Loading...
HomeMy WebLinkAbout2001-07-11 Application SPR LANDSCAPE ARCH1TFCTURE & LAND PLANNING Thursday, April 19, 2001 Ms. Heidi Griffin Town Planner Town of North Andover 120 Main Street North Andover, MA 01845 Re: Lot F, Flagship Drive—Site Plan Review Special Permit. Dear Ms. Griffin: On behalf of Ranger Development Corp, we are please to provide the attached Site Plan Review Special Permit application regarding the proposed Professional/Medical Office Building on Lot F, Flagship Drive. The following is a brief description of the proposed project, existing property, and the specific requirements to be met for the issuance of the Special Permit. 1. Description of Proposed Project: The proposed project will entail the construction of a 72,000 sf office building with 16,250 sf of parking in a basement floor area. The site is a 4.06 +/- acre parcel of land bounded by Flagship Drive to the northwest; residential property to the south; office/industrial use to the east and west, The building will be a maximum of 55' in height,,and has been designed to compliment the style of the surrounding office/commercial architecture. In an effort to maximize open space, enhance on- site landscaping, and to work with the existing topography, the first level of the building accommodates approximately 35 parking spaces. The site will be serviced with municipal sewer, water, electric, and telephone and gas service. For a complete description of proposed utilities please refer to the attached plans. 2. Description of Premises: The site is primarily undeveloped, consisting of open fields to the Borth and mature trees in the southwest portion of the site. The primary use is undeveloped land, and the property contains approximately 4.06 +1- acres. 3. NAZB Section 8.3 (6) Site Plan Review—Review Criteria/Design Guidelines: GENERAL a. Conformance with all appropriate provisions of the Zoning Bylaw. 17 T0WksbUry Street, Andover MA w810 978-470.8882 ctttuitress-liotivail,c:oiFi i I Ms. Heidi Griffin 04/19/2001 Page 2 of 6 The proposed use is allowed by right in the Industrial One(1-1)Zoning District. The project also conforms to all dimensional criteria listed in Section 7 and Table 2 (Summary of Dimensional Requirements)of the North Andover Zoning Bylaw. The building will be a maximum of 55' in height, and has been designed to compliment the style of the surrounding office/commercial architecture, In an effort to maximize buffer space, open space, internal landscape areas, and to work with the existing topography, the first level of the building accommodates approximately 35 parking spaces. b. Protection of abutting properties from detrimental site characteristics. The project provides a 202' building setback from the adjacent residential property line. The existing grades and mature vegetation located adjacent to the residential properties to the south will not be impacted, and will provide a substantial natural buffer. In addition, as shown on the Landscape Plan, the natural buffer area will be enhanced with extensive landscape material to provide an improved buffer between the proposed office and adjacent residential use. The character of the proposed building will reflect the architectural style of adjacent commercial/industrial buildings and will be well suited for its location on Flagship Drive. ENVIRONMENTAL a. Protection of unique or important natural, historic or scenic features. The existing grades and mature vegetation located adjacent to the residential properties to the south will not be impacted, and will provide a substantial natural buffer. b. Adequacy of proposed methods of refuse disposal. The project includes a disposal area with a six (6') foot solid wood fence enclosure that will adequately handle the needs of the building. c. Ability of the proposed sewage disposal and water supply system within and adjacent to the site to serve the proposed use. The project will be connected to the municipal water and sewer system available in Flagship Drive. Sufficient capacity exists within the municipal system to accommodate the proposed project needs. d. Adequacy of proposed drainage system within and adjacent to the site to handle the increased runoff resulting from the development. A sub-surface drainage system is being proposed, and not only accommodates all increased runoff resulting from the development, but will in fact provide excess capacity for stormwater treatment on-site. Please refer to the enclosed drainage report for additional information. i Ms. Heidi Griffin 04/19/2001 Page 3 of b e. Provision of adequate landscaping, including the screening of adjacent residential uses, provision of street trees, landscape islands in the parldng lots and landscape butler along the street frontage. The site has been designed to retain the existing vegetation along the southern edge of the property. This vegetation is comprised of a mature mixed hardwood forest, and provides a