hi o acts Recalved
Orchard Hill Road February 23, 1998
Channel Building Co. February 23, 1998
S. Bradford Street(told to hold review) February 23, 1998
Exleting projects RaeelyRd _
Berrington Place February 19, 1998
additional information for Lot 2 Layout—complies with section 71.
Awaiting rest of information to finish review.
i
Lots 4& 5 Willow Street-Site Plan Review
1. Application/Fee/Abutters list submitted
2. Drawings at 1"=40'certified by registered professional engineer submitted
3. North Arrow/Location Map(1"=1500') submitted 44l
1�.
4. Survey of the Lot/Parcel submitted
5. Name/Description of Project:need names,addresses and telephone numbers of the project tenants,description
of the proposed tenant
6, Easements/Legal Conditions submitted
7. Topography: submitted
8. Zoning Information: submitted
9. Storm water Drainage Plan: JC to review
10. Building(s)Location submitted
11. Building Elevation: submitted
U. Location of Parking/Walkways:Parking spaces should be 9'x 181,no compact spaces allowed
13. Location of Wetlands: need confirmation from ConCom
14. Location of Walls/Signs submitted
15, Location of Roadways/Drives:Is driveway all around the building required?Necessary?
16. Outdoor Storage/Display Area none shown
17. Landscaping Plan(1 tree every 30') submitted
18. Refuse Areas: 10'x 10' trash enclosure(6'stockade fence) submitted
19. Lighting Facilities: to be submitted
20, Drainage.Basin Study N/A
21. Traffic Impact Study: information on the type of truck traffic to be submitted, hours of operation, f# of
employees
22. Commonwealth Review:Any state permits required?
23. Utilities:to be reviewed by DPW
24, Fiscal Impact not submitted
25. Community Impact not submitted
JryI
J
I
i
COL ' R& f " �5RO
COLA (TON10 2 f
FACSIMILE COVER SHEET
To: Kathleen Colwell
Company. North Andover Planning Board
Phone: 978-688-9535
Fax: 978-6 88-9542
From: John C. Chessia
Company: Coler& Colantonio, Inc.
Phone: 781-982-5400
Fax: 781-982-5490
Rafe: April 3, 1998
Pages including this
cover page: 5
Comments:
Attached is the Supplemental Site Review for Willow Street South Extention.
cc:MHF Design Consultants 603.893.0733
Jinn Rand,DPW 978-688-9573
CO
- I
ENGINE=r2RS AND SC19NTiS-r$
i
April 3, 1998
Ms.Kathleen Colwell
Planning Director
Town Hall Annex
30 School Street
North,Andover, MA 01845
RE: Supplemental Engineering Review
Willow Street South Extension
Dear Ms. Colwell-
In response to your request, Coler& Colantonio, Inc. has reviewed the revised Site Pleats
for the above referenced site. This correspondence follows the comment numbering
system of our previous letter dated March 11, 1998. In addition, we visited the site on
March 27, 1998 to observe the existing conditions. The revised submittal package
included the following information:
Plans Entitled:
"Willow Sheet South Extension"nine sheets dated December 19, 1997,
Prepared by MHF Design Consultants, Inc. Revised March 20, 1998.
Received March 24, 1998.
e "Proposed R&D Facility: Elevations"one sheet dated December 15,
1997,Prepared by Channel, Wilmington,MA. Revised January 8, 1998.
Received March 24, 1998.
Reports Entitled
® "Stormwater Management",Prepared by MHF Design,Consultants,Inc.
Received March 24 1999.
Our current comments are found in italics.
Information Required,
Zug Bylaws
1. Section 8.3) 5.)e.)i.)The location map is not at the scale of 1" = 1500'. Satisfactory.
2. Section 8.3) 5.)e.)v.)There is a proposed contour missing on the north side of the
property(sheet 4 of 8). The grade 242 enters the retaining wall and never comes back
out. Satisfactory.
101 Accord Park Drive 781 962.5400
Norwell. MA 02061-1685 Fax: 781-982-5490
i
3. Section 8.3) 5.)e,)vi.) See drainage issues below.
4. Section 8.3) 5.)e,)x,)The Building Inspector should review the plans for ADA,
cornpliance. No further comment.
5. Section 8.3) 5.)e.)xiii.) Any access driveways on the South side of Flagship Drive
should be indicated. No further comment.
5. Section 83) 5.) e.)xv,) The plan does not indicate an existing tree line. Satisfactory
7. It is our understanding that Sections 8.3)5.) e.),xix,xx, xxii,xxiii, are typically
reviewed by Town Staff. No further comment.
Drainage Issues
8. Subarea plans were not in,our calculation package. We could not evaluate the
drainage areas,curve numbers and times of concentration without the plans. We have
contacted MHF Design Consultants, Inc. to supply these plans. Plans have been
Provided No further comment.
9. Information should be provided on the inlet capacity of catch basin grates. Since the
parking lot has a slope toward Catch Basin 1, by pass of the grates in larger storm
events would result in runoff overflowing the five-foot concrete walks. Grading
beyond the sidewalk should be directed toward the north side of the drainage basin,
Satisfactory.
