Loading...
HomeMy WebLinkAbout2003-05-06 Legal Doc Site Plan Review & WSP 1 CONSTRUCTION CONTROL COMPLETION AFFIDAVIT PROJECT LOCATION: 20 Old Clark Street—North Andover,MA NAME OF PROJECT: 6,000 S.F.Pre-engineered Building Superstructure Review PROJECT NO: D 1086 SCOPE OF PROJECT: Verify building was erected in substantial compliance with the design documents. Res onsibility for the building design remains with Nucor.) T Jonathan M. Lon champ. P.E. of Daigle En ineers Inc. submit that our office has performed the following profes- sional services, as specified in Massachusetts State Building Code Section 116.2.2 and as related to the structural por- tions of the work: 1. Reviewed the construction for conformance to the design documents submitted by the owner/contractor. 2. Reviewed and approved the quality control procedures for all code-required controlled materials related solely to the superstructure. 3. Been present at the end of the superstructure construction to review the quality of the work and determine to the extent practical and possible the work was being performed in a manner consistent with the struc- tural construction documents. To the best of our information,knowledge, and belief, the structural work has been satisfactorily completed in substan- tial complia intent of the construction documents. V� Or SIP z��v HAT N ��`� c,.. kjr�� Signature:Si r LONGCHAMP g 51RMMPAL in �No. 35t;67 ¢ Massachuse/sReggistration No. 35 8 Our observat ons during site visits d*not relieve the Contractor or its subcontractors of their responsibilities and obligations for qual- ity control of the work,for any design work which is included in their scope of services(i.e.design delegation), and for full compli- ance with the requirements of the Construction Documents and applicable building codes. Furthermore,the detection of,or the fail- ure to detect,deficiencies or detects in the work during our site visits does not relieve the Contractor or their subcontractors of their responsibility to correct all deficiencies or defects,whether detected or undetected,in all parts of the work, and to otherwise comply With all requirements of the Construction Documents. NOTARY STATEMENT: Subscribed and sworn to before me this (� day of XITVY UBLIC ! O�COM�fl�ssi EXPIRES ON