significant natural buffer between this property and the abutting residential use. This submission also includes a Landscape Plan providing proposed landscape within the parking lots, side yard, front yard and streetscape areas. This plan provides emphasis on an enhanced landscape buffer to the rear of the property. f. Adequacy of the soil erosion plan and any plan for protection of steep slopes both during and after construction. An erosion control plan has been provided as part of this submission. All proposed grades within landscape areas will not exceed 3:1, and all slopes will be stabilized both during and after construction. The Applicant will take particular care with respect to maintaining enhanced erosion and sedimentation controls to avoid impact to adjacent properties. g. Protection of adjacent properties by minimizing the intrusion of lighting, including parking lot and building exterior lighting. A lighting facilities plan has been provided as a part of this submission. Light poles will not exceed 20' in height, and all fixtures adjacent to the residential zone line will be provided with a cut-off shield to minimize intrusion of off-site light spill on adjacent properties. It. The proposed development must not present a demonstrable adverse impact on the surrounding area resulting from excessive noise, dust, smoke, or vibration that are higher than levels now experienced from uses permitted in the surrounding area. The proposed use is a medical/professional office building. There will be no long-term impact on the surrounding area from excessive noise, dust, smoke or vibration. DESIGN a. Buildings will be located with respect to setbacks, placement of parking, landscape, entrances and exits with surrounding buildings and development. The proposed site plan conforms to the required building setbacks, and no conflict will exist between this site and the existing parking, landscape, entrance or exit of another adjacent use. b. The buildings shall relate harmoniously to each other in architectural style, site location and building exits and entrances. Ms. Heidi Griffin 04i 19/2001 Page 4 of The character of the proposed building will reflect the architectural style of adjacent commercial/industrial buildings and will be well suited for its location on Flagship Drive, The proposed building design is substantially in accordance with the design proposed at an informal discussion before the Planning Board in March of 2001. The project provides a 202' building setback from the adjacent residential property line. The existing grades and mature vegetation located adjacent to the residential properties to the south will not be impacted, and will provide a substantial natural buffer, in addition to the enhanced buffer proposed on the Landscape Plan. C. Screening will be provided for storage areas, loading docks, dumpsters, rooftop equipment, utility buildings and similar features. The proposed refuse area will be provided with a 6' solid wood fence enclosure. A storage area is proposed within the parking area located in the basement level of the building, and will not be visible from the exterior. All mechanical, electrical and HVAC units have been located within the building and will not be visible, or create a nuisance, to surrounding properties. d. Electric, telephone, cable T.V., and other such utility lines and equipment must be placed underground. All utilities will be located underground. Please refer to the enclosed utility plan for more detailed information. e. Demonstrate that the proposed scale, massing and detailing of buildings are compatible with those prevalent in the surrounding area. The propose building is in scale with the surrounding commercial/industrial buildings within the Industrial Park and surrounding properties. Please refer to the enclosed architectural plans for additional detail. TRAMC/PARKI=NG a. The location and number of curb cuts shall be minimized to reduce turning movements,and hazardous exits and entrances. The location and number of curb cuts has been reviewed and is appropriate for the proposed use. b. Provision for access to adjoining properties shall be provided as appropriate. Because of the proposed office use, the site plan provides access onto Flagship Drive, and access to adjoining properties is not appropriate for the proposed use. C. Driveways shall be located opposite each other wherever possible. j Ms. Heidi Griffin 04/19/2001 Page 5 of 6 There are no existing driveways opposite this site. The closest driveway centerline is offset by more than one hundred and fifty (150') feet from the proposed site access. d. Joint access driveways between adjoining properties shall be encouraged. Because of the proposed office use, the site plan does not provide, and there is no need for, access to adjoining properties. e. Internal circulation and egress shall provide for traffic safety, and access to and from minor streets servicing one fancily dwellings shall be minimized. Internal circulation has been designed to minimize conflicts between cars, trucks and pedestrians. This site does not provide direct or indirect access to minor streets servicing single-family dwellings. 