Loading...
HomeMy WebLinkAbout2022-04-05 As-Built Plan and Constn. Certification Letter Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants June 14, 2023 Town of North Andover Planning Dept. 120 Main Street North Andover,MA 01845 Re: 229 Brentwood Circle, NA As-built plan & construction certification Planning Board members; Z am writing this letter to confirm that the approved work in the Watershed Special Permit Decision(recorded in Book: 17426 Page: 71 on 4/28/2022)has been constructed in substantial compliance with the decision and approved plan. An As-built plan prepared by Sullivan Engineering Group, LLC, dated June 14, 2023 is intended to accompany this letter. The owner completed the addition, drainage infiltration system, and associated site grading according to the approvals. Weekly inspections were conducted by this office throughout the project and monthly reports were provided to the Planning Department. The owner also prepared and recorded the Deed Restriction limiting fertilizer and pavement sealants (recorded in Book: 17426 Page: 81 on 4/28/2022). The site is fully stabilized by landscaped means and the grass growth has established at greater than 90%rats. A final inspection report for the site with a summary and site photos was provided under separate cover to the Planning Department. l would recommend that the Planning Board release the performance bond for this project. If you shouW have any ques ' equire additional information please feel free to contact me. Very Tru a 5U111M W 0CNX No. 41SU J an,P.E. �,�° Cc: Robert and Gena Hatch, Owners (via email) Enclosed: Site As-built Plan—229 Brentwood Circle dated June 14,2023 PO Box 2004 Woburn,MA 01888 781-854-8644 e-mail:jacksull53@comcast.net