NOTICE OF DECISION
Watershed Special Permit- Waiver
Date of Decision: April 25, 2023
Application of: Nicholas DeSantis
115 Dale Street
North Andover,MA 01845
Premises Affected: 115 Dale Street, North Andover, MA 01845, Map 37.13, Parcel 15,
within the R-1 zoning district.'
HISTORY AND BACKGROUND
On April 17, 2023 the applicant requested a waiver of the Watershed Protection District Special
Permit, in accordance with the North Andover Zoning Bylaw Article 4 Section 195-4,24. Waiver
of Special Permit, so as to allow construction of a new 22' x 17' deck within the Non-Discharge'
Buffer Zone. Wetlands are located approximately 130' away from the proposed land disturbance.
The project proposes eight 12" concrete footings to be installed 4' deep and does not require any
vegetation removal or regrading..
FINDING OF FACT
The Planning Board has made its decision based on the following findings:
• The scope consists of installation of eight concrete footings,
• No vegetation removal or regrading is required,
• A waiver of the Watershed Protection District special permit is requested, due to the
absence of an entirely impervious structure or expansion thereof and the limited land
disturbance (as indicated in Section 195-4.24 of the North Andover Zoning Bylaw),
CONDITIONS
• A 12' mulch sock, staked at 4' intervals, will be installed at the limit of work prior to
building permit issuance.
• As required per §195-4,24 Waiver of special permit on the Zoning Bylaw,the applicant
must schedule and agree in writing for the Town Planner to perform a minimum of two
inspections during the construction process to ensure proper erosion control is
established during construction,
• A copy of the recorded Notice of Decision shall be delivered to the Planning
Department prior to building permit issuance.
• The Applicant shall incorporate the following conditions as a,deed restriction and a
copy of the recorded deed restriction shall be submitted to the Town Planner and
included in the file.
AITEST,
A rh-Ut Copy
i
E
o Fertilizers are limited to those which are.either organic or slow-release nitrogen and
phosphorous-free.
o The use of coal tar-based pavement sealants is prohibited,
This decision must be filed with the North Essex Registry of Deeds, The following
information is included as part of this decision:
Plan titled. 115 Dale St—Porch and Deck Renovation
i
DECISION
After a Planning Board meeting on the above date, and upon a motion by J. Simons and 2nd by P.
Boynton a vote was taken with regard to a waiver of the Watershed Special Permit. The.vote was
4-0, unanimous in favor of the waiver.
how
On Behalf of rth Andov Planning Board
Eitan Goldberg
John Simons
Peter Boynton
Kelly Cormier
2
115 Dare St- Porch and Deck Renovation
Existing . House
Porch
Renovation
Existing
Conditions
(Misting Screened
in Parch Windows - -
Fxis9n9 Campositc '
Dock Flooring
ExisYnp Zx4
Forming.+a
insokdion." '
Porch
Ham
Renovation - °°°1a D�Dot tar --tch�d° I maeaad fghlmg,aulklz.and s,..
— AI finahn faduda 6aen 6oa�d him,slndox dday door
Proposed — �°kL'o¢Ir,,WDW yx low wda;dat al oft Ord nragWmmanb.
Plan
No Eam-'do -
• aeam roadaap.
°d cone lond"�np .
Rdmma and
Imld nn aGdfng
door
Wg oa4 Dow nor
s for new
Hang�'M ba.,d lording+dvD
and Plmlar a➢ Ir sonaluhes.4
NOIf and CCIIiagP they .
Rdmma and llmh
for mr w .
dndosa-
Retn and lfoah kold(3)21r W
for ms vinyl x 40 Conmant
v'k* - Wmdosa
►uWl(3)2r W -
x 4871 Ca"a
4fwdon
hutag R—.10
ImWaGoo an - -
' ad g and tlaora -
Iastd R-19
lanlolim an ag '
",a"eMaling R fM—and Iimh ertmior Woltr -
=1 almolhlnp rw am.vl
ors mntar wag. .
Rap—sHh nes sIndar
VmN - lmta>t(2
Co Wlnd°ss _ -
Rdmlall vbv +(1)Cantor -
cidng Dklam A'mdos
...............................
Proposed Deck Plan:
Hotm: _
17' x 22" �e� mpwEo dedaq* .
06 6eoonFin ow Hv rauq,-Ho
deck 1-16,91
10S °IOpa, -
(3J 210 B-m an and eex krdnq .