4. NAZB Section 10.31,SPCA findings to be met: a. The specific site is an appropriate location for such use, structure or condition. As the property is zoned for office and industrial use, the site is an appropriate location for the proposed use and structure. The site design compliments the surrounding; uses and provides for sufficient traffic and circulation improvements, as well as sewer, water and other utilities. b. The use as developed will not adversely affect the neighborhood. The project provides a 202' building setback from the rear property line and abutting residential properties. The existing grades and mature vegetation located adjacent to the residential properties to the south will not be impacted, and will provide a substantial natural buffer. The character of the proposed building will reflect the architectural style of adjacent commerciallindustrial buildings and will be well suited for its location on Flagship Drive. C. There will be no nuisance or serious hazard to vehicles or pedestrians. Access will be restricted to Flagship Drive, which is further controlled by the traffic signal at the intersection of Willow and Turnpike Street(Route 114). d. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. The project is serviced by municipal water, sewer and utilities that adequately address the needs of the program. e. The SPGA shall not grant any special permit unless they make a specific finding that the use is in harmony with the general purpose and intent of this bylaw. Ms. Heidi Griffin 04/19/200 t Page 6 of 6 The proposed project is in harmony with the general purposes and intent of Section I ("Purposes") of the North Andover Zoning Bylaw for the following reasons: First, the proposed office use is the most appropriate use of land as there is a large demand for office space in North Andover, and the site is conveniently located in close proximity to Route l 14. Second, the proposed project will not result in overcrowding of the land, given the substantial open space and landscape buffer to be established between the project and neighboring residential use. Third, the project satisfies the number of parking spaces requircd by the NAZB, and will not negatively impact traffic congestion on and around the site. Fourth, the site will also continue to provide adequate light and air, and such considerations were incorporated into the proposed building design and site layout. Fifth, no hazards from fire or other damages will occur, given the proposed office use and adequate provision of parking facilities. Sixth, the proposed site utilities will not unduly burden the Town's infrastructure and other public facilities. Lastly, the proposed project will not only complement the surrounding area by the construction of first class office space to meet the local area office demand, but will serve to provide an important source of tax revenue to the Town. For the reasons stated above, the proposed project is in harmony with the general purpose and intent of the North Andover Zoning Bylaw. We are confident that the plans and supporting information we have submitted are in keeping with the general intent of the North Andover Zoning Bylaw, and are in the best interest of the neighborhood and the Town of North Andover. For these reasons, we request that the Planning Board issue a Site Plan Review Special Permit Approval for the proposed project. We appreciate your time and consideration with regard to this matter and we look forward to working with you throughout the approval process. Please feel free to contact my office with any further questions or concerns. Sincerely, Huntress Assoc ates, Inc. Christian C. Huntress Landscape Architect Cc: David Murray, Ranger Development Corp. Mark Gross, MHF Design Consultants John Stnolak, Peabody& Arnold LLP Pagel of 3 Site Plan Special Permit{{Application '. A 47 JU Town of North Andover PlanningBoard WORTH AN COVER Application for Site Plan Special Permit Please type or print clearly. 1. Petitioner: Ranger Development Corp. Petitioner's Address: 65 Flagship Drive-North Andover Massachusetts 01845 Telephone number: 978.794.8420 phone 2. Owners of the Land: Itellisense Nominee Trust Address: c/o Charles Edward Maseeh Trustee Number of years of ownership: 4 ears+ 3. Description of Proposed Project: The proposed project will entail the construction of a 72,000 sf office building with 16,250 sf of parking in a ground floor area. The site is a 4.06+/-acre parcel of land bounded by Flagship Drive to the northeast; residential property to the southwest; office/industrial use to the north and south. The building has been designed to compliment the style of the surrounding office/commercial architecture. In an effort to provide additional open space,and work with the existing topography on site parking will be provided at the first level of the building,and accommodates approximately 35 parking spaces.The site will be serviced with municipal sewer,water,electric,telephone and gas service. For a complete description of proposed utilities please refer to the attached plans. 