HomeMy WebLinkAbout2022-04-05 Monitoring Reports Sullivan Engineering Group, LLC
Civil Engineers&Land Development Consultants
To: North Andover Planning Board
From: Jack Sullivan, PE
Date: June 14, 2023
e: 229 Brentwood Circle, NA —Watershed Special Permit
Construction Monitor — FINAL INSPECTION REPORT
Planning Board members and Town Staff,
In accordance with the Planning Board Special Permit issued April 5, 2022 for the above site I am serving as
the construction monitor for this project. This document is the final site inspection on June 14, 2023.
Final Inspection date: June 14, 2023
- All work completed
- Site is fully stabilized by landscaped means
- Grass has established> 90%
- No signs of site erosion
- A final Site As-built plan to be provided to the Planning Department
- A compliance letter to be provided to the Planning Department.
3 � �
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
a
_
m
N.
"ram y
�7
I
qp� s
` t 4
r
' .nr5 `
i a
g.
€ ,
�, �
d
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
F r.
F
_ r -
S.
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
4
ti
9'
4
4 t
r
�Y 3 ti
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
r x
u �
t
b
F 6 r
{
� J
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J*acksu1153@comeast.net
"aw
P.O. Box 2004 Wobum, MA01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
BERM _7_7 ,, t
III NINE 19
ease In
A
b�
f
m
wri
Y� b Yr
a a : .-,
�s + I.
� y
AVE
u #
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
r�
t
r i
�� -�„"`�" x ��� ?�� �:.` '`��,�- �- : ��,�� ��� w" fir^✓
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
Sullivan Engineering Group, LLC
Civil Engineers&Land Development Consultants
To: North Andover Planning Board
From: Jack Sullivan, PE
Date: November 23, 2022
e: 229 Brentwood Circle, NA—Watershed Special Permit
Construction Monitor —November 2022 monthly report
Planning Board members and Town Staff,
In accordance with the Planning Board Special Permit issued April 5, 2022 for the above site I am serving as
the construction monitor for this project. This document is the monthly report/photos for November 2022
Week of October 31 st, 2022 (Inspection on November 4, 2022)
- Siding installation continues
- Drywall installed in addition
- No outside work taking place
- Erosion barriers in good condition
- Drainage installation to take place next week
}
i
S
x
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
9
w.
5 ary.
v
r>r
w�=
2
v �
Ot
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
z
N
m�
.,�
u
Is
l-"` 'ice
u
" Y '6
s ,w' '. r
1
Eli is,
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
f
w
u;
i
�z
r
"
r�
�r
Fr.
r
e Sys
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
r
ti
v r
� 9
i
i
i
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
P E
r
k _
I
y
n
e
4w 3 F�
t
� z
r_
fi_"
t;
f P
v
i
r
r �
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Week of November 7th, 2022 (Inspection on November 11, 2022)
- Drainage field excavated
- Infiltrators and stone installed
- Siding completed
- Roof drains to be connected after drainage field backfill
- Erosion barriers in good condition
IV
n
r �
y
G
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
4 F�
3
t
? g
i
�r $
� t
M
"f
w
a�
a
9 U
10
r
'gp
M
r
a
z ,
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
@ �
r
M
2
�4 M
s
� ��
N h,
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
!S
✓51 � �
5
r
t n
F �
a
1
s
.wy 47,
.:,."
w.,
w
� a
qw
r.
v
F
- 4
a
..:
k
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
✓
s
� n e
� f Y
v„
c
- 5
V
r�
,
r .
r.
r
fr
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
r,
a
4
x /ru
z
4 a 3r 4
r^
G�
r zy
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Week of November 14th, 2022 (Inspection on November 18, 2022)
- Drainage field has been backfilled
- Roof drains are fully connected to drainage field
- AC condenser unit installed
- Work continues inside addition
t
ij If"-
914
ex Yatg,
Ad 12
0
NE
F
fi
? 1
� .
au'
� x k
u
u w' "-
m
w
a
y
1
r
r
a
n
� sad
ems.
eo
a
� t
-3
i
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
w.