64 Poab rr'th
Po.t to Bean
US
Wg.6 pow mm
Srw v Boar - oourye!mr
Iw�ag+sfdpd .
r05 '
C W Stang r:th*0 gate -
f mB9.
(�-2:12 SSdogao$paced -
F2 0&
(8) Sorwt bee.4' 7S3U lndgar board 2x10 Jelat Hangers - -
OeeP with}'do lag as
ecren
ti-W SU.idh double
14gs gytw
M-202 5 x cane —
54dn9era spaced lorditrg
iZ'O.C.
..... ........... ............... .............. _. _._.. _.._._. _.._. _........ _... __. _._.. _.__ _.._ _.__. ........ ..........------- ...- .......-.. _.___ ...._..........................�
r
r .
}
{
tF
_ v �
��4..J���
1,2
oze-Ell � �a���
DECLARATION QFRESTRICTION
This Declaration of Restriction is made and entered into as of this 27'h day of April, 2023, by Nicholas
DeSantis and Amy DeSantis(hereinafter"the owners")of 115 Dale Street, North Andover, MA 01845,
the owners of a certain parcel of land located at 115 Dale Street, North Andover, MA 01845 with the
deed referenced in Book 17013 Page ZQ4.
WHEREAS,the owners have applied to the Planning Board of the Town of North Andover for a
Watershed Special permit;
VVHERAS,the owners agree,for themselves,their successors and assigns,that:
1. Fertilizers are||nn|ted to those that are either organic or slow-release nitrogen and phosphorus
free.
2. The use of coal tar-based pavement sealants is prohibited.
Signed aon sealed instrument on the date set forth above,
__
i
Anthony Crespo
Valley Construction Services, LLC
i
Building Permit: 71841
I
Project Address: 115 Dale St North Andover, MA
3
i
WAIVER OF SPECIAL PERMIT(195-4.24) 1
Hello,
I am writing on behalf of the contractor,Valley Construction Services LLC, to obtain a waiver of special
permit for watershed and wetland requirements.The proposed construction involves renovations to an
existing porch, and construction of a new deck.The deck is 130' away from the nearest wetlands. See
attached plans for more information.
Considering that the property is located within the Watershed Protection District, there is possibility to
obtain a waiver request for these special permits.
We request a waiver. In addition,we grant the town planner the right to perform a minimum of(2)
inspections during the construction progress to ensure proper erosion control is established during
construction.The Town Planner can stop construction if the proper erosion control is not in place.
Do not hesitate to call me if you have any more questions.
978-885-5518
Best Regards,
Anthony Crespo
RENEY, MORAN, & TIVNAN MORTGAGE IN�PEGTION PLAN
REGISTERED LAND SURVEYORS NAME NICHOLAS DESANTIS & AMY DESANTIS txi
75 HAMMOND STREET — FLOOR 2
WORCESTER, MA 01610-1723 LOCATION 115 DALE STREET
PHONE; 508--752-8885
FAX, 508-752-8895 NORTH ANDOVER MA �
RMT(*ISTGROUP.NET ,
A Division of H. S. & T. Group, Inc. SCALE 31 — 40 ' DATE 6/6 21
REGISTRY_ESSEX NORTH BEFO BOOK/PAGE 13865/53 �
BASED UPON DOCUMENTATION PROYIOEO, REDO€RED MEASURE-
MOM WERE MADE DF THE FRONTAGE MO BUILDING 5) SHOWN tN OF �5, PIJVI sooK/�u�x P 206
ON THIS MORTGAGE INSPECTION PLAN, IN OUR ,1UD IME TT ALL
VISIBLE BRUITS ARE SHOWN AND THERE ARE'NO VIOLATIONS a�
