HomeMy WebLinkAbout1989-12-04 Traffic Impact Study SPR 1
}
E nima
HAYES ENGINEERING, INC.
603 SALEM STREET
WAKEFIELD, MA 01880
(617) 246-2800 REFER TO FILE # NOA-0035
FAX # 246-7596
September 27 , 1988
Secretary of Environmental Affairs
100 Cambridge Street - 20th Floor
Boston, MA 02202
Attn: MEPA Unit
RE: Riparian Industrial Park, North Andover , MA
Dear sir :
As per the requirements of the Town of North Andover Zoning By Law,
Section 8. 34, 4, 18; as follows:
18. TRAFFIC IMPACT STUDY
Identification of existing traffic levels , along with the
expected traffic impacts to occur based upon the proposed
project. Projects which access state highways, a traffic
impact study shall be filed with MEPA concurrently with the
Planning Board review. A copy of the MEPA study shall be
filed with the application to the Planning Board.
Therefore, we are supplying your office with a copy of the following
report for your use.
Traffic Study; Riparian Industrial Park; North Andover, MA;
dated September 1988; by Hayes Engineering, Inc.
Very truly yours,
William R. Bergeron, E.
Project Engineer
WRB/dab
Enclosures
r
1985 HCM - CHAPTER 10 : UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:11-12-1988 TIME:13:15:40
RIPARIAN INDUSTRIAL PARK - PROPOSED A.M. RTE. 114 AT SITE DRIVE
LAST DATASETS LOADED OR SAVED
VOLUME=ridnoa GEOMETRICS=ridnoag
KEY: A- -D
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: YIELD
PREVAILING SPEED: 50 MPH
MAIN STREET N OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: Y
MINOR STREET LANES
APPROACH: C: SITE DRIVE
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: YES
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 8: Rte 114 C: SITE DRIVE
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 8: Rte 114 C: SITE DRIVE
LT TN RT LT TH RT LT TH RT
VOLUME 0 1035 42 42 0 0 10 0 10
PHF 1.00 1.00 1.00
ADJ VOLUME 0 1035 42 42 0 0 10 0 10
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 45 11 0 11
STEP 1 RIGHT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 1035
CRITICAL GAPS 4.4
CAPACITY 533
ACTUAL CAPACITY 533
STEP 2 LEFT TURNS FROM H:Rte 114
CONFLICTING FLOWS 1035
CRITICAL GAPS 5.4
CAPACITY 349
CAPACITY USED 13%
IMPEDANCE FACTOR 0.91
ACTUAL CAPACITY 349
ii
I
1985 NCM CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:11-12-1988 TIME:13:15:40
RIPARIAN INDUSTRIAL PARK - PROPOSED P.M. RTE. 114 AT SITE DRIVE
STEP 3 LEFT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 1098
CRITICAL GAPS 7.7
CAPACITY 134
ACTUAL CAPACITY 122
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM 9: 46 349 303 a 11.88 0.15
LT FROM C: 11 122 111 D 32.34 0.42
RT FROM C: 11 533 522 A 5.90 0.02
1985 HCM - CHAPTER 10 UNSIGNALiZED - 3 APPROACHES (PAGE 1 of 2)
DATE:11-12-1988 TIME:13:13:10
RIPARIAN INDUSTRIAL PARK - PROPOSED P.M. RTE. 114 AT SITE DRIVE
LAST DATASETS LOADED OR SAVED
VOLUME=rsdnoa GEOMETRICS=ridnoag
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: YIELD
PREVAILING SPEED: 50 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: Y
MINOR STREET LANES
APPROACH: C: SITE DRIVE
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: YES
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: SITE DRIVE
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: SITE DRIVE
LT TH RT LT TH RT LT TH RT
VOLUME 0 881 11 11 0 0 50 0 50
PHF 1.00 1.00 1.00
ADJ VOLUME 0 881 11 11 0 0 50 0 50
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 12 55 0 55
STEP 1 RIGHT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 881
CRITICAL GAPS 4.4
CAPACITY 615
ACTUAL CAPACITY 615
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 881
CRITICAL GAPS 5.4
CAPACITY 416
CAPACITY USED 3%
IMPEDANCE FACTOR 0.99
ACTUAL CAPACITY 416
}
1985 RCM - CHAPTER 10 UNSIGNALIZED 3 APPROACHES (PAGE 2 of 2)
DATE:11-12-1988 TIME:13:13:10
RIPARIAN INDUSTRIAL PARK - PROPOSED P.M. RTE. 114 AT SITE DRIVE
STEP 3 LEFT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 898
CRITICAL GAPS 7.7
CAPACITY 185
ACTUAL CAPACITY 183
SUMMARY OF LEVEL OF SERVICE RY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM 6: 12 416 404 A 8.91 0.03
LT FROM C: 55 183 128 D 28.19 0.09
RT FROM C: 55 615 560 A 6.43 0.10
1
F
1985 HCM - CHAPTER 10 UNSIGNALI2ED - 3 APPROACHES (PAGE 1 of 2)
DATE-11-12-1988 TIME:13:26:1E3
RIPARIAN INDUSTRIAL PARK -PROPOSED A.M. IMPACT AT BERRY ST. AND RTE. 114
LAST DATASETS LOADED OR SAVED
VOLUME=ridnoa GEOMETRICS=ridnoag
KEY: A- -B
I
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000. NO
CONTROLS: FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 50 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: BERRY STREET
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: YES
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: BERRY STREE
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: BERRY STREE
LT TH RT LT TH RT LT TH RT
VOLUME 0 1045 2 46 0 0 0 0 47
PHF 1.00 1.00 1.00
AD,I VOLUME 0 1045 2 46 0 0 0 0 47
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 51 0 0 52
STEP 1 RIGHT TURNS FROM C:BERRY STREET
CONFLICTING FLOWS 1046
CRITICAL GAPS 4.8
CAPACITY 443
ACTUAL CAPACITY 443
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 1047
CRITICAL GAPS 5.4
CAPACITY 344
CAPACITY USED 15%
IMPEDANCE FACTOR 0.90
ACTUAL CAPACITY 344
1
J
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:11-12-1988 7IME:13:25:i3
RIPARIAN INDUSTRIAL PARK -PROPOSED A.M. IMPACT AT BERRY ST. AND RTE. 114
STEP 3 LEFT TURNS FROM C:BERRY STREET
CONFLICTING FLOWS 1092
CRITICAL GAPS 7.7
CAPACITY 135
ACTUAL CAPACITY 122
SUMMARY OF LEVEL Of SERVICE BY 14OVEMEHT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B. 51 344 294 C 12.25 0.17
RT FROM C: 52 443 391 B 9.21 0.00
j
i
1985 HCM - CHAPTER 10 : UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:11-12-1988 TIME:13:28:29
RIPARIAN INDUSTRIAL PARK - PROPOSED P.M. IMPACT AT BERRY ST. AND RTE. 114
LAST OATASETS LOADED OR SAVED
VOLUME=ridnoa GEOMETRICS=ridnoag
