HomeMy WebLinkAbout1999-02-17 Decision SPR 14AY. 3. 1999 2:01R1.1 tOUl,ST01�1 & STORRS 617 574 4112 NO. 75$$ P. 2/3
F. �� TO 574413'- P Gc. 0 a.02
Town of North Andover
OFFEM of �' , ••�'� 4, ' �._.
COMNftMTY DEVELOPMENT AND SERVICES � w
W1Li]aM J,SCOTIC North Andover,M&m=hm=01 S45 �►.,ss
,�irecmr
NOTICE OF DECISION
m
Any appeal shell be filler:.�t5emt.'yItz' w",�;"') a ;
within (20) days 2rl er'fihe��T�': r'` 41 A} '��,
date of filling this Notice o � o
in the mice of the Town Tam
--
Date_ pebtnzanr 17. 19�D9,�„W,--
Oate of Hearing 1/5/99, 2/9199, 2/16/99
Petition
of 4NE CI AM $'!`M11 , KOR H ANIIOVER, T�,� (
Promises affected one Clark stxeat
Referring to the above petition for special permit frorn the 'IPP 29 :+ 2;
requirementsofthe, N -th AWWQK zoning Bylaw Section 8_3
. r
so as to allow the cmatruction of an addIrrion to the *XiStia gbuilding 1*ca►ted �
at ona ciaxk Strut
After a public hearing given on the above date,the Planning Board �
voted t® agpro®e $he Site plan Rayiev - Special permit
based upon the following conditions:
i
CC: Director of Public Works Richard S-Rawen.ChalM n
Building Inspector
Natural Resource/Lard Use Planner Alison 1.®seem u.V.Chairman
Health Sanitmtian
Aases*ors ,tchn Simons,Clerk
Police Chief
Fire Chief Richard Nardella
Applieent
Engineer
Towns Outside Consultant
File Planning Board
interested Parties
�s�SY�►TiUP1'-(qr�S�953D iiPe��H-c� 9s�o ° PL,A[�Kit�•(�7�169S-s83S
�iAyliY.ili�O�CY.(�4BS•?3'r5,• �ZOIoP1I+ld Sowitn of aP'P'�.nt.s-(��.93a�t+ °lea�t S '1' '
i
1 Clark Street
Site Plan Review Special Permit
The Planning Board herein approves the Special Permit/Site Plan Review for the
construction of an addition to the existing building in the Industrial - 2 Zoning District.
This Special Permit was requested by Appledore Engineering, Inc., 600 State Street, Suite
D, Portsmouth, NH 03801. This application was filed with the Planning Board on
December 4, 1998,
The Planning Board makes the following findings as required by the North Andover
Zoning Bylaws Section 83 and 10.3:
FINDINGS OF FACT:
1, The specific site is an appropriate location for the project as it is located in an
industrial park and is zoned for industrial use.
2. The use as developed will not adversely affect the neighborhood as sufficient buffer
have been provided as well as conditions on the hours of operation, the location of the
HVAC units and other noise producing elements;
3. There will be no nuisance or serious hazard to vehicles or pedestrians;
4. The landscaping approved as a part of this plan meets the requirements of Section 8.4
of the North Andover Zoning Bylaw;
S. The site drainage system is designed in accordance with the Town Bylaw
requirements.
6. The applicant has met,the requirements of the Town for Site Plan Review as stated in
Section 8.3 of the Zoning Bylaw;
7. Adequate and appropriate facilities will be provided for the proper operation of the
proposed use.
Finally the Planning Board finds that this project generally complies with the Town of
North Andover Zoning Bylaw requirements as listed in Section 8.35 but requires
conditions in order to be fully in compliance. The Planning Board hereby grants an
approval to the applicant provided the following conditions are met:
SPECIAL CONDITIONS:
1. Prior to the endorsement of the plans by the Planning Board, the applicant
must comply with the following conditions:
1
o
a) The drainage consultant, and DPW have approved the final plan.
c) A bond in the amount of$10,000 shall be posted for the purpose of
insuring that a final as-built plan showing the location of all on-site utilities,
structures, curb cuts, parking spaces and drainage facilities is submitted.
The bond is also in place to insure that the site is constructed in accordance
with the approved plan. This bond shall be in the form of a check made out
to the Town of North Andover, This check will then be deposited into an
interest bearing escrow account.
2. Prior to the start of construction:
a) A construction schedule shall be submitted to the Planning Staff for the
purpose of tracking the construction and informing the public of
anticipated activities on the site.
b) All erosion control must be installed as shown the approved and endorsed
plans.
c) The applicant shall determine the preexisting conditions of the noise levels
emanating from the site are to determine the baseline noise conditions of
the site area. The noise survey will provide evidence of the origin of
surrounding noise and therefore a baseline condition from which the
applicant determine their increases. The noise levels shall not increase the
broadband level by more then 10 dB (a) above the ambient levels or
produce a"pure tone" condition as set forth in DAQC Policy 90-001, the
guideline for 310 CMR 7.10. The applicant may use relevant professional
sound emitting data from the prior building use to build a baseline based on
prior use of the building and grounds. References to sources for data must
be included in the material.
