezoned to VR during the 1987 Town Meeting. Applicant filed a "Form A" plan to grandfather the I-1 Zoning . Grandfathering to run out 10/88 . CURRENT ZONING: VR ( I-1 ) grandfather parcels - Form A plan approved October 1985 . REQUIRED PROVIDED MINIMUM LOT AREA (Lot 1 ) 80,000 sq. ft. 120, 473 sq. ft. FRONT YARD (Min) 50 , 102 ' SIDE YARD (Min) 50 ' 100 , REAR YARD (Min) 50 ' 52 ' ROADWAY FRONTAGE (Min) 150 , 701 ' PARKING 48 48 SQ.FT. OF STRUCTURE 17 , 600 GFA LOT COVERAGE (% ) 35% 7% STORIES : N/A( 55 ' ) 2 ( 40 ' ) F .A.R. . 50 . 15 MINIMUM LOT AREA (Lot 2 ) 80,000 sq. ft. 522 , 720 sq. ft. FRONT YARD (Min ) 50' 114 ' SIDE YARD (Min) 50 ' 74 ' REAR YARD (Min) 50 , 50 ' ROADWAY FRONTAGE (Min) 150 ' 1 , 138 ' PARKING 139 98 SQ. FT. OF STRUCTURE N/A 104,800 sq. ft. LOT COVERAGE( % ) 35% 10% STORIES : N/A ( 55 ' ) 2 ( 40 ' ) F. A. R. . 50 . 20 � e- � r A� �. .. t ';L y�t f .may �� '� � �� �,. �'•• i. tl s lTa C� ky i y 41, 1! "'.''r a : ON 1*7�; '' ' !t l -: !1 1 ,'•"S`�, 'fj'3k=Jl�:' /� t l �+�{ ` '� f v Yi,Iy>� � !- I' .try' _' - �G/�} 4, ��v 1t•`• Jtj' �g ,+/ '{�� ■'' r� �(Q �}�� '. �� J,[a �..l A'ii<�� r. b J.'' �'ryb,,���w +�4►�.r.�s t., ri ^�s rG��',.,. _� r� 4'` t'irY.'�.,P V.'! :�, i � ! .'r`¢{;{�r ` !r =•''•t5�:-,,r e,'V.UJI �S� i � '� tv ryrt r,.�5j�X CF \ 0.1 • � �����$��r,>:. �<�� cam' t`� � ? ° ¢��y;1. �Ir r k` ., a, ", 'tip, �'f � •�S `Y�,,,{~ 1 {tl � ,If 1 r - 1 kc�- i � e +i•I• {• y. !i ty*�ft,r� ,, � N 1 S,t`�t � '�.'y 7 yrS_'! h `4''.s - !`��r�• � '� ` �A.\' l�h / (A� .-fir A '� �{ �� T 1 , _ try yy�/'� `• 4 1�,'� \ _ ! U . f General Description This project is located approximately 1 , 500 ' from the Berry ,Street/Route 114 intersection, just south of the Equestrain Shop. The applicant is calling for the construction of 3 separate office/industrial buildings, 2 stories in height containing approximately 122, 400 GFA located on two lots of record which contains approximately 14 . 8 acres of land. The site contains extensive wetlands . The location of the boundary is currently under appeal with D. E . Q. E . The applicant calls for a driveway crossing to connect an "island" of high ground with the Route 114 portion of the site . Staff has submitted the plan to State D. P . W. for review. The applicant currently shows deceleration and acceleration lanes along the Route 114 roadway. The FAR and lot coverage numbers are low due to the amount of wetlands on the site and the difficult configurations of highground left for development. The applicant is extensively utilizing this highground showing no buffers adjacent to wetlands and a high degree of impervious surface . The building is proposed to contain 62 units which contain 2,000 sq. ft. each ( 1 ,000 sq. ft. per floor) . f Town Staff Comments A .P .W. 1 . Might need to do a detailed hydrology study for the entire drainage basin. 2 . Will' study water and sewer issues 3. Proposed roadway is functioning as a darn to retain water and meter out the excess . NACC 1 . under review on a Notice of Intent. 2 . wetland delineation under appeal with D. E . Q . E . (July, 1988 ) want to use the area as open space . Police 1 . Intersection improvements for Route 114/Berry Street 2 . Analyze traffic impacts on Campbell Road 3. Improve Berry Street - narrow roadway 4 . Need to repaint the street lines 5 . Contribute to the optics system for the traffic lights Fire 1 . Extend master fire alarm system . from the nursing home to this site . 2 . Need additional hydrants 3 . Need sprinkler system per NAFD requirements 4 . Need a tenant notification system. State D. P . W. 1 . Notice sent to State by applicant to begin the MEPA process for this site . 2 . Applicant has not begun the ENF process with the State due to lack of input from Planning Board. a } Board of Health 1 . Drainage concerns due to flat site, and a flat drainage basin. 2 . High watertable on this site . 