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 50 MPH
MAIN STREET # of LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: BERRY STREET
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: YES
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 S: Rte 114 C. BERRY STREE
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS
0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: BERRY $TREE
LT TH RT LT TH RT LT TH RT
VOLUME 0 931 9 37 0 0 2 0 60
PRF 1.00 1.00 1.00
ADJ VOLUME 0 931 9 37 0 0 2 0 60
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 41 2 0 66
STEP 1 RIGHT TURNS FROM C:BERRY STREET
CONFLICTING FLOWS 936
CRITICAL GAPS 4.8
CAPACITY 495
ACTUAL CAPACITY 495
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 940 -
CRITICAL GAPS 5.4
CAPACITY 389
CAPACITY USED 10%
IMPEDANCE FACTOR 0.94
ACTUAL CAPACITY 389
1
1985 HCM CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:11-12-1988 TIME:13:28:29
RIPARIAN INDUSTRIAL PARK - PROPOSED P.M. IMPACT AT BERRY ST. AND RTE. 114
STEP 3 LEFT TURNS FROM C:BERRY STREET
CONFLICTING FLOWS 973
CRITICAL GAPS 7.7
CAPACITY 164
ACTUAL CAPACITY 153
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 41 389 348 B 10.34 0.12
LT FROM C: 2 153 151 D 23.80 0.27
RT FROM C; 66 495 429 A 8.39 0.01
i
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:11-12-1988 TIME:13:45:45
RIPARIAN INDUSTRIAL PARK - ALT. (NO CONNECTOR RD.) PROPOSED A.M. AT BERRY ST. AN
D RTE. 114
LAST DATASETS LOADED OR SAVED
VOLUME=ridnoa GEOMETRICS=ridnoag
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 50 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: BERRY STREET
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: YES
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: BERRY STREE
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: BERRY STREE
LT TH RT LT TH RT LT TH RT
VOLUME 0 1043 28 54 0 0 6 0 49
PHF 1.00 1.00 1.00
ADJ VOLUME 0 1043 28 54 0 0 6 0 49
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 59 7 0 54
STEP 1 RIGHT TURNS FROM C:BERRY STREET
CONFLICTING FLOWS 1057
CRITICAL GAPS 4.8
CAPACITY 438
ACTUAL CAPACITY 438
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 1071
CRITICAL GAPS 5.4
CAPACITY 335
CAPACITY USED 18%
IMPEDANCE FACTOR 0.88
ACTUAL CAPACITY 335
1
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:11-12-1988 TIME:13:45:45
RIPARIAN INDUSTRIAL PARK - ALT. (NO CONNECTOR RD.) PROPOSED A.M. AT BE
ST. AN
D RTE. 114
STEP 3 LEFT TURNS FROM C:BERRY STREET
CONFLICTING FLOWS 1111
CRITICAL GAPS 7.7
CAPACITY 131
ACTUAL CAPACITY 115
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 59 335 276 C 13.06 0.22
LT FROM C: 7 115 108 0 33.20 0.55
RT FROM C: 54 438 384 B 9.38 0.02
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:11-12-1988 TIME:13:43:15
RIPARIAN INDUSTRIAL PARK - ALT. (NO CONNECTOR RD.)PROPOSED P.M. AT BERRY ST. AND
RTE. 114
LAST DATASETS LOADED OR SAVED
VOLUME=ridnoa GEOMETRICS=ridnoag
KEY: A- -B
I
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 50 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: BERRY STREET
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: YES
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: BERRY STREE
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: BERRY STREE
LT TH RT LT TH RT LT TH RT
VOLUME 0 911 7 38 0 0 26 0 55
PHF 1.00 1.00 1.00
ADJ VOLUME 0 911 7 38 0 0 26 0 55
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 42 29 0 61
STEP 1 RIGHT TURNS FROM C:BERRY STREET
CONFLICTING FLOWS 915
CRITICAL GAPS 4.8
CAPACITY 506
ACTUAL CAPACITY 506
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 918
CRITICAL GAPS 5.4
CAPACITY 399
CAPACITY USED 10%
IMPEDANCE FACTOR 0.94
ACTUAL CAPACITY 349
r
1
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:11-12-1988 TIME:13:43:15
RIPARIAN INDUSTRIAL PARK ALT. (NO CONNECTOR RD.)PROPDSED P.M. AT BERRY ST. AND
RTE. 114
STEP 3 LEFT TURNS FROM C:BERRY STREET
CONFLICTING FLOWS 953
CRITICAL GAPS 7.7
CAPACITY 169
ACTUAL CAPACITY 158
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVE14ENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 42 399 357 B 1G.OB 0.12
LT FROM C: 29 158 130 D 27.72 0.32
RT FROM C: 61 506 445 A 8.08 0.06
f
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE: 11-14-1988 TTME: 09:42 :08
RIPARIAN INDUSTRIAL PARK _ ALT. (NO CONNECTOR RD. ) PROPOSED A.M. AT SITE DRIVE AN
D RTE. 114
LAST DATASETS LOADED OR SAVED
VOLUME=RIDNOA GEOMETRICS=RIDNOAG
KEY: A-- -B
j
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250, 000: NO
CONTROLS : FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 50 MPH
MAIN STREET # OF LANES : 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: Y
MINOR STREET LANES
APPROACH: C: SITE DRIVE
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: YES
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: OSITOE DRIVE
LEFTS 0 . 00 0.00
THRUS 0 . 00 0. 00 0 . 00
RIGHTS
0. 00 0.00 0. 00
APPROACH A: Rte 114 B: Rte 114 C: SITE DRIVE
LT TH RT LT TH RT LT To RT
8
VOLUME 0 1061 17 33 0 0 4
PHF 1. 00 1.00 1. 00
ADJ VOLUME 0 1061 17 33 0 0 4 0 8
PERCENT GRADE 0 . 00 0.00 0. 00
PASS CAR/HR 0 36 4 0 9
STEP 1 RIGHT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 061
CRITICAL GAPS 5. 3
353
CAPACITY 353
ACTUAL CAPACITY
STEP 2 LEFT TURNS FROM B:Rte 114 1061
CONFLICTING FLOWS 5. 4
CRITICAL GAPS 339
CAPACITY 110
CAPACITY USED 0.93
IMPEDANCE FACTOR 339
ACTUAL CAPACITY
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE: 11-14-1988 TIME: 09:42 : 08
RIPARIAN INDUSTRIAL PARK - ALT. (NO CONNECTOR RD. ) PROPOSED A.M. AT SITE DRIVE AN
D RTE. 114
STEP 3 LEFT TURNS FROM C:SITE DRIVE1103
CONFLICTING FLOWS 103
CRITICAL GAPS
7 . 7
CAPACITY 1 133
3
ACTUAL CAPACITY
24
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVGOQUEUE
LT FROM B% 36 339 303 B 11. 90
. 12
4 124 120 D 30. 10 0. 30
LT FROM C:
RT FROM C: 9 353 344 B 10. 45 0 . 01
}
i
1985 HCM - CHAPTER 10 UNSIGNALIZED43.29APPROACHES (PAGE 1 of 2)
DATE: 11-14-1988 TIME: 09.