_ w
w . M
31
oozy
x
c
. �. °'G
�.� � � � ems* %` � � �• � �� � _ Km° � ,
to
OR
NO 41
f
jgAwn M
w
'- .f 'fir
MOO eg
-
Aw
ow
�
x
r s
, �
- -- MJP
r
Win
s
u
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
w l $U�
no
moo
4{`
4 y
w "t ,
a # 4 s
. n 'yt}}2 t 2
u `` 1. Y ��Y �' � � cl�
TIP
00
Oc
t � kl&
f p4 �t� ��e � •� 2a4 1'y Q
fd 2
4t y
� M
�k�sf
j �,
i
r,
f r
a
e
r ,
k i
n 2 a
a
y
r
w s�-
r w
r,
x ..
s =I
N _ b
x,
4 .$
g w"
x
w
r
U
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
a
` l
? r
�a
s
r
iM> c
� r
77
00
IV
r
1 a.
POT
• "
�b
a
x^��o.:s�v�^''�v.�.-'mom —'.x+i^'•
v
N
�r
r
� a
4
� r
m
r c
s
a
w
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Week of November 21 st 2022 (Inspection on November 22, 2022)
- Outside work is completed for the season
- Recommend a straw mulch be placed over disturbed areas till outside
Work resumes in the spring of 2023.
r
w
N
a
611a
A5,>
s � �
e
.»
r
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
TO
4 2
�J
jK"
Mv,
P.O. Box 2004 Wobum, MA01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
w
e-
-_ ,.. '
y €'
3
r
v..� .
wNf
u �
2
� rz
'•�Yam. �;. :r N;; ' F;"'
r
r
w
- e �
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
WK
1
MAt '" T
r,
+'N�`-.^"e-=:,..xv"k`�'=---.•��"•J�'.� lam' `. ss�"� �'
�.�-w�a.�r::>r mow,..-:.a,�.�:, �: � �` " �''•-"_' �-'*�.- � �" 3,
r
Wm
s
U.
- may � .� �• �,: ��
�1
T
P�
r�
_413
„s
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
Sullivan Engineering Group, LLC
Civil Engineers&Land Development Consultants
To: North Andover Planning Board
From: Jack Sullivan, PE
Date: October 27, 2022
e: 229 Brentwood Circle, NA —Watershed Special Permit
Construction Monitor — October 2022 monthly report
Planning Board members and Town Staff,
In accordance with the Planning Board Special Permit issued April 5, 2022 for the above site I am serving as
the construction monitor for this project. This document is the monthly report/photos for October 2022
Week of October 3th, 2022 (Inspection on October 5, 2022)
- No outside work taking place
- Exterior of addition weathertight; windows in-place
- Electrical and mechanical underway inside
-`
may_
all
t
FA
ZVI
—Aate
rn'
. r }
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
r
Y:' p
�.t„„ R*.• �� dam. ..,� Y rig' t s
� 1
j MIN
gas gy
wy
zk
UNK
Mr " s e
��a a
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
r `
a
a
� yam-r ,,,,, �. � �, s" '�'•
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
a _ �
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J*acksu1153@comcast.net
Week of October 10th, 2022 (Inspection on October 14, 2022)
- Inspection took place after 1"rain event
- No outside work this week
- Mechanicals continue on addition
- Erosion barriers in good condition
- Site held up well to rain event; well drained; no erosion
d3r"i�a
� r
rR
r� 4 a�
s ,
4.
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
—_-- _ is
t
VIA
a �
Mi
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Y
u µ
t g ,
c
re
'? n ` k "
M' p, fl
e
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
a�
Cd
U
O
U
m
U
�t Lr)
'eP
4d 00
yy k t r a is w' \�
' li i �qq �n,�1 " s r -• uriioty a 00
00
00
1�
l. �1
tip ray
v r:
i t
Vp
�"" �, � •� 4t + � § �!���I 4�' a s„
rx
�� N
r,
f #,
r �
y - v
td ••3
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acicsu1153@comeast.net
x
Y' f
imam
oil said
7.