3. Title V problems dealing with a force main, holding tank and septic fields on Lot 1 only. 4 . Provide for connection to sewer lane to be built along Route 114 . i l 1 Staff Review Staff withheld the publication of the public hearing for this project for one month due to an incomplete submittal on September 21st. (Board has 65 days to hold' a public hearing) . Upon review of the site plan, staff finds extensive utilization of the site with large building footprints and large areas of pavement. Somewhat small retention/detention areas are shown on the plan despite the extensive lot coverage . Detail review needed of the design. Traffic Impact Report (dated 9/21/88) States the following : Summary of Results Vehicle trips per day 857 AM peak hours ( 7 : 30--8: 30 ) 102 PM peak hours ( 4: 30-5130) 109 Direction of Traffic Southbound 66% Northbound 33% AM level of service (Rte 114 driveway) Southbound Rte 114 "B" Lett turns onto Rte 114 "D" Right turns onto Rte 114 "A" PM Level of service (Rte 114 Driveway) All Rte 114 traffic Left turns onto Rte 114 "D" Right turns onto Rte 114 "A" Summary of Impact AM peak No change level of service PM peak "A" to "B" Staff will closely review this project with the State under the MEPA process . Siting and the design of the driveway to Route 114 is critical to the adequate access to this development. Location of other exisiting curb-cuts, roads and property lines are very important to ensure continued traffic access to this site . Truck access to the buildings is questionable due to tight turning movements and narrow drives . Drainage is sheet flow directed towards the wetlands with minimum sized settling ponds . J ) Issues to be Resolved Information Needed 1 . Parking standards are not met. Change in parking standards for manufacturing, 1 per 500 sq. ft. , 265 spaces shown, spaces needed. Estimation of parking standards is difficult due to the speculative nature of the structures. 2 : Location and distances to driveways/roadways on Route 114 . Need to show property lines across from the site on Route 114 . Current stripping of the roadway needs to be shown. 3 . Discuss the need to signalize Route 114 and Berry Street due to increased traffic loads. ( i . e. nursing home , 142 beds, Girl Scouts expansion, this project, possible conversion of the riding academy to residential use, possible 132 units, land opposite ;Elm Square Industrial, 100+ units) . 4. Design of the drainage system. Small retention/detention ponds. No channeling of water by pipe and catch basins, etc . 5 . Setbacks required by Footprint #3 ) Between industrial and residential zones 100 ' /50 ' ) not provided especially adjacent to Elm Square Builders lot. 6 . N A C C concerns with wetland impacts a) no buffer area between wetlands and. construction b) location of the bordering vegetating wetland c) driveway crossing from building #2 to #3 d) drainage impacts due to sheet drainage towards the wetlands 7 . Need to show the location of the entrances to the buildings. Design of the loading docks . 8. Need turning movements of trucks studied on site . Problems with access to the docks/loading areas. 9 . Blind corners created by building sitings and driveway location. 10. Need to relocate handicapped spaces closer to the structure on building #3. Spaces need to be designed in accordance with the Bylaw. 11 . Placement of the no--cut line to preserve existing trees . No clearing or curbing of understory vegetation is allowed. 12 . Problems with septic design they might not be in accordance with Title V requirements. 13. Show location of stream bank existing and proposed on Lot 2 along its entire route . 14 . Sewer agreements for possible service once the line is extended. 15 . No on-site lighting shall be directed towards Route 114 or adjacent residential areas. 16 . Circulation of the driveway to Berry Street need to be improved. Numerous traffic conflicts due to multiple turning movements within close proximity to the street. 17 . Location and screening of the dumpsters needs to be improved. 18. Drainage from the roof? - No roof drains . = '����' 19 . Need to clearly show existing and proposed landscaping materials . 20. Proof that Section 8 . 4 (Landscaping Parking Lots ) is met by this application. 21 . Parallel parking spaces are not practical as shown. 22 . Adequacy of water service - not showing a looped system through this site ( from Berry Street to Route 114 ) . 