RIPARIAN INDUSTRIAL PARK - ALT. (NO CONNECTOR RD. ) PROPOSED A.M. AT SITE DRIVE AN
D RTE. 11.4
LAST DATASETS LOADED OR SAVED
VOLUME=RIDNOA GEOMETRICS=RIDNOAG
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250, 000: NO
CONTROLS : FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 50 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: Y
MINOR STREET LANES
APPROACH: C: SITE DRIVE
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: YES
SIGHT DISTANCE RESTRICTIONS (in seconds) SITE
APPROACH A: Rte 114 B: Rte 114 C. 0 . 00 DRIVE
LEFTS 0 . 00 0. 00
THRUS 0. 00 0. 00 0. 00
RIGHTS
0. 00 0. 00 0. 00
APPROACH A: T RT
Rte 114 B: Rte T RT LT TH
114 C SITE DRIVE
LT RT
VOLUME 0 888 6 8 0 0 16 0 30
PHF 1. 00 1. 00 1. 00
ADJ VOLUME 0 888 6 8 0 0 10.00 0 30
PERCENT GRADE 0. 00 0 . 00
PASS CAR/HR 0 9 18 0 33
STEP 1 RIGHT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS
CRITICAL GAPS 5. 3
CAPACITY 429
ACTUAL CAPACITY 429
STEP 2 LEFT TURNS FROM B:Rte 114 888
CONFLICTING FLOWS 5. 4
CRITICAL GAPS 413
CAPACITY 413
CAPACITY USED 2°
0`9
IMPEDANCE FACTOR
ACTUAL CAPACITY 413
f
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 Of 2)
DATE: 11-14-1988 TIME: 09 : 43 : 29
RIPARIAN INDUSTRIAL PARK - ALT. (NO CONNECTOR RD. ) PROPOSED A.M. AT SITE DRIVE AN
D RTE. 114
STEP 3 LEFT TURNS FROM C: SITE DRIVE
CONFLICTING FLOWS 899
CRITICAL GAPS 7 . 7
CAPACITY 185
ACTUAL CAPACITY 183
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 9 413 404 A 8 . 91 0. 02
LT FROM C• 18 183 165 D 21. 76 0 . 05
RT FROM C: 33 429 396 B 9 . 10 0. 04
' y 1
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE: 11-14-1988 TIME: 09 : 55: 43
RIPARIAN INDUSTRIAL PARK PROPOSED A.M. AT SITE DRIVE ON BERRY STREET.
LAST DATASETS LOADED OR SAVED
VOLUME=RIDNOA GEOMETRICS=RIDNOAG
KEY: A-- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250, 000: NO
CONTROLS: FROM C: STOP
PREVAILING SPEED: 30 MPH
MAIN STREET # OF LANES : 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: SITE DRIVE
SHARED LEFT AND RIGHT TURN LANE: YES
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: BERRY STREE B: BERRY STREE C: SITE DRIVE
LEFTS 0. 00 0. 00 0. 00
THRUS 0. 00 0 . 00 0. 00
RIGHTS 0. 00 0. 00 0. 00
APPROACH A: BERRY STREE B: BERRY STREE C: SITE DRIVE
LT TH RT IT TH RT LT TH RT
VOLUME 0 6 42 0 37 0 10 0 0
PHF 1. 00 1. 00 1. 00
ADJ VOLUME 0 6 42 0 37 0 100. 00 0 0
PERCENT GRADE 0. 00 0• 00 11 0 0
PASS CAR/HR 0 0
STEP 1 RIGHT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 4 . 5
27
CRITICAL GAPS
CAPACITY 1328
28
ACTUAL CAPACITY 1328
STEP 2 LEFT TURNS FROM B:BERRY STREET
CONFLICTING FLOWS 48
CRITICAL GAPS 5. 0 -
CAPACITY 1166
CAPACITY USED 0°
IMPEDANCE FACTOR 1. 00
ACTUAL CAPACITY 1166
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE: 11-14-1988 TIME: 09: 55:43
RIPARIAN INDUSTRIAL PARK PROPOSED A.M. AT SITE DRIVE ON BERRY STREET.
STEP 3 LEFT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 6. 5
64
CRITICAL GAPS 864
CAPACITY 864
ACTUAL CAPACITY 864
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
ALL MOVES FROM C: 11 864 853 A 4 . 22 0. 01
} J I
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 0f 2)
DATE: 11-14--1988 TIME: 09: 57 : 06
RIPARIAN INDUSTRIAL PARK PROPOSED }M. AT SITE DRIVE ON BERRY STREET.
LAST DATASETS LOADED OR SAVED
VOLUME=RIDNOA GEOMETRICS=RIDNOAG
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250, 000: NO
CONTROLS: FROM C: STOP
PREVAILING SPEED: 30 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: SITE DRIVE
SHARED LEFT AND RIGHT TURN LANE: YES
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: BERRY STREE B: BERRY STREE C: SITE DRIVE
LEFTS 0. 00 0. 00 0 . 00
THRUS 0. 00 0. 00 0. 00
RIGHTS 0.00 0. 00 0. 00
APPROACH A: BERRY STREE B: BERRY STREE C: SITE DRIVE
LT TH RT LT TH RT LT TH RT
VOLUME 0 34 12 0 13 0 49 0 0
PHF 1. 00 1. 00 1. 00
ADJ VOLUME 0 34 12 0 13 0 49 0 0
PERCENT GRADE 0. 00 0. 00 0. 00
PASS CAR/HR 0 0 54 0 0
STEP 1 RIGHT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 40
CRITICAL GAPS 4.5
CAPACITY 1312
ACTUAL CAPACITY 1312
STEP 2 LEFT TURNS FROM B:BERRY STREET
CONFLICTING FLOWS 46
CRITICAL GAPS 5. 0
CAPACITY - 1168
CAPACITY USED 0°
IMPEDANCE FACTOR 1.00
ACTUAL CAPACITY 1168
{ kk
I
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE: 11-14-1988 TIME: 09: 57 : 06
RIPARIAN INDUSTRIAL PARK PROPOSED A.M. AT SITE DRIVE ON BERRY STREET.
STEP 3 LEFT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS a3
CRITICAL GAPS 6` 5
CAPACITY 877
ACTUAL CAPACITY 877
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
ALL MOVES FROM C: 54 877 823 A 4 . 37 0. 07
1985 HCM - CHAPTER 10 : UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE: 11-14-1988 TIME: 10: 00:06
RIPARIAN INDUSTRIAL PARK --ALT. (NO CONNECTOR RD) PROPOSED A.M. AT SITE DRIVE AT B
ERRY STREET.
LAST DATASETS LOADED OR SAVED
VOLUME=RIDNOA GEOMETRICS=RIDNOAG
KEY: A- -B
i
c
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250, 000: NO
CONTROLS: FROM C: STOP
PREVAILING SPEED: 30 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A -- EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: SITE DRIVE
SHARED LEFT AND RIGHT TURN LANE: YES
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: BERRY STREE B: BERRY STREE C: SITE DRIVE
LEFTS 0. 00 0 . 00 0 . 00
THRUS 0 . 00 0.00 0. 00
RIGHTS 0.00 0 . 00 0 . 00
APPROACH A: BERRY STREE B: BERRY STREE C: SITE DRIVE
LT TH RT LT TH RT LT TH RT
VOLUME 0 6 76 0 37 0 18 0 0
PHF 1. 00 1. 00 1. 00
ADJ VOLUME 0 6 76 0 37 0 18 0 0
PERCENT GRADE 0. 00 0. 00 0. 00
PASS CAR/HR 0 0 20 0 0
STEP 1 RIGHT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 4 .5
44
CRITICAL GAPS
CAPACITY 1307
07
ACTUAL CAPACITY 1307
STEP 2 LEFT TURNS FROM B:BERRY STREET
CONFLICTING FLOWS 82
CRITICAL GAPS 5. 0
CAPACITY 1125
CAPACITY USED 0°
IMPEDANCE FACTOR 1. 00
ACTUAL CAPACITY 1125
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE` 11-14-1988 TIME: 10: 00: 06
RIPARIAN INDUSTRIAL PARK -ALT. (NO CONNECTOR RD) PROPOSED A.M. AT SITE DRIVE AT B
ERRY STREET.