4. Description of Premises: The site is primarily undeveloped,consisting of open fields to the north and mature trces in the southwest portion of the site. The primary use is undeveloped land, and the property contains approximately 4.06+/-acres. 5. Address of Property Being Affected: Lot F,Flagship Drive,North Andover Zoning District: Industrial One I-1 and Residence Two R-2 Assessors: Map: 107C Lot# 23 Registry of Deeds: Book#: 4700 Page# 43 6. Existing Lot: Lot Area(Sq. Ft) 4.06 Acres-+/- BuildingHeight: n/a Street Frontage: 170.86' +/- Side Setbacks: n/a Front Setback: n/a Rear Setback: n/a Floor Area Ratio: n/a Lot Coverage: n/a 7. Proposed Lot(if applicable): Lot Area(Sq. Ft) 4.06 Acres(total) BuildingHeight: 55' Street Frontage: 170.86' +/-Total Side Setbacks: 7 P and 63' Front Setback: 59'+/- Rear Setback: 202' to property line Floor Area Ratio: .50:1 Lot Coverage: Less than 35% 8. Required Lot(as required by Zoning Bylaw): Lot Area(Sq.Ft) 80,000 sf (1.84 acres) BuildingHeight: 55' Street Frontage: 150' Side Setbacks: 50' Front Setback: 50' Rear Setback: 100'From R-2 Boundary _ Floor Area Ratio: .50:1 Lot Coverage: 35% i Page 2 of 3 Site Plan.Special Permit Application 9. Existing Building(if applicable): Ground Floor(Sq. Ft.) n/a #of Floors n/a Total Sq.Ft. n/a Height: n/a Use: Undeveloped Type of Construction:n/a 10. Proposed Building: Ground Floor(Sq. Ft.) 16,250 sf(parking area) #of Floors Three/four,see plan Total Sq. Ft. 88,250 sf(including parking area Height: 55' max Use: ProfessionaVMedical Office Type of Construction: Steel fi-ame 11. Has there been a previous application for a Special Permit from the Planning Board on these premises?Yes If so,when and for what type of construction?Intellisense Corp. obtained a Site Plan Review Special Permit on 1.7.97 for construction of a one story masonry building for software manufacturing and chemical labs ace. 12. Section of Zoning Bylaw that Special Permit Is Being Requested* NAZB Section 8.3 -(Site Plan Review Special Permit)and Section 10.3 (Special Permit Regulations) 13. Petitioner and Landowner signature(s): Every application for a Special Permit shall be made on this form, which is the official form of the Planning Board. Every application shall be filed with the Town Clerk's office, It shall be the responsibility of the petitioner to furnish all supporting documentation with this application. The dated copy of this application received by the Town Cler a Planning Office does not absolve the applicant from this responsibility. The petitioner shall be respon ibl for all expenses for filing and legal notification. Failure to comply with application requirements, a ci ed er in and in the Planning Board Rules and Regulations may result in a dismissal by the Planning B. rd o s pp ication as incomplete. Petitioner's Signature: s Print or type name here: JAcM 'ray, csi nt- a cr Development Corp. Owner's Signature: Print or type name here: Dave Murray,as Aut riz Agent for Intellisense Nom.Trust, 14. Please list title of plans and documents you will be attaching to this application. Plans: Site Development Plans Lot F-Flagship Drive North Andover, Massachusetts 01845 Dated: April 16,2001 Prepared by: MI-IF Design Consultants 103 Stiles Road--Suite One Salem,NH 03079 Sheets: 1-7 Reports,Attachments and filing fees • Drainage Report-Prepared by MHF Design Consultants,Inc. • Fiscal Impact Analysis Prepared by Huntress Associates,Inc. • Community Impact Analysis—Prepared by Huntress Associates,Inc. Page 3 of 3 Site Plan Special Permit Application • Traffic Impact Statement • Architectural Plans • Site Plan Review/Special Permit Filing Fee: $ 4,750-00 • Project Review Fees: $ 5,000.00 i Fiscal & Community Impact Report Site Plan Review Special Permit Application Ranger Development Corporation FISCAL AND COMMUNITY IMPACT REPORT i The following Fiscal Impact summary is provided as required by Section 8.3 paragraph 5 (xxii) of the North Andover Zoning Bylaw. In development of this fiscal impact summary we have used the projected values provided by the Urban Land Institute Development Impact Preview Model. Summary results also reflect information obtained in the Town of North Andover 2000 Annual Report, 1995 North Andover Community Profile, and site plan and architectural information provided by Ranger Development Corporation. Fiscal impact analysis generally refers to efforts to estimate the budgetary effects of various types of land uses on local governmental jurisdictions or other local service providers. There are many circumstances