23 . Adequacy of ground area around existing trees to be saved. 24 . Need a 3 ' high solid landscaped screen of all parking areas from Berry Street and Route 114 . 25 . Coordination with the State under MEPA. Staff requests a joint filing and review. 26 . Provide zoning information table for the projects total buildout for both lots. 27 . Provide a revised traffic impact report which states the result of building #1 and #2 utilizing access to Berry Street only. Include figures for a total maximum buildout of the land along the Route 114 corridor from Wallow Street to Sharpners Pond Road utilizing existing zoning. 28. Need to determine if a dry sewer will be installed on this site for eventual connection to the Route 114 line . 29. Expanded hydrology study of the entire drainage basin - might be required by B. P . W. 30. Provide landscape materials along the base of the structure . 31 . All signs to obtain a building permit from the Building Inspector. 32 . Detention ponds will be designed to allow standing water on a continuous basis. NACC problems with this design? 33. Please supply a set of proposed building plans. 34 . Provide an additional elevation of the building from a side view. \k y FORTH T #O`� LEo S6 yb•r BOARDOL BORD OF HEALTH 1LJ .i.T H 120 MAIN STREET q co<«•c«n.m« NORTH ANDOVER, MASS. 01845 TEL. 682-6400 US PLANNING ,. �.. tier (� i � �•` �� �; f Y ' i i• { I, PLANNING BOARD • NOVEMBER 17 , 198$ Re : Riparian office park I have reviewed the preliminary septic system plan for this project and have :.several comments , I have already given my suggestions to the engineer who is incorporating them into a final plan, most of the modifications are simple design changes which are not prohibitive . There are two issues which are not as simple . The proposal has septic systems for three buildings on two lots discharging to 3 leachfields on lot 1 . The engineer and the DEQE officials I contacted in Worburn so far assure me this is legal as perpetual easements are established to permit access for future repairs, but I will check with the Boston DEQE office before any final approval. The other issue that concerns me most is controlling the sewage flows of potential occupants of the buildings . The current plan is designed for minimum water uses, like a machine shop or travel agent. In the past I have seen buildings like this designed for minimum sewage flows that were leased to health clubs and restaurants which produce much more effluent. I would recommend that each unit and it ' s proposed user be reviewed by the build- ing and health departments prior to receiving occupancy permits . f G Michael D. -af N. Andover Health Inspector . sir.'• •..'. O J ', OFFICES OF: o Town of 120 Main Slreel APPEALS NORTH ANDOV ER ndover North A i f Y BUILDING }1 "•:i,e"114 Massachusetts 0I845 CONSERVATION 88ACH BC[ DIVISION O (508)082-6483 HEALTH PLANNING PLANNING & COMMUNITY DEVELOPMENT KAREN H.P. NELSON, DIRECTOR December 14, 1988 Riparian Realty Trust 24 Could Street Reading, MA 01867 D.E.Q.E. File Vs 242-478 & 242--479 Gentlemen: Re: Lot 1 Berry, Lot 2 Salem Turnpike The North Andover Conservation Commission has carefully reviewed all submissions under the above-referenced files and has the following con- cerns about the proposed development: 1. The following wetland resource areas are affected by the proposed work: bank, land under water, land subject to flooding (bordering and isolated) , and bordering vegetated wetland. These resource areas are significant to the interests of the Act and Town Bylaw. These resource areas are also significant to the recreation interests of the Bylaw. The applicant has not attempted to overcome the presumption of significance of these resource areas to the identified interests. 