STEP 3 LEFT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 81
CRITICAL GAPS 6. 5
CAPACITY 844
ACTUAL CAPACITY 844
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(
SEC} AVG QUEUE
ALL MOVES FROM C: 20 844 824 A 4 . 37 0 . 02
t i
1 1
1985 HCM - CHAPTER 10 : UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE: 11-14--1988 TIME: 09 : 52 : 38 F
RIPARIAN INDUSTRIAL PARK --ALT. (NO CONNECTOR RD. ) PROPOSED A.M. AT SITE DRIVE ON
BERRY STREET.
LAST DATASETS LOADED OR SAVED
VOLUME=RIDNOA GEOMETRICS=RIDNOAG
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250, 000: NO
CONTROLS: FROM C: STOP
PREVAILING SPEED: 30 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: SITE DRIVE
SHARED LEFT AND RIGHT TURN LANE: YES
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: BERRY STREE B: BERRY STREE C: SITE DRIVE
LEFTS 0. 00 0. 00 0. 00
THRUS 0. 00 0. 00 0. 00
RIGHTS 0. 00 0. 00 0. 00
APPROACH A: BERRY STREE B: BERRY STREE C: SITE DRIVE
LT TH RT IT TH RT LT TH RT
VOLUME 0 34 20 0 13 0 69 0 0
PHF 1. 00 1. 00 1. 00
ADJ VOLUME 0 34 20 0 13 0 69 0 0
PERCENT GRADE 0 . 00 0 . 00 0. 00
PASS CAR/HR 0 0 76 0 0
STEP 1 RIGHT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 44
CRITICAL GAPS 4 .5
CAPACITY 1307
ACTUAL CAPACITY 1307
STEP 2 LEFT TURNS FROM B: BERRY STREET
CONFLICTING FLOWS 54
CRITICAL GAPS 5. 0
CAPACITY 1158
CAPACITY USED 0%
IMPEDANCE FACTOR 1. 00
ACTUAL CAPACITY 1158
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE: 11-14-1988 TIME: 09 : 52 : 38 P \
RIPARIAN INDUSTRIAL PARK -ALT. (NO CONNECTOR RD. ) PROPOSED K.M. AT SITE DRI, .
BERRY STREET.
STEP 3 LEFT TURNS FROM C:SITE DRIVE
CONFLICTING FLOWS 57
CRITICAL GAPS 6. 5
CAPACITY 872
ACTUAL CAPACITY 872
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
ALL MOVES FROM C: 76 872 796 A 4 . 52 0 . 10
RIPARIAN INDUSTRIAL PARK
NORTH ANDOVER, MA
SUMMARY OF TRAFFIC STUDY
November 15 , 1988
Original Revised Alternate
Use (No Connector)
Vehicle 'Trips Per Day 857 955 955
A.M. Peals Hour (7 : 30-8 : 30) 102 156 156
P . M. Peak Hour (4 : 30--5 : 30) 109 149 149
Direction of Traffic 2/3 from the north
1/3 from the south
A.M. Level of Service
Rte . 114 at Site Drive
Southbound Rte . 114 B B B
Left turn onto Rte . 114 D D D
Right turn onto Rte. 114 A A B
P.M. Level. of Service
Rte. 114 at Site Drive
Southbound Rte. 114 A A A
Left turn onto Rte. 114 D D D
Right turn onto Rte . 114 A A B
Existing Original Revised Alternate
A.M. Level of Service Use (No Connector)
Berry St. & Rte. 114
Southbound Rte. 114 B B C C
Left turn onto Rte . 114 - - - D
Right turn onto Rte . 114 A A B B
P.M. Level of Service
Berry Street & Rte. 114
Southbound Rte. 114 A B B B
Left turn onto Rte . 114 D D D D
Right turn onto Rte. 114 A A A A
1
RIPARIAN INDUSTRIAL PARK
NORTH ANDOVRR, MA
SUMMARY OF TRAFFIC STUDY
November 15 , 1988
Original Revised Alternate
Use (No Connector)
Vehicle Trips Per Day 857 955 955
A.M. Peak Hour (7 :30-8 :30) 102 156 156
P.M. Peak Hour (4 : 30--5 : 30) 109 149 149
Direction of Traffic 2/3 from the north
1/3 from the south
A.M. Level of Service
Rte. 114 at Site Drive
Southbound Rte. 114 B B B
Left turn onto Rte. 114 D D r-2
Right turn onto Rte. 114 A A , A
P.M. Level of Service
Rte. 114 at Site Drive
Southbound Rte . 114 A A A /4
Left turn onto Rte. 114 D D 0
Right turn onto Rte. 114 A A ; lB A
Existing Original Revised Alternate
A.M. Level of Service Use (No Connector)
Berry St. & Rte . 114
Southbound Rte . 114 B B C C
Left turn onto Rte. 114 - - - c
Right turn onto Rte. 114 A A B
P.M. Level of Service
Berry Street & Rte . 114
Southbound Rte . 114 A B B B
Left turn onto Rte. 114 D D D D
Right turn onto Rte. 114 A A A A
owner."
Rip arian Realty Trust
Reading,, Massachusetts
TRAFFIC S TUD Y
R.IPAR..Z-IUDIAN
US TRIAD PARK
North Andover, Massachusetts
Sep t ember 198B
HA YES ENGINEERING, INC.
Cj vj I En_qJneers N L and sup veyors
603 Salem street, Wakefield, mass- 01880
TRAFFIC- STUDY
RIPARIAN INDUSTRIAL PARK
NORTH ANDOVER, MA
September 21, 1988
INTRODUCTION
i.
The purpose of this study is to identify the traffic impacts of the
proposed Riparian Industrial Park , located on the easterly side of
the Salem Turnpike (Route 114) , between the two sections of Berry
Street in North Andover , Massachusetts , as shown on Figure 1. The
existing site consists of approximately 14 . 7+ acres of Industrial 1
District (I-1) zoned land. This report analyzes the impact of the
traffic generated by the proposed construction of approximately
122 , 400 square feet of buildings for industrial park use. The
proposed park will be serviced by a new driveway entrance onto Route
114 , and a new driveway entrance onto Berry Street.
EXISTING TRAFFIC CONDITIONS
There are two proposed Riparian Industrial Park site driveways. The
primary driveway is located on the easterly side of the Salem
Turnpike (Route 114) . The Salem Turnpike runs in approximately a
northwesterly direction through North Andover . This section of the
Salem Turnpike consists of an 80 ' -wide public layout, with
approximately 37 feet of paved surface area. The pavement is marked
with one moving lane in each direction, and a center lane for turning
movements. This section of the road is posted for 45 MPH in both
directions , and carries approximately 18 ,900 vehicles per day,
according to the 1987 traffic count data obtained from . the
Massachusetts Department of Public Works . The alignment to the
southeast is basically straight. The alignment to the north has a
slight curve to the right.
There is a portion of an existing acceleration lane that has been
constructed part-way through the subject property from the existing
Elm Square driveway. The proposed driveway is located approximately
300 feet northeasterly of the existing Elm Square Drive. The
existing site has a graded gravel shoulder and a guardrail for the
majority of the frontage along Route 114 .
The secondary driveway access proposed for the site is on the
southerly sideline of Berry Street, approximately 240 feet
southwesterly of the intersection of Berry Street and Ash Street.
Berry Street is a public , variable-width layout, with approximately
18 to 20 feet of pavement width. The alignment is straight to the
intersection of Ash Street to the northeast from the proposed drive.
The alignment southeasterly of the proposed drive is straight for
approximately 400 feet, and then there is a curve to the right.
Berry Street is lined with stone walls and trees.