Nj
„zt Ft
r 'mro��``''
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Week of October 17th, 2022 (Inspection on October 21, 2022)
- Excess fill stockpile has been removed
- Loose fieldstone wall built upon a portion of the limit of work
- Mechanicals + electrical continues on addition
- Siding to be delivered next week to site
- Drainage work to take place in two weeks
�.
AT
d
„
„ � T
ax h l r
t rk
z+
r D,
6
h
}
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
L
v
/ n
1 �
:t
i 1
u
..
�.� v r may,
5 v
i
d
4
:
i
r
i
v
f
z
k
r.
k
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
:.�.�:� '�`,•,�.: ,...r,�` �,x ;, -: _ K �. .ter`� �,.'�-_�` �.,�'
z
yam
t r
9
4
r9
µ �
m
r F
A.
F
xr"
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
5
I
FA»mr
u
u
u
X
J k s
Mims
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Week of October 24th, 2022 (Inspection on October 27, 2022)
- Inspection took place after moderate rain event
- No outside work this week
- Siding has been delivered and will be installed next week
- Drainage work to start next week(drainage field)
- Erosion barriers in good condition
d
e
e.
ti=
r r
r
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
U
U
O
U
m
U
{yst 4`.d siV a tP3 'k C3
��
i, �" r f "N "t� ' �a`��# °,� n�"n�s*�',�� +F�a ley Gaffs'••.K �� ,. s ,,: f a:� +. `� h - i?--ii
f�,
ti � `"
q, , 'Y' y sas
is fie+ ��+b,
2t�craa tz,�. ��� {t`•r. .x},� �s 4S� t{°+..*�4g�� a"FGpt � N�.�j�.���kf tm � as .� e>:,a� h�'�5?�' t� sb ,*�° �,
t} �,r ;f. i i �. R 'i� 4 'pyy: y�s�, t �� ,.Y,� A { �. " tw'
of '_'s 5 s� i"7`w` 'f�a' ff §?n�
v^�f�"°Fr
Nil
00
00
s}akt
;v �da�t: 00
00
p ;9� a�,-. � �#���, t j��"r
AF
1
vikq
41
woi., ea cef e �et
az p�
On, � Ss All V
t � ra a
'f 711
I Ni!A
F " i O
t�ti � 3
!
ct t srt
W
�a e v�
�
i
Y.t.•I
a
a
a
3
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J*acksu1153@comeast.net
n
µ
v
G
f "
�µ
f
F
oF
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Sullivan Engineering Group, LLC
Civil Engineers& Land Development Consultants
To: North Andover Planning Board
From: Jack Sullivan, PE
Date: September 30, 2022
Re: 229 Brentwood Circle, NA—Watershed Special Permit
Construction Monitor — September 2022 monthly report
Planning Board members and Town Staff,
In accordance with the Planning Board Special Permit issued April 5, 2022 for the above site I am serving as
the construction monitor for this project. This document is the monthly report/photos for September 2022
Week of September 5th, 2022 (Inspection on Sept. 9, 2022
- Framing well underway
- Erosion barriers in good condition
- No signs of site erosion or silt building on erosion barriers
- Materials being staged in work area
x
a,.
�II I I
€f
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Y
w
f
t
i
r
i
I i iVV r i. I.
li I , illl I�
c
=i
F
� z
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
µ
t
�wr w
ti✓ .
�.s
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
r
x
v,
1
4
m
�z w
n
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
Week of September 12th, 2022 (Inspection on Sept. 16, 2022
- Framing continues/roof rafters installed
- Sheathing work underway on walls
- No site work taking place
- Erosion barriers in good condition
150
t
Yu
ff,
E �y
9'
�x
i
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
s
E"
= I
i
4
fi-
a` - d
ST f
� r r
r
r= A.
r,
r
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
r
T,
z a e
u
�x
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
=v . . w . . . . . .»
P.O. Box 2004 Wo um, MA 01888 Sl 854 8644 Dm62jacksu1153@comcast.net
Week of September 19t1i 2022 (Inspection on September 22, 2022)
- Inspection took place following 1" rain event
- Site was well drained
- No signs of erosion or silt migration
- Majority of framing completed; wall sheathing remains in spots
w
x
ry
n
_
mw
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
tr
,
c
r
7n
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
4
P
,Y
1 y
c=
a�m�
w
k
=,.