Or ZONING REQUIREMENTS REWOINQ STRUCTURES TO PROPERTY ci DAKL WE CERTIFY THAT IWE SUILDINO(S) ARE NOT WITHIN THE
LINES (UNLESS OTHERWISE NOTED IN DRAWING BELOW), SPECIAL FLOOD WARD AREA SEE FEMA ALAP;
NOTE: NOT DEFIN ARE ABOVECROUND POOLS DRl�y/AYS, o ..s
OR SHEDS WITH NO VUNOATIONS.THIS IS A MOYTICAGE -ny AN u1
INSPECTION POW; HOT AN INSTRUMENT SURVEY. 00 NOT USE TO 236F DTD 07-03--1 2
ERECT FENCES. OTHER BOUNQWY STRUCTURES, OR TO PLANT N • 40047
SHRUDS. LOCATION OF THE STRUCTURE(S) SHOWN HEREON IS EITHER FLOOD KAZAAD ZONE HAS BEEN DETERMINED UY SCALE AND
IN COMPLIANCE WITH LOCAL ZONING FOR PROPERTY LINE OFFSET Q
REQUIREMENTS. OR 15 EXEMPT FROM VIOLATION ENFORCEMENT �+� 15 NOT NECESSARILY ACCURATE. UNTIL OEFINMVE PLANS ARC
ACTION UNDER MASS. O.L. TITLE Ail. CHAP. AOA. SEC. 7, UNLESS 155UEp 9Y FEMA ANp/OR A VERTICAf CONTROL SURVEY IS
THEEABOVE CEATtnCATIUNSRMSE NOTED. THIS EARE MADE RTIFICATION WITH THE PROVISION THAT PERFORMED, PRECISE ELEVATIONS CANNOT DE DEMAMRIED,
THE INFORMATION PROVIDED 15 ACCURATE AND T14AT THE MEASURE--
MEWS USED ARE ACCURATELY LOCATED IN RELATSON TO THE
PROPERTY LINES.
'`Marked in red is the �r�)ased deck*
S�
Setback dist�anccs shown on drawing
i�ag
PORCH
rr I
WOUSE
115
r
1.
w
OFg
SHED
LOT:; 15
24.800 :
i
REQUE37'QiG 0M08:DAMORE LAZY DRAWN BY.DA
REQUESTED BY:
CHECKED BY:
115 Dale St- Porch and Deck Renovation
Existing House
Porch
Renovation
Existing
Conditions
feu}
F�iaGng Screened '
in Porch Windows
Existing Zoo. .
Oeck Flooring
Ec�sFing 24
Frvming.no
inwlaUoR
Porch i
Re n o v a `ion Netex rsrhb gl€ ts, rd nkctficvl xorlG
— W hoes board fdahm include h Cooed trim.rind.tdm,door
ud
Proposed — noWatlondiratabd paMCper lk—I code mogokements
Plan
N.C.ampoade
derJc lo��,
slope,ralGngs,
aid coot Imding
Ref—and
CvtoG—sMng
door
Dig and your new
.taiga for rsx
ploxter III 72'Sonotuhnn.44'
watts and .Wg Peep
Ralsmne and flmh
for� -aryl
xirdom
Rd—and fl In toU(X 2T W
fer—vinyl X 48'N f.0 ent
.ind— Windows
Dvte9(3)28'W
X 4$'N Cae8111ent
Windows
In.'I R-30
mTing crd floors
Inatcll R-1g
Irma llen on PC
Remove eXl9filg Rahome cnd flash wRehor Walls
rotted reCeathing _
sfaA. for new vinyl
ft
Rapldkitee xi1C rer Mod—
ZAP ah-Hung,
flmh oil saamo lnatall(2)
Cox Windore
Reimtall+nrp4 +(1)Canto
sd'mg P'ctr�re Wind.
Proposed Deck Plan:
2s1 s a Jamt:op—d
17' x 2 2' �m ha-ampaailr decking.i
hidden fasU ms
22' Ifk"�
Hmdcarpn Frog on 4.4
al b-= Nn Cnnrpoaib
deck landing,
InS' etepe,rolrmga.
(S)2-10 Beams on and coot landing
w Ponbs:dh
Pont to Boom
CannectD.
1.25'
1'
019 and pour nn
SUM poor w6a for nm
pk
EUnding+stops
)� boe SonONW.4•
P
1VS
4'w Sbairs wile Vmyl gate
+mTmga
(5—Z11Z WnWs Spoaed
It o.e
(a)—12'Sonotabm 4' 2cFu Ledger boats
2�w boat Nmgers
.0 i'diar log
as P+
eae.s
6'w Staip:'b 41.bl,
u"1 aaft
M-2,1Z Skin S'n Er
12'C.C. coot
eP londiag
3D Rendering of the Proposed Deck/ Porch Reno
III �ii�
12
Woo
............... ____ ---_ ___ .........._ .._....... .........._....... ............ _................ .............. .................. ...._........... ............. _.._.............. ..---...... ----_._.-_,..... _...--