and situations for which a fiscal impact analysis might be prepared and a number of methodologies that might be employed. Since local government budgets are often influenced by numerous factors -- some directly related to land use and some not -- the seemingly simple question "What will be the effect of this development or land use on our taxes?" can raise complex issues. The following fiscal impact analysis addresses the impact of development activity on both sides of a governmental budget. Like a coin, municipal budgets have two sides: revenues and expenditures. The fiscal impact is the difference between the revenues and expenditures generated by the proposed development. This is sometimes more precisely referred to as the net fiscal impact. If revenues are greater than expenditures, a project or scenario is described as having a positive fiscal impact. Should expenditures exceed revenues, a negative fiscal impact results. And, if revenues and expenditures are equivalent, the impact is said to be neutral. The specific requirements of Section 8.3 paragraph 5 (xxii) of the North Andover Zoning Bylaw define the Fiscal Impact as "Projections of costs rising from increased demand for public services and infrastructure;provisions of benefits from increased tax revenues, employment and infrastructure improvements; and impact on adjacent property values. " PROJECT DESCRIPTION The property is located on Flagship Drive, and contains approximately 4.06 acres of undeveloped land bounded by Flagship Drive to the northwest; residential property to the south; office/industrial use to the east and west. The zoning on the property is split between Industrial Two (I-2) and Residential Two (R-2). The site is primarily undeveloped, consisting of open fields to the north and mature trees in the southwest portion of the site. The proposed project will entail the construction of a 72,000 sf office building with 16,250 sf of parking in a basement floor area. The building will be a maximum of 55' in height, and has been designed to compliment the style of the surrounding office/commercial architecture. In an effort to maximize open space, enhance on-site landscaping, and to work with the existing topography, the first level of the building steps in the hill and accommodates approximately 35 parking Page 1 of 5 04/12/2001 Fiscal & Community Impact Report Site Plan Review Special Permit Application j Ranger Development Corporation i spaces. The site will be serviced with municipal sewer, water, electric, and telephone and gas service. l.. PROJECTED COST OF CONSTRUCTION ■ Overall Building Program Ground Floor Parking Area 16,250 (not included in office program) First Floor 24,000 Second Floor 24,000 Third Floor 24,000 Total Office Program 72,000 square feet Engineering and Construction Costs Total Building Program /sf Estimated Construction Costs 72,000 square feet $94/sf $6,768,000.00 Land Acquisition N/A Site Development Costs 1,015,200.00 Architecture and Engineering Cost 120,000.00 Total Site Development Costs: $ 7,903,200.00 I i 2. ANALYSIS OF TAX REVENUES ■ Total Site Development Costs 7,903,200.00 ■ ULI Assessed Value Multiplier x 1.614 ■ Post Development Assessed Property Value $ 12,755,764.00 ■ Year 2000 Commercial Tax Rate 15.75/1000 ■ Estimated Real Property Tax Revenue/year $ 200_ 903.00 Page 2 of 5 04/12/2001 i' 6 I Fiscal & Community Impact Report Site Plan Review Special Permit Application Ranger Development Corporation 3. SHARED INFRASTRUCTURE COST ANALYSIS Local service provided Unit Unit Cost Quantity SUB-TOTAL ■ Water Provision per gal. $ 1.00 7173.40 $ 7173.40 ■ Sewage Treatment per gal $ 5.00 6169.48 $ 30,847.40 • Solid Waste Disposal per ton $ 200.00 72.35 $ 14,471.40 ■ Schools pupil each $4,249.00 n/a n/a j ■ Development generated capital costs $ 52,492.20 • Total Development—generated capital costs from taxes $ 52,492.20 ■ ULI Fiscal Impact Credit $ 25,115.89 • Equity Share $ 27,376.31 ■ Net Share Infrastructure Costs $ 0.00 Total Shared Infrastructure Costs $ 27,376.31 4. NET MUNICIPAL REVENUE/TOTAL MUNICIPAL FISCAL IMPACT ■ Estimated Real Property Tax Revenue/Year $ 200,903.00 ■ Total Shared Infrastructure Costs - 27,376.31 Net Municipal Revenue Generated by Real Property Tax _ $ 173,526.69 FISCAL IMPACT REPORT SUMMARY As demonstrated by the above calculations the project will have a positive fiscal impact. The completed project will create additional net surplus tax revenue and bring additional spendable income to area businesses. It is estimated that 72000 square feet of Class A office space will likely provide for over 240 employees, who will in-turn contribute to the local economy by purchasing goods and services at local area retailers and service providers. It is also likely that the proposed building will have a positive impact on surrounding property values. The architectural style is designed to compliment surrounding commercial/industrial uses and the