40
kQ 9 - r'' ) r I •� �s. fl t
. -0 01 ..;.t t41�J/r rr' ;j;r � ` -; .;•J. O •� .a .u- �.__ ._ ° sue. .:J. o'_
l EST �r p f0
O
ON
-�••`- 4)`'Sr r ._\�\( ��• !~ t �4{'�`�•0' � Q"' �Fi. S-; i { � .`,!.. k~ -. � 11'ju.-'�' .ar-^ -'' i."
0 31 l` O -llJJh�� lll(
`� .,•• •• �J `\l i� �� �/4,,,-w r \''J,e1.��ll\���JJ�»��I }l \�'- �, t Jam. _ r \-..y� 11 - �i �..
,'• �• S �'�J r ' .1 C7Li
� O� ... ��i_ �\F .u._`'- `',�_,�w • ` .".3 J.t '.; _ .,�^'(l �
t frti � �\ �- '__ �J'�r `\� �"�`��. V'- �:• r'j���....y� - ;};.j,,._u,sr.�L �31
119 ' - `i3A" j - 5 �\ •ems
�.. ;���` ` . 1 J t try 3 6, •�� `N
�`�• i6� •5' Sg� o7s O 4 ..� r�-�,. E_ ��\�b�f t� �..�.o[t
f ` r, 4T•1'� ':. � JJpp,;� ��� �9rn`r� o'� `1•:' ��.-C?ILA:\ r S 4
$ T
y , �.::• ,iv' r' — -_5{_: .j!:'^,%.'�
• _ e t' r ��0�f{'y
3�s°'$� \ r- � °1�y,~.u` _�P o•��-c:�$.�.1;).��j,, `I\` � '•�. ' [vo�h•,G°����{�i [.� �1 `'!. f�p �u \
�f� •' al' 01
�
�- �» y be O ':i_ � Uo '_I � r �` � •°'y �fM1�l"` \ J�` _ � f.
Ur
1/6 vi
t NO
lv
-'�-�xr-�,,, a A -,' rip o ,�C?{} ., •t`�e. �t` + s_ �'�Ra.. _i (>`_� `� rl�l.c_.
°,• ° """! � Q a � rah?' a" Ir \t• �����.-�•����! `t - o� �--�' (�° y,.
r•• A U ,, o � � _�`� "'•'''r r3zt:,Y -+.3r t"xy�' « ��`�•��JrQ 7� ��� ."' -
\• - ��� � '� _ `$ � `` 1•�1 P Q' \ .. - � � � ' fir' �� 8'S<i �t;� '
:1='� [� �w� l�'i' �Sy'Ir ,` � �`._ �'' .ii��'� .�-�yoCl� � ` ''�/l� ` ,n ' -�,; •�a -tiiiA.. �a W sr?
r�spar.z an
lndustrlal Park
North Andover, Ma .
Figure
Locus Map
i
Traffic Study
Riparian Industrial Park , North Andover , MA
September 21 , 1988
In order to estimate the impacts of the proposed Riparian Industrial
Park on the existing levels of service, existing peak hour traffic
volumes were taken on September 20 , 1988 at the intersections of
Route 114 and Berry Street, and at the Elm Square site drive.
TRAFFIC GENERATION
Estimated traffic volumes generated by the proposed Riparian
Industrial Park were developed using the technical information
available in "Trip Generation" , by the Institute of Transportation
Engineers , 1976 , with periodic updates. The "Trip Generation" report
provides several trip rates for different types of development. The
potential use of the site is most closely represented by the
Industrial Park category , as described in "Trip Generation" .
"Industrial Parks are areas containing a number of industrial or
related facilities. They are characterized by a mix of
manufacturing, service and warehouse facilities, with a wide
variation in the proportion of each type of use from one location
to another . Many industrial parks contain highly diversified
facilities - some with a large number of small businesses, and
others with one or two dominant industries. "
Therefore, the proposed site use could generate the following range
of average daily trips, as shown in Table I .
TABLE I
ESTIMATE OF TRAFFIC GENERATED BY THE PROPOSED
RIPARIAN INDUSTRIAL PARK
NORTH ANDOVER, MA
Statistical Basis -- I .T.E. Land Use Code 130 - Industrial Park
Gross Building Area - 122 , 400 Square Feet
A.M. Peak Hour in 0 . 71/1, 000 S.F. x 122 , 400 S.F. = 87
out 0. 12/1, 000 S.F. x 122 , 400 S.F. = 15
Sub-total A.M. Peak Hour 102
P.M. Peak Hour - in 0 . 33/1,000 S.F. x 122 , 400 S.F. = 40
out 0. 56/1,000 S.F. x 122 , 400 S.F. = 69
Sub-total P.M. Peak Hour 109
Average Weekday Vehicle Trip Ends -
7 . 0/1 ,000 S.F. x 122 , 400 S.F. = 857
..................
......................
�i
r,
0 0
•� -- rh ch
..
Ln
� 1 -
nt .00
y Mm
� 0
M
CN
(6 ) Z H
(L88) 5£OL (068)
L£OL
F66) (SZ ) fii (OLO
896) £68
L68 £68
V L L aqno-a
PROPOSED
Route 114
c 00
r
M m
O1 M
00
7 E31)
5 (22) Site
Drive
� n j
00
ti
tn 00
CN
a
7:30 - 8:30 A.M.
(4:30 - 5:30 P.M.)
Route 114
FIGURE 3
PROPOSED
To Route 114
Berry Street
i
\/ W
a 1.0
N
Site
Drive
3 (16)
0 { 0)
O M
r
O M
Berry Street
7:30 - 8.30 A.M.
(4:30 - 5.30.P.M.)
r
FIGURE 4
i
Route 114
932 (986)
23 ( 34)
1042 (912)
3 ( 9)
o
W O N
W d1
Ln co
ao
ro �
ct
Traffic Study
Riparian Industrial Park , North Andover , MA
September 21 , 1988
Based upon the factors in the "Trip Generation" report, morning and
evening peak hour traffic was estimated to be 102 and 109 vehicles
respectively. The traffic will be comprised of vehicles entering and
exiting the site with the following approximate directional split.
Thus , in the morning peak hour , a total of 102 vehicles will use the
proposed access driveways. Of this total, it is estimated that 87
would be entering the site, and 15 would be exiting the site. In the
evening peak hour , the total number of vehicles would be 109 , with 40
entering and 69 exiting the new access driveways.
TRAFFIC ASSIGNMENT
Traffic generated by the new development will add directly to the
traffic on the existing street system. In the trip distribution
phase of the traffic analysis, the information obtained from the
field counts, as well as a review of the existing roadway network ,
was used to project the probable future traffic patterns . The
results of the review indicate that approximately 66% of the traffic
would come from the north on Route 114 to the proposed site. The
remaining 33% of the traffic would come from the south on Route 114 .
Based upon the trip generation rates for the proposed project , and
the above directional distribution of traffic flow, the
post-development directional distributions for the proposed
intersection of Route 114 and Berry Street (existing and proposed) ,
the site drive and Route 114 , and the proposed site drive on Berry
Street, are shown on Figures 2 , 3 , 4 and 5 for the A.M. and P.M. peak
hours.
CAPACITY ANALYSIS
The term "capacity" is a function of the prevailing conditions .
These conditions are those that are determined by the physical
features of the roadway, and those that are dependent upon the
traffic using the roadway. The "capacity" may be defined as the
maximum number of vehicles which has a reasonable expectation of
passing over a given section of roadway during a given time period,
under prevailing roadway and traffic conditions .