3. Prior to FORM U verification (Building Permit Issuance):
a) The final site plan mylars must be endorsed and three (3) copies of the
signed plans must be delivered to the Planning Department.
b) A certified copy of the recorded-decision must be submitted to the Planning
Department.
4. Prior to verification of the Certificate of Occupancy:
R
a) The applicant must submit a letter from the architect or engineer of the project
stating that the building, signs, landscaping, lighting and site layout substantially
comply with the plans referenced at the end of this decision as endorsed by the
Planning Board.
2
b) The landscaping must be planted as shown on Sheet 5 of the approved and
endorsed plans.
c) All lighting shall have underground wiring and shall be so arranged that all
direct rays from such lighting falls entirely within the site and shall be
shielded or recessed so as not to shine upon abutting properties or streets.
The Planning Office must approve any changes to the approved lighting
plan as submitted by the applicant,
d) The building must have commercial fire sprinklers installed in accordance
with the North Andover Fire Department,
5, Prior to the final release of security:
a) A final as-built plan showing final topography, the location of all on- site
utilities, structures, curb cuts, parking spaces and drainage facilities must
be submitted to and reviewed by the Planning Stan'and the Division of
Public Works.
6. Any stockpiling of materials (dirt, wood, construction material, etc,) must be
shown on a plan and reviewed and approved by the Planning Staff, Any approved
piles must remain covered at all times to minimize any dust problems that may
occur with adjacent properties. Any stock piles to remain for longer than one
week must be fenced off and covered.
7. In an effort to reduce noise levels, the applicant shall keep in optimum working
order, through regular maintenance, any and all equipment that shall emanate
sounds from the structures or site.
S. No HVAC equipment or other equipment that will emanate noise-exceeding levels
cited herein shall be placed on the exterior of the structure. Such equipment shall
be enclosed as shown on the plans.
9. All site lighting shall provide security for the site and structures however it must
not create any glare or project any light onto adjacent residential properties.
10. The hours for at least 75% of the traffic associated with trucks entering the site for
shipping, receiving and waster hauling shall be limited to between the hours of
7:00 am and 7:00 p.m. Monday through Saturday,
11, Any plants, trees or shrubs that have been incorporated into the Landscape Plan
approved in this decision that die within one year from the date of planting shall be
replaced by the owner,
3
t
12. The contractor shall contact Dig Safe at least 72 hours prior to commencing any
excavation.
13. Gas, Telephone, Cable and Electric utilities shall be installed underground as
specified by the respective utility companies. Utilities may be installed above
ground where sub-surface conditions do not permit such installation. Evidence of
such must be provided by the applicant.
14. No open burning shall be done except as is permitted during burning season under
the Fire Department regulations.
15. No underground fuel storage shall be installed except as may be allowed by Town
Regulations.
16. The provisions of this conditional approval shall apply to and be binding upon the
applicant, its employees and all successors and assigns in interest or control.
17. Any action by a Town Board, Commission, or Department that requires changes in
the plan or design of the building as presented to the Planning Board, may be
subject to modification by the Planning Board,
18. Any revisions shall be submitted to the Town Planner for review. 1f these revisions
are deemed substantial, the applicant must submit revised plans to the Planning
Board for approval.
19. This Special Permit approval shall be deemed to have lapsed after two years from 21i9 C-2c
the date permit granted unless substantial use or construction has commenced.
Substantial use or construction will be determined by a majority vote of the
Planning Board.
20. The following information shall be deemed part of the decision:
21. Plan titled: North Andover Commerce Center
Sitework Approval Drawings
Clark Street
North Andover, NIA 01845
Prepared for: One Clark North Andover, LLC
121 Middle Street
Portland, Maine 04101
Prepared by: Appledore Engineering, Inc.
600 State Street, Suite D
Portsmouth, NH-03801
4
J y
Dated: December 4, 1998 ,
Revised: February 9, 1999
Sheets: 1 through 10
b) Report: Drainage Study
for North Andover Commerce Center
Clark Street
North Andover, MA 01845
Prepared for: One Clark North Andover, LLC
121 Middle Street
Portland, Maine 04101
Prepared by: Appledore Engineering, Inc.
600 State Street, Suite D
Portsmouth, New Hampshire 03801
Revised: January 20, 1999
Dated: December 4, 1998
22, The applicant may construct only the parking spaces on the northern side of
Clark street adjacent to the building until such time as the use of the.
property requires the construction of the remaining spaces located on the
southern side of Clark Street. The applicant shall notify the Planning Board
in writing of their intention to expand into the other parking area prior to
the construction of the spaces.
cc. Director of Public Works
Building Inspector
Health Administrator
Assessors
Conservation Administrator
Planning Board
Police Chief
Fire Chief
Applicant
Engineer
File
Lot 1-2B-1 Orchard Hill Road - Site Plan Review
5