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
�i
t
N
w t
,.s
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
Week of September 26t1i 2022 (Inspection on September 30, 2022)
- Framing of addition completed
- Majority of windows installed
- No site work taking place
- Erosion barriers in good condition
Y
"
q d v�
t
i
t
� v
r ,
r
�ry
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
IJ
i
R
a
r
�p9
a.
� Y
i
Y
r -
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
f
a
� F
w
Fy
v
� r
P
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
a
r - -
µ
P
p�
N-
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Sullivan Engineering Group, LLC
Civil Engineers&Land Development Consultants
To: North Andover Planning Board
From: Jack Sullivan, PE
Date: September 7, 2022
Re: 229 Brentwood Circle, NA—Watershed Special Permit
Construction Monitor — August 2022 monthly report
Planning Board members and Town Staff,
In accordance with the Planning Board Special Permit issued April 5, 2022 for the above site I am serving as
the construction monitor for this project. This document is the monthly report/photos for August 2022
Week of August 1 st, 2022 (Inspection on August 5th, 2022)
- Backfill of foundation underway
- Request made to temporarily relocate mulch soxx to allow access to backfill far side of foundation
�I
k
+sY
u �
«s
5 �
a
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
r
r,
s
a
rya
&s ,. E _ -
:p -
IT
1
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
4-j
rn
v
0
U
M
N
+fiqq
16
t
00
t < Ok
00
40
� 4 �
s} NE`
P a
r00
N,j d kIll 00
ot 3
�IN
AM bg
a
It
lk
i
Week of August 8th, 2022 (Inspection on August 1 lth, 2022)
- Mulch soxx temporarily relocated which allowed foundation to be backfilled (90% complete)
- Lumber to be delivered next week
Mall
111 law!
s
z
w ,
N
a"
,.• '"',ate � ;� � � .r� a
4� 3
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
w
s
r
p�
i Ali
i
i
I i
I.
M
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
-
r
N.
a
9
w
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
U
O
U
M
U
�i
CIO
ti
T2 w{ t
40 C iiP
�x T� )7a1�4
00
00
00
1 °Y �#'�`Sfi# • � �Y. A '`� �Yx T+ pi $4 t � S� �
00
a
SEMI
Aa
tj-
�r sFr� a
}t; 1
Week of August 15th, 2022 (Inspection on August 18th, 2022)
- Foundation fully backfilled
- Labor delivered and stockpiled onsite
y
3
„
,
I
ta
^
^
a
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
A
r
r- �l
'f 5
Lo
�r 764,
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
J
s �
^r
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
a
€ s
ti
�F y
.r WC
:
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
_
u
,
r
Xa"
y
a
"
l a .
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
Week of August 22th, 2022 (Inspection on August 26th, 2022)
- Framing crew onsite
- Photo #1...asked contractor to pull back soil stockpile so no overtopping of soxx takes place
- Photo#4...some lumber stockpiled on wetland side of mulch soxx...told contractor via phone call to
Relocate lumber to construction side of mulch soxx.
T
jk F
g41
011,44
N
ji
n
s
s b f4y�a
0
y
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
r
T
�f
N
u
a i, "
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
r ,
r%
' -07 .rr
rr . RNx
r #
�r x,
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksull53@comcast.net
4or"
�jr
jowl
-re
P.O. Box 2004 Wobum, MA01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Week of August 29th, 2022 (Inspection on August 31 st, 2022)
- Photo #2 shows lumber from previous inspection on wetland side of mulch soxx has been relocated
- Framing of walls underway
- Photo #4 shows soil was moved back from mulch soxx from request made last week
- No signs of erosion; erosion barriers in good condition
17
,rn
r
lt�
n
F
P
�a.
r
c
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comeast.net
r
ro
¢P
r'
r ,
m
k r
r.
s.
1
OM
if
STD.
z.