"Level of service" (LOS) is a term which denotes any of an infinite
number of differing combinations of operating conditions which can
occur on a given lane or roadway, when it is accommodating various
traffic volumes.
Traffic Study
Riparian industrial Park, North Andover , MA
September 21, 1988
Service level A through F, as shown in Table II , define the full
range of driving conditions from the best to the worst in that
order . These levels of service qualitatively measure the affect of
such factors as travel time, speed, cost, and freedom to maneuver ,
which, in combination with other factors , determine the type of
service that any given facility provides to the user under stated
conditions .
Level A represents free flow at low densities, with no restrictions
due to traffic conditions. Level B, the lower limit of which is
often used for the design of rural highways, is the zone of stable
flow with some slight restriction of driver freedom. Level C denotes
the zone of stable flow, with more marked restrictions on the
driver ' s selection of speed.
LEVEL OF SERVICE CRITERIA FOR
CNSIGNALIZED INTERSECTIONS
TABLE II
Level of Expected Delay to
Reserve Capacity Service Minor Street Traffic
4Q0 A Little or no delay
300 _ 399 B Short traffic delays
200 - 299 C Average traffic delays
100 - 199 D Long traffic delays
0 - 99 E Very long traffic delays
0 F Severe Congestion
Source: Highway Capacity Manual , Special Report 209 , Transportation
Research Board (TRB) , National Research Council, 1985.
Traffic Study
Riparian industrial Park, North Andover , MA
September 21, 1988
The conditions of level D reflect little freedom for driver
maneuverability, and, while the operating speeds are still tolerable,
this region approaches the condition of unstable flow. Low operating
speeds and volumes near or at capacity indicate level of service E,
which is the area of unstable flow. Level E is the level of service
provided by the familiar traffic jam, with frequent interruptions and
breakdown of flow, as well as volumes below capacity, coupled with
low operating speeds.
An intersection capacity analysis was performed for the morning and
evening peak hours at the proposed site access drives. The capacity
analysis procedure used was published by the Transportation Research
Board (Special Report 209 , "Highway Capacity Manual" , 1985) . It
involves calculations for unsignalized intersections , with the
results being presented as Levels of Service. Each Level of Service
corresponds to a certain level of traffic congestion, as outlined in
Table II .
The analysis procedure was developed for unsignalized intersections
that are controlled by two-way stop signs, or by yield signs. The
capacity or maximum flow of vehicles in passenger car equivalents is
calculated for each minor approach movement. These values are then
compared to the existing demand for each movement, and the probable
delay and level of service is estimated.
The assumption is made that major street traffic is not affected by
the minor street movements. Left turns from the major street to the
minor street are influenced only by the opposing major street through
flow. Manor street flows, however , are impeded by all other
conflicting movements. The procedure includes adjustments for mutual
interference to the minor street traffic streams, such as the
additional adverse effect of main street vehicles waiting to make
left turns. In addition, the method takes into account the lane
configuration on the minor street, and includes appropriate
adjustments for movements that use the same lane. The calculations
are based upon maximum hourly flows using the intersection at a given
time.
The proposed site access drive on Route 114 would operate at level of
service "B" for the morning turning movements for the southbound
turns from Route 114 into the site . The proposed site access drive
will operate at a level of service "D" for left turns out of the
project site, and at level of service "A" for right turns out of the
project site. The proposed access drive would operate at level of
service "A" for evening turning movements into the site from Route
114 . The proposed site access drive will operate at level of service
"D" for the left turn out of the project site, and at level of
service "A" for the right turn out of the project site.
Traffic Study
Riparian Industrial Park, North Andover , MA
September 21, 1988
The proposed secondary access driveway on Berry Street will operate
at level of service A for all turning movements during the morning
and evening peak hours.
The impact of the proposed traffic on the intersection of Berry
Street and Route 114 will result in no change in the morning peak
hour traffic turning movement levels of service. The evening peak
hour level of service for the left turn into the site from southbound
traffic on Route 114 changes from level of service A to level of
service B. All other levels of service remain the same.
SAFETY ANALYSIS
Stopping Sight Distance considerations are divided into two criteria:
(1) approach SSD, and (2) exiting SSD. Approach SSD is the distance
required for an approaching vehicle to perceive and react accordingly
to a driveway exiting vehicle or object. Stopping sight distances
used for design is the sum of two distances: (1) the distance a
vehicle travels after the driver sees an object and begins breaking,
and (2) the distance it travels during breaking, as calculated for
wet level pavement.
Exiting SSD is based upon a perception and reaction time , and time
required to complete the desired exiting maneuver after the decision
to do so has been made. Values for exiting SSD represent time
required to (1) turn left or right, to accelerate to the operating
speed of the street without causing approaching vehicles to reduce
speed by more than 10 miles per hour ; and, (2) upon turning left, to
clear the near half of the street without conflicting with vehicles
approaching from the left.
Approach SSD is far more important, as it represents the minimum
distance required for safe stopping, while the exiting SSD criteria
is based only upon acceptable speed reductions to the approaching
traffic stream.
The proposed site access roadway will be designed to enter onto Cabot
Street on a relatively straight section of roadway. The placement of
the new access point, after some minor brush removal along the right
of way, will provide good visability for both directions of traffic
flow. The following Table III illustrates the required and available
SSD north and south of the proposed access drive on Cabot Street.
Traffic Study
Riparian Industrial Park, North Andover , MA
September 21, 1988
i
TABLE III
STOPPING SIGHT DISTANCE
Available Required SSD * Required SSD
Approaching for 45 mph for 55 mph
SSD
i
Site Access Drive
on Route 114
Northbound 1, 200 ft.+ 325 - 400 ft. 450 - 550 ft.
Southbound 2 , 500 ft.+ 325 - 400 ft. 450 - 550 ft.
Intersection of
Berry Street & Route 114
Northbound 700 ft.+ 325 -- 400 ft. 450 - 550 ft.
Southbound 1, 200 ft.+ 325 - 400 ft. 450 - 550 ft.
Required SSD * Required SSD
for 30 mph for 40 mph
Site Access Drive
on Berry Street
Westbound 500 ft.+ ** 200 ft. 275 - 325 ft.
Eastbound 275 ft.+ ** 200 ft. 275 - 325 ft.
* Minimum stopping sight distance (wet pavement) from AASHTO
** Sight distances available after required removal of brush and
selected tree cutting and trimming
It is apparent that the design of the new site access drives, and the
existing roadway, will exceed the recommended sight distance
requirements for safe stopping. The access drives will also have
leveling areas and stop signs at the intersections to provide stopping
areas for vehicles leaving the site.
i
Traffic Study
Riparian Industrial Park, North Andover , MA
September 21, 1988
CONCLUSIONS
The proposed development of the Riparian Industrial Park is
anticipated to have the following impacts :
* The proposed traffic into the site will maintain at least a ,
level of service "B" at the new access drive and the existing
Berry Street intersections with Route 114 .
* The proposed two new site access drives , and the existing
Berry Street and Route 114 intersection, all provide safe
stopping sight distances for both directions of traffic flow.
The proposed site access drives will also be proposed to have
stop signs located at the intersections for vehicles leaving
the site .
* The proposed new access drive will experience some degree of
level of service "D" for the minor left turn out of the site
access drive onto Route 114 during the peak hours. The
delays , if experienced, will not impact the flow of traffic on
Route 114 , but will be contained on the subject property. All
other turning movements will operate at level of service "A"
or "B"
* The proposed main access drive on Route 114 will be equipped
with an acceleration and deceleration lane. This work will
require the existing guardrail to be reset to increase the
clearance from the existing pavement edge. This proposed work
should allow for safe and convenient use of the primary
access, with little disruption to the existing traffic flow on
Route 114 .
