D - p Memo
To: Heidi Griffin ,Town Planner
From: Lt.Andrew Melnikas
CC:
Date. 8/30/01
Re: Peter Hingorani project...Berry St.
Chief Dolan and I have discussed this project and we feel that an additional fire hydrant needs to be
added at the rear of the proposed building . Please call me should there be any questions
Sincerely,
Chief William Dolan
To: Heidi Griffin; Jack! Byerley
Cc: TRUSTCORP@AOL.com
Subject: Merrimac Office Building- Rte. 114
I met with Mr. Peter Hingorani this afternoon to discuss his proposed building on Rte. 114.
The two issues we addressed were with regards to the direction given to him regarding fire protection.
1. Ability to access the building height-the fire department will be able to access this building using the aerial
ladder we aerial we have at Station 2. This arial remain with the department and will be in service for use when this
building. The fire department has no issues with the sixty-four foot height proposed sixty feet of building and four feet of
parapet.
2. The twenty-five foot of access road on the site needs to remain intact for fire department access to the
building and for establishing a setup should an incident occur. Each of our vehicles is nine feet wide but we need room
to set up the aria[ device and other equipment. The stabilizing jacks for the ladder extend to nine feet on each side when
fully extended.
We are satisfied with the plan and proposal presented by Mr. Hingorani and we thank you for your consideration of fire
protection for the building and its occupants.
If there are any questions please contact either Lt. Melnikas or me,