HomeMy WebLinkAbout2022-07-27 Machine Shop Village Neighborhood Conservation District Commission Minutes Machine Shop Village Committee
7/27/2022
Present board member: Harry Azonian , Tim True , Bernard Zelitch, Justin Lafond
6:41 pm - J. Lafond calls the meeting to order, seconded by T. True. H. Aznoian makes motion
to change the order switching agendas 2 & 3, AT&T & 22 Bixby Avenue. Change granted by
applicants.
Application 1 - 43 High Street
Applicant- Sally Finnimore of The Village Studio
6:43pm - Motion to open meeting for 43 High Street
Application presented to replace old awning, over entrance door, with same size and color
awning with graphics logo. Use of Sunbrella brand was specified.
6:45pm motion to approve 56x24x30 with 5" high valance awning. Voted 3-0 in favor.
Application approved.
Application 2 - 70 Elm Street
Applicant- AT&T
6:47pm - Motion to open 70 Elm Street.
Applicant presents change to take radios/equipment out of the equipment cabinet and use lower
profile, gray boxes instead.
6:52pm - Motion to approve application CRAN_RCTB_NAND_02 as presented in standard gray.
Voted 3-0 in favor. Application approved.
Application 3 - 22 Bixby Avenue
Applicant- HiTech
6:58 Motion to open meeting for 22 Bixby Avenue
Discussed window casing wrap, front double-hung/picture window/double-hung, adding door
casing with small pediment at top. Fascias will have contoured aluminum wrapping to maintain
profile. The wrap will be gauged and will cover the existing. Shutters will be in the front only,
gutters will be replaced with white and corner boards will be 3 %2" vinyl, color-matched corners.
7:30pm - H. Aznoian makes a motion to approve to:
- Strip the existing siding
- Install Certainteed Cedar Impressions on front and Monogram 4" clapboard siding on
sides and rear.
- New Lower level bow window to be replaced with DH/PW/DH with 4 over 4 grids on DH
sections with muntins inside the glass. Window will project as flat.
- 2 pair louvered shutters on front.
- Reinstall new pediment to extend 4" beyond front door casing.
- Window and door casings to be wrapped in wood grain aluminum
- Soffits and fascias to be gauged and wrapped in aluminum.
- Vinyl soffits on all areas
- Front gable vent to be removed.
- 3 %2", color matched corners
All vote in favor 3-0. Application approved.
7:49pm - H. Aznoian motions to adjourn meeting. Seconded by T. True.
Meeting adjourned.