1985 HCM - CHAPTER 10 : UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:09-21-1988 TIME:14:04:20
Riparian Industrial Park - EXISTING A.M.
LAST DATASETS LOADED OR SAVED
VOLUME=ridvol GEOMETRICS=ridg
KEY: A- --B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 45 MPH
MAIN STREET # OF LANES: 2 LANES `
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: Berry Street
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: YES
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: Berry Stree
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: Berry Stree
LT TH RT IT TH RT LT TH RT
VOLUME 0 1035 2 4 0 0 0 0 37
PHF 1.00 1.00 1.00
ADJ VOLUME 0 1035 2 4 0 0 0 0 37
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 4 0 0 41
STEP 1 RIGHT TURNS FROM C:Berry Street
CONFLICTING FLOWS 1036
CRITICAL GAPS 4.6
CAPACITY 4$8
ACTUAL CAPACITY 4$8
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 1037
CRITICAL GAPS 5.3
CAPACITY 363
CAPACITY USED 1�
IMPEDANCE FACTOR 1.00
ACTUAL CAPACITY 363
1985 HCM - CHAPTER 10 UNSIGNALIZED - .3 APPROACHES (PAGE 2 of 2)
DATE:09-21-1988 TIME:14 :04:20
Riparian industrial. Park
STEP 3 LEFT TURNS FROM C:Berry Street
CONFLICTING FLOWS 1040
CRITICAL GAPS 7.4
CAPACITY 163
ACTUAL CAPACITY 163
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 4 363 356 B 10. 05 0.01
RT FROM C: 41 488 447 A 8.06 0.00
II
1985 HCM - CHAPTER 10 UNSIGNALYZED - 3 APPROACHES (PAGE 1 of 2)
DATE:09-21--1988 TIME:14:05:1.5
Riparian Industrial Park - EXISTING P.M.
LAST DATASETS LOADED OR SAVED
VOLUME=ridvol GEOMETRICS=ridg
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250F000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 45 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: Berry Street
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: YES
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: Berry Stree
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: Berry Stree
LT TH RT IT TH RT LT TH RT
VOLUME 0 881 9 25 0 0 2 0 11
PHF 1.00 1.00 1.00
ADJ VOLUME 0 881 9 25 0 0 2 0 11
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 28 2 0 12
STEP 1 RIGHT TURNS FROM C:Berry Street
CONFLICTING FLOWS 886
CRITICAL GAPS 4.6
CAPACITY 564
ACTUAL CAPACITY 564
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 890
CRITICAL GAPS 5.3
CAPACITY 428
CAPACITY USED 6%
IMPEDANCE FACTOR 0.96
ACTUAL CAPACITY 428
1985 HCM - CHAPTER 10 : UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:09-21-1988 TIME: 14:05: 15
Riparian Industrial Park
STEP 3 LEFT TURNS FROM C:Berry Street
CONFLICTING FLOWS 911
CRITICAL GAPS 7.4
CAPACITY 200
ACTUAL CAPACITY 193
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 28 428 400 A 9.00 0.07
LT FROM C: 2 193 191 D 18.89 0. 14
RT FROM C: 12 564 552 A 6.52 0.00
i
1
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:09-21-1988 TIME:14:02:27
Riparian Industrial Park - PROPOSED A.M.
LAST DATASETS LOADED OR SAVED
VOLUME=ridvol. GEOMETRICS=ridg
KEY: A-- -B
I
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 45 MPH ,
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A— EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: Berry Street
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: YES
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: Berry Stree
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: Berry Stree
LT TH RT LT TH RT LT TH RT
VOLUME 0 1042 3 23 0 0 0 0 40
PHF 1.00 1.00 1.00
ADJ VOLUME 0 1042 3 23 0 0 0 0 40
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 25 0 0 44
STEP 1 RIGHT TURNS FROM C:Berry Street
CONFLICTING FLOWS 1044
CRITICAL GAPS . 4.6
CAPACITY 484
ACTUAL CAPACITY 484
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 1045
CRITICAL GAPS 5.3
CAPACITY 360
CAPACITY USED 7%
IMPEDANCE FACTOR 0.96
ACTUAL CAPACITY 360
i
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:09-21--1988 TIME:14:02:27
Riparian Industrial Park
STEP 3 LEFT TURNS FROM C:Berry Street
CONFLICTING PLOWS 1067
CRITICAL GAPS 7.4
CAPACITY 157
ACTUAL CAPACITY 150
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 25 360 334 B 10.77 0.08
RT FROM C: 44 484 440 A 8.18 0. 00
1985 HCM -- CHAPTER 10 : UNSIGNALIZED -- 3 APPROACHES (PAGE 1 of 2)
DATE:09-21--1988 TIME: 14:07:57
Riparian industrial Park - PROPOSED P.M_
LAST DATASETS LOADED OR SAVED
VOLUME=ridvol GEOMETRICS=ridg
KEY: A- --B
C -
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: STOP
PREVAILING SPEED: 45 MPH
MAIN STREET # OF LANES: 2 LANES `
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N
MINOR STREET LANES
APPROACH: C: Berry Street
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: YES
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: Berry Stree
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: Berry Stree
LT TH RT LT TH RT LT TH RT
VOLUME 0 912 9 34 0 0 3 0 26
PHF 1.00 1.00 1.00
ADJ VOLUME 0 912 9 34 0 0 3 0 26
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 37 3 0 29
STEP 1 RIGHT TURNS FROM C:Berry Street
CONFLICTING FLOWS 917
CRITICAL GAPS 4.6
CAPACITY 548
ACTUAL CAPACITY 548
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 921
CRITICAL GAPS 5.3
CAPACITY 413
CAPACITY USED 9%
IMPEDANCE FACTOR 0.95
ACTUAL CAPACITY 413
1985 HCM -- CHAPTER 10 : UNSIGNALYZED -- 3 APPROACHES PAGE 2 of 2
DATE:09-21-1988 TIME:14:07:57
Riparian Industrial Park
STEP 3 LEFT TURNS FROM C:Berry Street
CONFLICTING FLOWS 951
CRITICAL GAPS 7 .4
CAPACITY 188
ACTUAL CAPACITY 178
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 37 413 376 B 9.58 0. 10
LT FROM C: 3 178 174 D 20.65 0.21
RT FROM C: 29 548 519 A 6,94 0.01
i
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:09--21-1.988 TIME:13:57:24
Riparian Industrial Park -- PROPOSED A.M. Rte. 114 at Site Drive
LAST DATASETS LOADED OR SAVE
D
VOLUME-ridvol GEOMETRICS=ridg
KEY: A- -B
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: YIELD
