HomeMy WebLinkAboutConstruction Notes - Consultant Review - 125 BOSTON STREET 8/1/2023 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 125 Boston St MAP: 107B LOT: 43 INSTALLER: Chad Jablonski DESIGNER: Clayton Morin PLAN DATE: 11/4/22 BOH APPROVAL DATE ON PLAN: 11/10/22 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 03.15.2023 DATE OF FINAL CONSTRUCTION INSPECTION: 3/27/23 – I. DaRowe DATE OF FINAL GRADE INSPECTION: 6/14/2023 SITE CONDITIONS N/A Contractor reports any changes to design plan N/A Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: Existing septic tank remained from recent installation SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction / 2-piece (circle one) If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle / effluent filter installed (circle one) If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum ___ inch diameter Pipe penetrations appear watertight using rubber boots / hydraulic cement (circle one) Comments: Existing septic tank remained from recent installation. New 4” PVC pipe was connected about 4’-6’ after the outlet end of the septic tank. DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box N/A Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header (and vented if impervious material above) N/ARetaining wall material, location and height if specified on plan Comments: SOIL ABSORPTION SYSTEM (Other) FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: Brian LaGrasse - completed DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 103.42 HR = 1.65 HI = 105.07 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT Existing Septic Tank IN Existing Septic Tank 6.79 97.93 97.37 OUT Distribution Box IN 6.89 97.83 97.77 Distribution Box OUT 7.05 97.67 97.60 Lateral 1 BEGINNING 7.10 97.62 97.50 Lateral 1 END 7.24 97.48 97.35 Lateral 2 BEGINNING 7.10 97.62 97.50 Lateral 2 END 7.25 97.47 97.35 Lateral 3 BEGINNING 7.05 97.67 97.50 Lateral 3 END 7.26 97.46 97.35 Lateral 4 BEGINNING 7.08 97.64 97.50 Lateral 4 END 7.26 97.46 97.35 Bottom of Bed 8.18 96.89 96.85