2. The wetland resource boundary is stillin dispute. The developer has appealed the NACC's positive determination based on the delineation and extent of bordering vegetated wetland and bordering land subject to flooding. Although the NACC's delineation of the bordering vegetated wetland appears to have been used in the Notices of Intent, the bordering land subject to flooding boundary has not been resolved. The NACC contends that a much greater portion of the site consists of bordering land subject to flooding under the Wetlands' Protection Act. The applicant contends that this land is not "bordering" land subject to flodding. If so, most of the site is still clearly a resource area (land subject to "storm flowage, or flooding, or inundation by groundwater or surface water") under the Town of North Anodover Wetlands Bylaw and must be so delineated. 3. The NACC finds that use of the wetland resource areas on site . for detention of storm runoff to be inconsistent with the performance standards for protecting these wetlands. The discharge of storm runoff from the developed portions of the site will directly dump loads of pollutants (e.g. , oil, gasoline, salt, nutrients, and bacteria) and sediments to the Page -2- Lot 1 Berry, Lot 2 Salem Turnpike wetland resource areas with only minimal screening at the catchbasins and swales. Furthermore, the increase in water level caused by increased runoff will affect the hydrologic regime of the wetlands. This alteration of wetland resource areas would put the project outside of the performance standards of the regulations. Accordingly, the projects' drainage system will be re-designed to control storm runoff through one of the following two alternatives: a. the use of detention or retention ponds constructed outside of the wetland resource areas on the site (both Lots 1 and 2) , with all the storm drainage directed to these ponds. This alternative would eliminate the need for some of the wetland replacement areas proposed by the applicant. b. the use of sedimentation ponds to receive the storm runoff from all point discharges from the drainage system to act as filters for this runoff, and the use of the wetland resurce areas only for the purpose of flood storage for the extra site runoff. This alter- native will require the control structures at the out- lets of the wetland resource areas to be identical in their rating curve to the existing natural control structures, and shall result in increased elevations within the wetland resource areas for only infrequent or rare storm events. All runoff From roof drains and parking lots shall be routed through these detention and retention areas. The NACC will re- quire MDC grease and oil traps or their equivalent. 4. As proposed, the combined total of bordering vegetated wetland to be altered on both sites is approximately 5100 square feet. The NACC finds that this figure can be reduced significantly by re- designing the detention ponds as described above, and by elimina- ting the wetland crossing on Lot 2. 5. The wetland crossing on Lot 2 shall be eliminated. The applicant has not submitted this crossing as a limited project, and the NACC finds that the crossing requires. unnecessary filling of wetlands. 6. Extensive work, is proposed in the buffer zone; this project has been shoe-horned onto a site extremely limited by the amount of wetland. Accordingly, the NACC will imposen25-foot no construction zone around the bordering vegetated wetland in which no work will be permitted; this will ensure that the wetlands are not impacted during construction. F ) Page -3- Lot 1 BeKEY and Lot 2 Salem Turnpike 7. As proposed, the wetlands replication plan is unacceptable. The replacement �greas, as sited, have the potential for adversely affecting significant areas of existing wetland. The amount of wetland replication needed should decrease when the project is redesigned; any replication then necessary should be discussed with the conservation admin- istrator before final plans are drawn. 