Loading...
HomeMy WebLinkAboutFull Septic Repair - Construction Notes - Consultant Review - 42 JAY ROAD 8/22/2023 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 42 Jay Road MAP: 98A LOT: 4 INSTALLER: John Butt DESIGNER: Vladimir Nemchenok PLAN DATE: 1-10-23 BOH APPROVAL DATE ON PLAN: INSPECTIONS TANK INSPECTION: 05.24.2023 — B. LaGrasse DATE OF BED BOTTOM INSPECTION: 06.06.2023 — B. LaGrasse DATE OF FINAL CONSTRUCTION INSPECTION: 6/21/23 — I.DaRowe DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS N/A Contractor reports any changes to design plan ® Existing septic tank properly abandoned, if present ® Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: SEPTIC TANK ® Building sewer in continuous grade, on compacted firm base N/A Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ® Tank size and loading per plan ® Monolithic tank construction ® If monolithic, water tightness of tank has been achieved by visual testing N/A If 2-piece, water tightness of tank has been achieved by water/vacuum test (circle one) ® Inlet tee installed, centered under access port ® Outlet tee installed, centered under access port ® effluent filter installed ® If effluent filter, riser to finished grade over filter ® Riser with cover to within 6" of finish grade installed over one access port ® Manhole and riser minimum 24 inch diameter ® Pipe penetrations appear watertight using rubber boots Comments: 24" C.I. cover to within 6" of finish grade above inlet, 24" C.I. cover to finish grade above outlet— I.DaRowe Tank Base inspection 05.24.2023. All set to install tank and excavate field—B. LaGrasse DISTRIBUTION-BOX ® Installed on stable stone base ® H-20 D-Box N/A Inlet tee (if pumped or >0.08'/foot) ® Hydraulic cement around inlet & outlets ® Even distribution observed ® Schedule 40 PVC Pipe Comments: H-10 D-Box was installed instead of H-20 D-Box. Installer will contact the designer to review if replacing cover with a H-20 cover is an option — I.DaRowe 6-22-23 — Designer forwarded photograph of H-20 D-Box cover installed at this site SOIL ABSORPTION SYSTEM (General) ® Bottom of SAS excavated down to specified soil layer, as provided on plan ® Size of SAS excavated as per plan ® Sand installed, if specified on plan ® Sand displays few fines when handled ® 40 Mil HDPE barrier installed, if specified on design plan ® Laterals installed and ends capped or connected to header (and vented if impervious material above) N/A Retaining wall material, location and height if specified on plan Comments: Bed was 35 x 60 Excavated A + B. no rocks over 6" looked good. Sand inspected 6.7 .2023 Looks good. B. LaGrasse BM = 100.00 HR = 1.51 HI = 101.51 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 4.38 96.78 97.3 Septic Tank IN 4.55 96.61 96.65 Septic Tank OUT 4.88 96.28 96.40 Distribution Box IN 5.43 95.73 95.70 Distribution Box OUT 5.58 95.58 95.53 Lateral 1 BEGINNING 5.78 95.38 95.45 Lateral 1 END 6.01 95.15 95.20 Lateral 2 BEGINNING 5.75 95.41 95.45 Lateral 2 END 6.01 95.15 95.20 Lateral 3 BEGINNING 5.76 95.40 95.45 Lateral 3 END 6.01 95.15 95.20 Lateral 4 BEGINNING 5.73 95.43 95.45 Lateral 4 END 6.01 95.15 95.20 Lateral 5 BEGINNING 5.73 95.43 95.45 Lateral 5 END 6.01 95.15 95.20 Lateral 6 BEGINNING Lateral 6 END Bottom of Bed 6.83 94.68 94.70 FINAL GRADE �] Final cover as per plan Loamed Seeded [� Cover per plan Comments: B. LaGrasse completed 08.02.2023 DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by 6/ 9. /��� � Ms /P,r designer and installer 66 �'- As-Built Plan by designer