10. The drainage basin as designed will hold one foot of standing water. The invert.out of
the detention basin conflicts between the drawing and the calculations. The
calculations show the new design having an outlet at a bottom elevation of 241.50.
We recommend that the basin provide a positive pitch to the outlet.
11. Typically connections are not allowed into street catch basins. The design has been
revised to have an outlet structure to drain the detention hasin into a channel and
then into the wetlands,
12. We recommend that stormwater facilities be designed constant with the requirements
of ASCE Manual and Reports of Engineering Practice No. 77 and the DEP
Stormwater Management Policy. The drainage basin berm is three feet wide, which is
not consistent with these design standards. The basin berm has been widened to eight
feet.
13, An emergency overflow spillway for the detention basin should be designed for larger
storm events in the occurrence that the outlet structure is plugged with debris. This
spillway should be sized to pass a 100-year storm with the outlet plugged. We
suggest the spillway be located at the western side of the detention basin to allow for
emergency discharge into the wetlands, Satisfactory.
14. A clean out is needed on the outside perimeter of the loading docks, The pipe flow
changes direction at that location, Satisfactory.
15. Vest pit data was not provided at the location of the grass Swale. With the soil
conditions found throughout the rest of the site,the soil does not appear to be suitable
for infiltration. A detail along with calculations of the grass swale and its adequacy
should be provided. See standard 4 below,
16. Catch basins 1 and 2, along with Drain Manhole I (DMH1) flow into Drain Manhole
2 (DMH2). Catch basin 2 and DMHI enter DMH 2 at the same elevation A d at an
angle greater than 90 degrees. We recommend that the storm drain layout be revised
to eliminate changes in direction of over 901. Satisfactory,
Stormwater Management Policy
The Stormwater Management Form was not submitted with this set. It is unclear if the
Conservation Commission received this form.
Standard 1,
Satisfactory.
Standard 2.
Post development peak discharge rates do not exceed the pre-developed rates at
the design point for any of the storms. Subarea plans were not in our calculation
package. We could not evaluate the drainage areas,curve numbers and times of
concentration without the plans. Satisfactory.
Standard
The recharge volume for Soil Group D is waived. No further comment.
Standard 4
Street sweeping is discretionary subject to the Conservation Commission
approval. It is the unclear that sweeping twice a year is adequate. The
Conservation Commission should receive acceptable assurances that the proposed
sweeping will take place.
It is unclear if the detention basin has adequate detention time to meet the
requirements for the Extended Detention Basins. A drain valve should be
installed in the outlet structure of the basin to ensure that the basin can be drained
completely. Maintenance access should be provided, structures should be
accessible to maintenance personnel during normal and emergency conditions.
Additional data should be submitted to support these requirements. Satisfactory,
Additional information is required to determine the conformance of the water
quality swale to DEP design criteria, Water quality swales should be sized to
retain the entire runoff volume, calculations should be provided to verify
adequate storage has been provided. We recommend a cross section be supplied
,As currently indicated the contouring is incomplete.
We recommend standard DEP TSS removal rate sheets should be submitted.
Standard
The proposed building is referred to as a Research and Development building. It
is unclear as to what type of research will be conducted in the structure, and
therefore it is unknown as to whether or not it meets standard 5. No further
comment.
Standard 6
Not applicable.
StAndard 7
Not applicable.
Standard 8 & Standard 9
It is our understanding that Town Staff typically reviews Standards 8& 9. No
further comment.
We appreciate the opportunity to assist the Planning Board on this project and hope that
this information is sufficient:for your needs. We would be pleased to meet with the
Board or the design engineer to discuss this project at your convenience. If you have any
questions please do not hesitate to contact us.
Very trwy yours,
COLER& COLA.NTONIO,INC.
John C.Chessia,RE.
CC' MHF Design Consultants, Inc.
Jim Rand,DPW
i
C L &
CCILANTONIOZ
GNO1 yeeRs Arvo 5QIE vr,$7-Z
May 7, 1998
i
Ms.Kathleen Colwell
Planning Director
Town Hall Annex
30 School Street
North Andover,MA, 01845
RE: Supplemental Engineering Review
Willow Street South Extension
Dear Ms. Colwell:
In response to your request, Coler & Colantonio, Inc, has completed a final review of the revised
Site Plan for the above referenced site. The submittal package included the following;
Plan Entitled;
• "Willow Street South Extension"one sheet dated December 19, 1997,Prepared by
M1F Design Consultants,Inc.Revised April 10, 1998.Received April 1.3, 1998.
• "Swale Storage Volume Calculations", one sheet dated April 10, 1998,Prepared by
MHF Design Consultants, Inc. Received April 13, 1998.
1. Tktc revised design of the detention basin indicates a positive pitch and the basin outlet:does not
conflict with the calculations.
We have no further comments.
We appreciate the opportunity to assist the Planning board on this project and Dope that this
information is sufficient for your(needs. We would be pleased to meet with the Board or the design
engineer to discuss this project at your convenience. If you have any questions please do not
hesitate to contact us.
Very truly yours,
COLER&COLANTONIO,INC.
Jo,hnl C. Chessia,P.E.
cc: MIS'Design Consultants,Inc.
Jiro Rand,DPW
101 Accord Park Dave 781 992-6400