PREVAILING SPEED: 45 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: Y
MINOR STREET LANES
APPROACH: C: Site Drive at
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: YES
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 1.14 C: Site Drive
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0. 00 0.00
APPROACH A: Rte 114 B: Rte 114 C: Site Drive
LT TH RT LT TH RT LT TH RT
VOLUME 0 1035 28 39 0 0 5 0 7
PHF 1.00 1.00 1.00
ADJ VOLUME 0 1035 28 39 0 0 5 0 7
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 43 6 0 8
STEP 1 RIGHT TURNS FROM C:Site Drive at
CONFLICTING FLOWS 1035
CRITICAL GAPS 3.8
CAPACITY 704
ACTUAL CAPACITY 704
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 1035
CRITICAL GAPS 5.3
CAPACITY 364
CAPACITY USED 12%
IMPEDANCE FACTOR 0.93
ACTUAL CAPACITY 364
1985 HCM - CHAPTER 10 UNSIGNALIZED -- 3 APPROACHES (PAGE 2 of 2)
DATE:09-21-1988 TIME:1.3 :57:24
Riparian Industrial. Park
STEP 3 LEFT TURNS FROM C:Site Drive at
CONFLICTING FLOWS 1088
CRITICAL GAPS 7.4
CAPACITY 152
ACTUAL CAPACITY 140
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 43 364 321 B 11.23 0.13
LT FROM C: 6 140 135 D 26.71 0.32
RT FROM C: 8 704 696 A 5. 17 0.01
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:09-21-1988 TIME:13:55:06 '
Riparian Industrial Park - PROPOSED P.M_ Rte. 114
LAST DATASETS LOADED OR SAVED
VOLUME=ridvol GEOMETRICS=ridq
KEY: A- -B
I
c
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
FROM C RT LANE: YIELD
PREVAILING SPEED: 45 MPH
MAIN STREET # OF LANES: 2 LANES `
MAIN STREET APPROACH A -- EXCLUSIVE RIGHT TURN LANE: Y
MINOR STREET LANES
APPROACH: C: Site Drive at
SHARED LEFT AND RIGHT TURN LANE: NO
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: YES
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Rte 114 B: Rte 114 C: Site Drive
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Rte 114 B: Rte 114 C: Site Drive
LT TH RT LT TH RT IT TH RT
VOLUME 0 881 13 18 0 0 22 0 31
PHF 1.00 1.00 1.00
ADJ VOLUME 0 881 13 18 0 0 . 22 0 31
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 20 24 0 34
STEP 1 RIGHT TURNS FROM C:Si.te Drive at
CONFLICTING FLOWS 881
CRITICAL GAPS 3.8
CAPACITY 796
ACTUAL CAPACITY 796
STEP 2 LEFT TURNS FROM B:Rte 114
CONFLICTING FLOWS 881
CRITICAL GAPS 5.3
CAPACITY 432
CAPACITY USED 5%
IMPEDANCE FACTOR 0.98
ACTUAL CAPACITY 432
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:09-21-1988 TIME:13:55:06
Riparian industrial Park
STEP 3 LEFT TURNS FROM C:Site Drive at
CONFLICTING FLOWS 906
CRITICAL GAPS 7.4
CAPACITY 201
ACTUAL CAPACITY 197
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
LT FROM B: 20 432 412 A 8.74 0. 05
LT FROM C: 24 197 172 D 20.87 0. 11
RT FROM C: 34 796 762 A 4.72 0.03
1985 HCM -- CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:09-21-1988 TIME:14: 10:55
Riparian Industrial Park - PROPOSED A.M. Site Drive on Berry Street
LAST DATASETS LOADED OR SAVED
VOLUME=ridvol GEOMETRICS=ridg
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
PREVAILING SPEED: 30 MPH
MAIN STREET' W OF LANES: 2 LANES
MAIN STREET APPROACH A - EXCLUSIVE RIGHT TURN LANE: N "
MINOR STREET LANES
APPROACH: C: Site Drive 2
SHARED LEFT AND RIGHT TURN LANE: YES
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Berry Stree B: Berry Stree C: Site Drive
LEFTS 0.00 0.00 0.00
THRUS 0.00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Berry Stree B: Berry Stree C: Site Drive
LT TH RT LT TH RT IT TH RT
VOLUME 0 6 20 0 37 0 3 0 0
PHF 1.00 1.00 1.00
ADJ VOLUME 0 6 20 0 37 0 3 0 0
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 0 3 0 0
STEP 1 RIGHT TURNS FROM C:Site Drive 2
CONFLICTING FLOWS 16
CRITICAL GAPS 4.0
CAPACITY 1512
ACTUAL CAPACITY 1512
STEP 2 LEFT TURNS FROM B:Berry Street
CONFLICTING FLOWS 26
CRITICAL GAPS 5.0
CAPACITY 1193
CAPACITY USED 0%
IMPEDANCE FACTOR 1.00
ACTUAL CAPACITY 1193
1985 HCM - CHAPTER 10 : UNSIGNALIZED - 3 APPROACHES (PAGE 2 of 2)
DATE:09-21-1988 TIME: 14: 10:55
Riparian Industrial Park
STEP 3 LEFT TURNS FROM C:Site Drive 2
CONFLICTING FLOWS 53
CRITICAL GAPS 6.5
CAPACITY 877
ACTUAL CAPACITY 877
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
ALL MOVES FROM C: 3 877 874 A 4. 12 0.00
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 1 of 2)
DATE:09-21-1988 TIME:14:12:01
Riparian Industrial Park - PROPOSED P.M. Site Drive on Berry Street
LAST DATASETS LOADED OR SAVED
VOLUME=ridvol GEOMETRICS=ridg
KEY: A- -B
C
GENERAL CHARACTERISTICS
POPULATION GREATER THAN 250,000: NO
CONTROLS: FROM C: STOP
PREVAILING SPEED: 30 MPH
MAIN STREET # OF LANES: 2 LANES
MAIN STREET APPROACH A -- EXCLUSIVE RIGHT TURN LANE: N `
MINOR STREET LANES
APPROACH: C: Site Drive 2
SHARED LEFT AND RIGHT TURN LANE: YES
LARGE RIGHT TURN RADIUS OR SHALLOW RIGHT TURN ANGLE: NO
RIGHT TURN ACCELERATION LANE ON MAJOR: NO
SIGHT DISTANCE RESTRICTIONS (in seconds)
APPROACH A: Berry Stree B: Berry Stree C: Site Drive
LEFTS 0.0,0 0.00 0.00
THRUS 0. 00 0.00 0.00
RIGHTS 0.00 0.00 0.00
APPROACH A: Berry Stree B: Berry Stree C: Site Drive
LT TH RT LT TH RT LT TH RT
VOLUME 0 34 9 0 13 0 16 0 0
PHF 1.00 1.00 1.00
ADJ VOLUME 0 34 9 0 13 0 16 0 0
PERCENT GRADE 0.00 0.00 0.00
PASS CAR/HR 0 0 18 0 0
STEP 1 RIGHT TURNS FROM C:Site Drive 2 .
CONFLICTING FLOWS 39
CRITICAL GAPS 4.0
CAPACITY 1484
ACTUAL CAPACITY 1484
STEP 2 LEFT TURNS FROM B:Berry Street
CONFLICTING FLAWS 43
CRITICAL GAPS 5.0
CAPACITY 1172
CAPACITY USED 0%,
IMPEDANCE FACTOR 1.00
ACTUAL CAPACITY 1172
1985 HCM - CHAPTER 10 UNSIGNALIZED - 3 APPROACHES (PAGE 2 Of 2)
DATE:09-21-1988 TIME: 14:12:01
Riparian Industrial Park
STEP 3 LEFT TURNS FROM C:Site Drive 2
CONFLICTING FLOWS 52
CRITICAL GAPS 6. 5
CAPACITY 879
ACTUAL CAPACITY 879
SUMMARY OF LEVEL OF SERVICE BY MOVEMENT
MOVEMENT DEMAND CAPACITY RESERVE LOS AVG DEL(SEC) AVG QUEUE
ALL MOVES FROM C: 18 ' 879 861 A 4. 18 0.02