additional improvements to circulation, streetscape and buffer areas will serve to enhance all surrounding properties. Other factors not associated with this development would ultimately determine the real or potential value of any property. The above Fiscal Impact summary is provided as required by Section 8.3 paragraph 5 (xxii) of the North Andover Zoning Bylaw. In development of this fiscal impact summary we have used the projected values provided by the Urban Land Institute Development Impact Preview Model. Summm-f results also reflect information obtained in the Town of North Andover 2000 Annual Report, 1995 North Andover Community Profile, and site plan and architectural information provided by Ranger Development Corporation. For additional information regarding site design, i Page 3 of 5 04/12/2001 i i i Fiscal & Community Impact Report Site Plan Review Special Permit Application Ranger Development Corporation architecture, traffic and landscape issues please refer to the full plans provided as a part of the Site Plan Review Special Permit application. COMMUNITY IMPACT REPORT The following Community Impact summary is provided as required by Section 8.3 paragraph 5 (xxiii) of the North Andover Zoning Bylaw, The specific requirements of the referenced section require an "analysis of the projects impact on the surrounding neighborhood in terms of architectural consistency; pedestrian movement and overall character; impacts on nearby historic structures or site; and an evaluation of the proposed projects consistency and compatibility with existing local and regional plans. " 1. ARCHITECTURAL CONSISTENCY As allowed by the NAZB, the building will be a maximum of 55' in height, and has been designed to compliment the style of the surrounding office/commercial architecture. In an effort to maximize open space, enhance on-site landscaping, and to work with the existing topography, the first level of the building steps in the hill and accommodates approximately 35 parking spaces. The site will be serviced with municipal sewer, water, electric, and telephone and gas service. For a complete description of proposed building please refer to the attached plans. 2. PEDESTRIAN MOVEMENT The propose site layout has been designed to minimize conflicts between pedestrians, cars and service vehicles. The layout accommodates a sidewalk and entry area that allows pedestrian to access the building without maneuvering through and around parked cars. The site plan also provides a direct means of access for service vehicles to the rear of the building, further eliminating any potential conflict. 3. OVERALL CHARACTER This property represents an undeveloped lot within a previously approved industrial and commercial subdivision. The character of the proposed building reflects the style and character of the surrounding commercial/industrial architecture, while appropriate efforts have been made to provide additional buffer to adjoining residential properties. All proposed mechanical and electrical services have been placed within the building, and site lighting shall be provided with a cut-off shield toward abutting residential properties. Page 4 of 5 O4/12/2001 V Fiscal & Community Impact Report Site Plan Review Special Permit Application Ranger Development Corporation 4. HISTORICAL BUILDINGS OR SITES This project is not in close proximity to any property or building having historic significance. There will be no impact to a historic site or building. 5. CONSISTENCY AND COMPATIBILITY The North Andover Master Plan and Zoning Bylaw allow for, and encourage, office and industrial development within this property. The proposed project is consistent with the current growth of the community and compatible with adjacent and proximate buildings. Page 5 of 5 04/12/2001 LIST OF PARTIES OF INTEREST SUBJECT PROPERTY Map PName Address 107C 23 1{ Intellisensc Corp. 16 Upton Drive, Wilmington, MA 01887 I ABUTTERS Map Parcel Lot NamAddress 107C 24 Champagne Realty Trust c/o L. Lyons 85 Flagship Drive,N. Andover,MA 10845 107C 76 Global Realty Trust David Murray 65 Flagship Drive,N. Andover,MA 10845 107C 75 C&P Realty Trust Leander Pease 31 Flagship Drive,N. Andover, MA 10845 107C 71 Walls Regulator Co. 815 Chestnut Street,North Andover,MA 01845 107C 22 Watts Regulator Co. 815 Chestnut Street,North Andover,MA 01845 107C 78 Electroplating Really Trust. 80 Flagship Drive,North Andover, MA 01845 107C 79 Stets&Co. LLC 70 Flagship Drive,North Andover, MA 01945 107C 45 Denise&Delray Smith. 79 Marion Drive,North Andover, MA 01845 107C 46 Edward&Nancy Condon Jr. 89 Marion Drive,North Andover, MA 01845 107C 67 Moltola Family Trust 53 Marion Drive,North Andover,MA 01845 107C 43 Jay-Gee Realty Trust 35 Marion Drive,North Andover, MA 01845 107C 72 Willows Condo Assoc. 865 Turnpike Street,North Andover,MA 01845 107C 26 Dianty A. Deassie 835 Chestnut Street,North Andover,MA 01845 johAndover sses s Office Certification Xate