HomeMy WebLinkAbout123 Bonny Lane - NACC #312 Small Project - Permits #NACC #312 - 123 BONNY LANE 8/23/2023 CONSERVATION DEPARTMENT
Community & Economic Development Division
Adrian Dawson
1.23 Bonny Lane
North Andover, MA 01845
A&A Building and Remodeling
2750 Main Street
South Chatham, MA 02659 August 29, 2023
1.23 Bonny Laney North Andover
Second Story Window Replacement
Conditions of Approval, NACC #31.2
Pursuant to section 4.4.2 of the North Andover Wetlands Protection Regulations, A&A Building
and Remodeling, the contractor for 123 Bonny Lane, filed for a Small Project permit application
for work proposed at this address. The work involves: the installation of a very large second
story picture window on the lake side of'the house, which will replace existing windows in that
location. Two new 16" diameter bigfoot footings will be installed, by hand, to provide the
necessary load bearing support for the new window. The only ground disturbance for this project
will include advancing the footings within the existing patio area, and underneath the elevated
deck. The window will beinstalled via crane operated from the paved driveway. The closest.
footing will be approximately 96 feet from the intermittent stream bank to the West, and
approximately 86 feet from the bordering vegetated wetland associated with Lake Cochieliewick.
to the South.
During the August 23, 2023 public meeting, the North Andover Conservation Commission
(NACC) found this project to qualify as a Small Project Permit and voted unanimously to
approve this project as proposed under C;`ategoiy "L" (alter similarlwgjects of ininiinal iny)act,
as determined by,the North At drier Conservation Co nrnaission, subject to compliance with the
conditions listed below. The project is approved only as it relates to the Conservation
Commission and any and all other approvals should be obtained by the applicant/homeowner.
All work shall conform to the following:
123 'Bonny Lane—Small Project Permit Approval Category L
Page 1 of 2
RECORD DOCUMENTS:
• Small Project Filing Including application checklist with supporting narrative and
attachments, received 08-16-2023
• Annotated GIS aerial map showing distance from resource area
• Phelan Engineering Window replacement plan details signed & stamped by Paul A.
Phelan dated May 16, 2023
T lie following conditions are hereby mandated:
CONDITIONS:
I. If any changes are made to the project or to the means and methods ol-accornplishing the
work, the contractor shall alert the Conservation Department prior to implementation in
the field to review and discuss same. The Conservation Department shall have the
discretion to consult with the Chair or the Commission on any changes that may require
additional review.
2. Post-construction inspection shall be scheduled with the Conservation Department to
verify compliance.
3. This permit shall expire one year from the date of issuance.
The applicant, homeowner and their contractors are advised that NO other work on the
property is allowed under this permit. The NACC has jurisdiction over all of the wetlands and
associated 100-Foot buffer zones on site and any work that involves ground disturbance or
changing the current conditions in these areas will require permitting with the NACC. This
includes, but are not limited to, house additions, cools,..,p,patios,,decks, sheds fences garden beds,
.....................
landscapi
ng runing. These activities shall be
held to the current standards under the Bylaw and the WPA. **
Should you have any question or comments regarding the contents of this letter, please do not
hesitate to contact the undersigned at (978)-688-9530. Thank you for your anticipated
cooperation with this matter.
Respe, 'illy,
'po idly,
No T AND)O7VCONSERVATION DEPARTMENT
AAimyR. axner
Conservation Administrator
123 Bonny Lane—Small Project Permit Approval Category 1,
Page 2 of 2