HomeMy WebLinkAbout1998-04-10 Response Comments SPR MEOW
® A
MHE Design Consultants, Inc. 12-8 Manor Parkway > Salem, NH 03079 -TEL(603)893-0720 • FAX (603)893-0733
'A
March 23, 1998 I 1'
Ms. Kathleen Colwell
Planning Director
120 Main Street
North Andover, MA 01845
RE: Cofer & Colantonio Engineering Review
Channel Building Company
Dear Ms. Colwell:
Comments received from Cofer& Colantonio in their plan review letter dated March 11,
1998 have been received, The enclosed plans and revised report are intended to
specifically address the comments and further questions which have been raised. This
letter narrative is formatted in response to Coler& Colantonio's original letter and is
intended to direct specifically raised questions, to the appropriate response area and to
assist in further clarification and amplification of MHF's response.
Information Required:
To make the plan more readable, some of the proposed notes have been moved.
Zoning Bylaws:
1. The location map on the plan front sheet has been revised to a scale of 1" _
1,000' as required.
2. The Grading & Drainage Plan has been revised accordingly.
ENGINEERS m PLANNERS . SURVEYORS
3. See Below. MHF Design Consultants, Inc.
4. No response necessary.
5. Access drive has been shown. [Refer to the Existing Conditions Plan]
6. Tree line has been shown. [Refer to the Existing Conditions Plan.]
7. No response necessary.
Drainage Issues:
8. These plans were sent out overnight delivery on March 12, 1998 to Coler&
Colantonio and crossed in the mail. Calls to Coler& Colantonio confirm that
they have received these report plan inserts. However, based on conversation
with John Chessia the Pre-Development Runoff Worksheet was re-plotted at
1"= 30' which matches the same scale as the Post-Development Runoff
Worksheet, so the two plans and drainage areas can be overlaid. In the revised
Stormwater Management Report each of the hydrographs have been printed for
the 10-Year design Storm (for flows greater than 0.5 efs, except for hydrograph
#16 - the out flow of the detention pond which illustrates the 24-hour detention
pond flow. As can be seen, the detention pond has a water surface elevation of
242. 31 (9" +1-) 24-hours after the beginning of the storm. [Refer to Stormwater
Management Report page 3-47.] This qualifies the detention pond as "long
term". The print of these hydrographs illustrate input areas used and the RCN
values. An additional worksheet, in Section Two [page 2-5] has been added
which modifies the Pre-Development runoff area. This area now includes the
drainage runoff area of the detention pond itself (0.13 acres) and all landscaped
area between the impervious area and the landscaped area of disturbance
(0.45 aces). Previously, the footprint of the impervious area (and landscaped
areas within it) was used in the Pre and Post-Development Runoff calculations.
These changes, along with the re-graded detention pond have all been
incorporated into the revised 2, 10, 50 and 100 Year Hydrographs.
9. Stormwater runoff at each catch basin inlets is provided in the Stormwater
Management Report for this site. Proposed grading has been revised beyond
the five foot sidewalk for Catch Basin #1. This grading directs the Stormwater
runoff for the 50 and 100-year storm to the detention pond. [Refer to page 2-7
and the revised Grading & Utility Plan, sheet 4 of 8.]
10. The detention pond has been revised per this comment and comments numbers
8, 12 and 13. These comments will all be addressed here together. The
a f y
MWERW RIM mom
wuwmx .mn.
..n w
detention pond has been revised from a wet bottom design, to a ftliRR�"Consultants, Inc,
design. This eliminates the need for the draw down piping and value as
discussed in the review letter under Standard Number 4. The proposed outlet
of the detention pond is now at elevation 241.50 (the former wet pond bottom
elevation).
Incorporated into the detention pond re-grading is a four foot wide emercy
spillway, in case both the proposed weir outlet (elevation 244.60 ) and the
emergency overflow grate (elevation 245.45) should get plugged. The
emergency spillway overflow elevation is designed for the 100-Year Storm
elevation 245.10), The top of the eight-foot wide berm is at elevation 246,25.
[Refer to the Grading & Drainage Plan, sheet 4 of 8 and the Detail Sheet, sheet
7of8]
11. The outlet of the detention pond has been revised. Based on conversations
with the town, the conservation commission and the town's review consultant
(Coley& Colantonio) the preferred method of discharge is to outlet, to a grass
swale outside of the25-footg o disturbance zone_.vers s tying.inpto„the existing
catch basin and outlet through the existingestablished outlet. i e. The revised
flans show a side discharge from the detention pond outlet control structure (at
elevation 240.50). This outlet pipe is one foot below, the 2 112" cored detention
pond outlet. Stone for erosion control (8-feet long and 8-feet wide) is
proposed at the flared end section (FES #2). [Refer to the Grading & Drainage
Plan, sheet 4 of 8 and the Detail Sheet, sheet 7 of 8 (Details Detention Pond
Cross Section A-A, Proposed Outlet Structure (MH 0), and Outlet Protection
Detail)
12. The berm has been revised to 8-feet wide. [Refer to Grading & Drainage Plan,
sheet 4 of 8 and the Detail Sheet, sheet 7 of 8.]
13. A proposed spillway for the 100-Year Storm has been incorporated into the
revised detention pond grading. [Refer to Grading & Drainage Plan, sheet
4 of 8 and the Detail Sheet, sheet 7 of 8]
14. A clean out has been proposed on the revised Grading and Drainage Plan.
[Refer to Grading & Drainage Plan, sheet 4 of 8.]
15. The treatment grass swale has been revised. [Refer to Grading & Drainage
Plan, sheet 4 of 8 and a Detail Worksheet on page 2-22 in the Stormwater
--,9 SA Management Report] The proposed treatment Swale has a 4-foot wide flat
`-1 bottom with 6.1 side slopes a proposed 4" perforated PVC pipe assists in
t draining the 6" sump in the level grass treatment swale. The proposed grass
treatment swale is in conformance with the standards put forth in the stormwater
Policy Handbook. [Refer to Stormwater Management Report page 2-23]
f }
■
16. The proposed catch basin and manhole layout has been revisedMTA9 gbConsultants, Inc.
Grading & Drainage Plan, sheet 4 of 8.]
Stormwater Management Policy
The original Stormwater Management Report did not include the blank Stormwater
Management Form. However the design narrative addressed each point in the
Stormwater Management Policy. The blank Stormwater Management Form is now
included in the Revised Stormwater Management Report. [Refer to the revised
Stormwater Management Report, pages 2-10 to 2-15.] The last page of the design
narrative (2-15) has been stamped and certified.
A note (#6) has been added to the plans which addresses the parking lot sweeping.
A complete 24-hour print out of the detention pond outflow for the 10-Year Design
Storm has been incorporated into the Revised Stormwater Management Report. [Refer
to Hydrograph #16 in Section 3 of the revised report.]
An excerpt of the Design Criterion for Wet Quality Treatment Swales for the
Stormwater Policy Handbook is included in Section 2.0 of the revised Stormwater
Management Report along with pertinent calculations. [Refer to page 2-23 of the
Stormwater Management Report.]]
Sin r ly,
L rry D. urster, P.E.
enior ngineer
LDW
Enclosure: Revised Stormwater Management Report
Revised Plans
cc: John Chessia
Greig Wiech
56097 CR