8. The applicant has given the NACC an extension until June 7th 1989, to issue an Order of Conditions under File Vs 242-478 and 242-479. It is the NACC's understanding that the projects will be withdrawn before that time. If not, denials based upon the concerns raised in this letter will be issued. Any revised plans submitted to the NACC will be reviewed on an informal basis, but will not be formally accepted under either File # 242-478 or 242-479. If the applicant can meet the concerns expressed by the NACC and other town boards, a new Notice of Intent will be submitted, a new public hearing will be held and the current proposals will be with- drawn. Sincerely, NORTH ANDOVER CONSERVATION COMMISSION Lois Bruinooge Member C: Scott Stocking LB/m1b r� a� ,anT"ah v < OFFICES OR TOWill Of r 120 Maim Street APPEALS - North Andover BUILDING ��`°�• ,sue j yNORTH ANDOVER k Massachusetts 01845 CONSERVO IoN SSAC DMSION OF 008)6806483 H HAwrH PLANNING PLANNING & COMMUNITY°'i' DEVELOPMENT KAlit3N FLI', NELSON, DIRECTOR OR MEMORANDUM TO s Planning Board FROM: D. Robert Nicett VU01W3.:1 g inspector DATA December 15 , 19s8 RE : Parking Requirements - Riparian Realty 'Trust - ,Site Plan I have reviewed the relevant sections of the Zoning Bylaw related to perking and the above cited project as requested by the Board. Tease be advised that I have made the following determinations in this matter as the Towns Zoning Enforcement Officer: 1 . Section 8. 1 ( 2 ) "Where a use is not indicated prior to construction or issuance of Building Permit, the number of harking spaces provided shall be the maximum required. " Since the actual occupants of the buildings are not known at this time , I will apply the highest standards :for parking for the allowed uses under the 1-1 Zoning lllstrict. 2 . Section 4 . 131 ( 3 ) states that retail and food uses shall be permitted up to 10% of the gross floor area (GFA) of the principal use . As a practical matter enforcement: of this provision of the ordinance is very difficult as I have experienced with the commercial building located at 1060 Osgood Street. Accessory uses tend to become primary uses utilized by the entire community and not :just the employees who use the building . '.T'herefore, l will use the standards for restaurants for 10`u of the total gross floor area (GFA) of all the structures . 3. 1 will utilize the floor plans submitted for the buildings to calculate the remaining parking standards related to office and industrial uses . If I can be of any further assistance to be Board please let me know. raa yaanry-0ti0 ��. OFFICES OF: Town of 120 Main Street APPEALS * North Andover k i BUELC)INC� ��'"•ereti:;",i� Mt1Ss[]c I1u etls 0I845 CONSERVNI'ION ss"°"`be{ DIVISION01 (508)682-6483 HEALTH PLANN[NO PLANNING & COMMUNITY DEVELOPMENT TO: Planning Board FROM#. Robert Nicetta , Building Inspector DATE: January 31 , 1989 Re : RIPARIAN REALTY TRUST SITE PLAN In the Handicapped Access By-Law for Group B, Commercial Buildings , the requirements are as follows : 1) handicapped access to all doors at ground level; 2) vertical access to the second floor; 3) handicapped rest room facilities on both levels . If the construction of the commercial bt,ulding is to be modular, the same will apply to each individual unit . DRN:gb cc : Dir . , DPCD } NORTH y P RE ARTMENT CENTRAL FIRE HEADQUARTERS .°aaoo. ,Pva 124 Main Street A'TGo P 'C Ow S North Andover,-Mass. 01845 VVILLIAM V. DOLAN Chief of Department I. (508) 686-3612 q, I To: Scott Stocking, Town Planner From: Fire Chief Dolan i. 1) Re: Riparian - Berry Street Date: February 1 , 1989 On Friday, January 27 , Lt. Melnikas and Z met with the developers of the Riparian Industrial Park. The following issues were dis- cussed and resolved to the satisfaction of the Fire Department: 1 . Hydrants - There will be four hydrants installed within the park, one to the rear (Berry St. side) of building 1 , one at the Berry Street entrance, one on the building 2 side of the connection to building 4 and one to the rear of building 4 on the first island formed by the parking lot. 2 . The gate to be installed at Berry Street to limit access is acceptable to the Fire Department as is stated in item 8 of General Conditions of the plans dated 1/23/89 . No locking device shall be installed on this gate without Fire Department notification and approval . 3 . All building numbers and occupant names shall be clearly visible from internal streets by the proposed signage. 4 . Occupancies or change of occupancies must file for permits with the Building Inspector and Fire Department for review of their units . 