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
x
y
:t
r
r
�r
n
r,
fiu �t
� � u
l
F
C'
a N�
r
n
a
X y
w
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
" " . $
ter, a
Pip
"Z
I
ry'
� r w
r �
r
3
2
a
r
Anewion
i
� err
AW
IS
r
,
r
.
'"' -.r Woup..' on As
r �
t
e
* OW
Mr
tol
-.
two �
a
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
ly
y ✓
r
f �
u
�sae� i I
r -
U-
w
s
r
G
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
Sullivan Engineering Group, LLC
Civil Engineers& Land Development Consldtants
To: North Andover Planning Board
From: Jack Sullivan, PE
Date: July 28, 2022
Re: 229 Brentwood Circle, NA —Watershed Special Permit
Construction Monitor— July 2022 monthly report
Planning Board members and Town Staff;
In accordance with the Planning Board Special Permit issued April 5, 2022 for the above site I am serving as
the construction monitor for this project. This document is the monthly report/photos for July 2022
Week of July 11t", 2022 (Inspection on July 14th, 2022)
- Foundation hole excavated
- Soil stockpile in photo #2 is temporary and being removed from site
- Erosion control in good condition
- Dry week; no signs of site erosion
Photos: (4 Total)
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
4
k� 3
M
.
�;� ��� „ �-s•' �� �` mac. �
e s
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
1 �
a
-ram
-
r
K
s
e
�T
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
x
V �+
s —
wa<
efip 5'
�C,a
n t.µ
3 es
r
�I
u
rt
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
Week of July 18t1i 2022 (Inspection on July 19th, 2022)
- Concrete footing installed
- Crushed stone being placed inside footing area
- Dry week; no signs of site erosion
Photos: (3 Total)
la-
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
s�
�,,,"�.. �..�� � � ro•'t au. # �4 �- ":.�-�§'� Y r i is
i
.tis„.L F
n v m
. if
F
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J*acksu1153@comcast.net
. w
�t
m
r
w3
n
t�
w �F�
r
I
w
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
Week of July 28t1i, 2022 (Inspection on July 25th, 2022)
- Foundation has been poured and forms removed
- Plumbing being inspected since it runs under new foundation
- Foundation to be backfilled next week
- Erosion barriers in good condition
Photos: (4 Total)
,r _
r
� F
t
F tav�� 4YY C
1v
-
. a
m
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
ti II
t'
r
r �
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comcast.net
F_
t
n
N
.h
ti ..�
� r
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
x _ r
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
� c
x
"7r
r.
xM
g,T F
x n
� r ^
-
'
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Sullivan Engineering Group, LLC
Civil Engineers&Land Development Consultants
To: North Andover Planning Board
From: Jack Sullivan, PE
Date: June 29, 2022
Re: 229 Brentwood Circle, NA —Watershed Special Permit
Construction Monitor —June 2022 monthly report
Planning Board members and Town Staff,
In accordance with the Planning Board Special Permit issued April 5, 2022 for the above site I am serving as
the construction monitor for this project. This document is the monthly report/photos for June 2022
Week of June 13, 2022 (Inspection on June 16, 2022)
- Watershed Special Permit Decision recorded in Book: 17426 Page 71
- Restriction on fertilizer use and pavement sealants recorded in Book: 17426 Page 81.
- Erosion control barriers in place
- The 4 trees permitted to be removed have been removed
- Exploratory soil testhole dug to confirm water table is below the proposed basement floor
Site Photos: 5
y�r
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:J'acksu1153@comeast.net
y
T
„4
tS
� x i
r
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
s ,
a
u z-
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
U
O
U
M
U
y f
h
1,t
coo
I It
tn
oc
00
M'O
a
k'
47,
}
v s a i r
.N.p, r,t�+r�'au
`SINE.
v
1
F
-
4
w
_ p
I
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksull53@comcast.net
Week of June 20, 2022 (Inspection on June 23, 2022)
No work this week
Site Photos: 3
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
P
W
s
s3
r
I
- r �
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
w
-
b
mx
v
r
-
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comeast.net
Week of June 27, 2022 (Inspection on June 29, 2022)
No work this week