5 . All fire detection and suppression systems must have plans sub- mitted to the Fire Department for approval prior to installation and all buildings must be connected to the digital alarm receiver at the fire station. "SMOKE DETECTORS SAVE LIVES'! i 2 . 6. Access to the rear of building 4 will not be 360° but an extension of the road surface on the south side of the building from the parking lot past the corner will provide adequate access . This lane shall be a minimum of twelve feet wade. 7 . the access requirements of each building shall be in compliance with 527 CMR 25 as follows : Building 1 - 3600 Building 2 - as shown on plan Building 3 - building to be moved southerly and three sided access provided Building 4 - access will be added on the south side past the corner and the lane provided will be at least 12 feet wide Wi liam V. Dolan, Fire Ghief cc: Bill Bergeron, Hayes Engineering P rsonrrr 1 OFFICES OF: o °°M Town of I fir)Mairf Sheet RAPPEALs + osec� No rl]1 A (IoverNORrH ANDOVER BUILDING NIF -S x'hLISr,ItS 0I 845 CONSERVATION DIVISION Of (508)682.648:3 HEALTH PLANNING PLANNING & COMMUNITY DEVELOPMENT KAREN I-i.i'. NELSON, DIRECTOR HE11011ANDUif T0: Planning Board FROM: Scott A. Stocking,'_W�lanner DATE: February 2 , 1989 REi Riparian Realty Trust Site Plan l have spoken with Lois Bruinooge , a Hoard member of the NACC regarding the above cited topic today and she had the following update for the Board: 1 . The driveway crossing is okay so long as less than 5 ,000 sq. ft. of wetland is altered by the entire project. 2 . The NACC contests the wetland boundary shown on the elan and the boundary dispute is before UEQE . DEQE will be at the site on February 10 , 1989 , to begin their determination . 3 . The NACC will request a 10 ' no-cut and 25 ' no construction buffer adjacent to the wetlands . 4 . The applicant will need to refile with NACC under a new Notice of :Intent . / ale CC : NACC 1 40RT" q 6 ybh4�4 BOARD o F HEALTH � : - * 12o MAIN STREET * 4 # TEL: 682-6483 saCNl7S� NORTH ANDOVER, MASS, 01845 Ext, 32 or 33 TOi The Planning Board FROMa Mike Graf, Health Inset REi Riparian Park DATEt November 30, 1989 I have been reviewing the plants for this proposed project and have several comments. The septic system plan meets the bare minimum requirements of Title 5. What this means is that building use must be restricted to the lowest possible wastewater producers, travel agents and shoe stores for example, and only one work shift per day. Industries or businesses that produce more wastewater than would be generated by the routine sanitary needs of it' s employees (and not customers) during ,an eight hour period must be excluded. In ten years of experience as a health inspector, I have seen a common pattern of problems with predicting and controlling water consumption at industrial parks that are on septic systems: the septic system is designed for the Xqw %_ possible water uses, the design is approved, the building is constructed and then rented out to a variety of high wastewater producers like health clubs, restaurants, beauty parlors, and the like. I have also seen buildings designed for single shift use that went to multiple shifts and over flowed their systems with in a year. What makes the control of water use for this project so important is that besides being designed for minimum sewage flows, the three leach areas that serve all four buildings are close together in the only area on the whole lot that is suitable for sewage disposal with almost no room left for additional leaching capacity if and overflow ever occurs. I do not know what means the Planning Hoard has to insure that we can guarantee a chance to review every potential occupants plan of operation before they rent a unit but unless we have control of what uses are permitted I feel that there will be a serious problem at this site. I also do not feel the septic systems out here can be safely regarded as temporary until sewers are constructed. At the rate building is going on in the industrial zones along Rt 114, the land will be used up by industrial parks on septic systems before sewers are ever constructed this far toward Middleton.