HomeMy WebLinkAboutAddendum to Drainage Study 1999 ADDENDUM TO
DRAINAGE STUDY
FOR
NORTH ANDOVER COMMERCE CENTER
CLARK STREET
NORTH ANDOVER, MASSACHUSETTS
January 20, 1999
Prepared For: '
One Clark North Andover, LLC
121 Middle Street
Portland, Maine 04101
Prepared By:
Appledore Engineering, Inc.
600 State Street, Suite D.
Portsmouth, New Hampshire 03801
(1275-ds'i.doc)
North Andover Commerce Center
Clark Street
North Andover, Massachusetts
TABLE OF CONTENTS
1.0 Summary
2.0 Calculation Methods
3.0 Pre-Development Condition
4.0 Post-Development Condition
Appendix A: Supporting Calculations
Pre-Development Calculations
Post-Development Calculations
Post-Development On-site Structure Analysis
Appendix B. Charts, Etc.
North Andover Commerce Center Table of Contents
Clark Street
North Andover, Massachusetts
1.0 - SUMMARY
This Drainage Study was completed to assess the pre and post-development runoff
rates for the proposed development and to assess the proper function of the detention
pond used to mitigate adverse impacts of runoff and sediment due to development.
2.1 - Pre- and Post-Development Flow Comparison:
All of the runoff from the impervious areas currently enters a closed drainage system
and discharges directly the wetland along the northern property line. Almost all of the
post development runoff will enter a constructed wetland prior to discharging to the
wetland. This constructed wetland will provide stormwater treatment as well detention
to mitigate peak flows. Table 1 compares pre and post-development peak runoff rates
for the 1-year, 2-year, 10-year, and the 100-year storm events. As detailed in Table 1
the drainage system has been designed to reduce the post-development runoff rate for
all four stormwater events. Due to the significant development on the existing site and
the reduction in building footprint, very little detention is required.
TABLE 1
COMPARISON OF PRE- AND POST-DEVELOPMENT FLOWS
STORM EVENT (cfs)
CONDITION 1-YR 2-YR 10-YR 100-YR
Pre-Development 20.56 26.07 44.26 69.40
Northerly Property
Line
Post-Development 14.30 20.40 37.45 60.03
Northerly Property
Line
North Andover Commerce Center Summary
Clark Street
North Andover, Massachusetts
2.0 - CALCULATION METHODS
The design storms analyzed in this study are the 1-year, 2-year, 10-year, and 100-year
storm events. The Soil Conservation Service TR20 model(') was utilized to predict the
peak runoff rates from these storm events. A Type III storm pattern was utilized in the
model.
The time of concentration was computed utilizing the TR55 time of concentration
worksheets.
Drainage structures were sized for the 25-year storm utilizing peak run off rates from
the TR-20 method. Structure Subcatchments were identified and stormwater flows
were routed through the system. Hydraulics calculations for the drainage structures
were analyzed for inlet and outlet control, maximum headwater and discharge velocity
for the 25-year storm event using a computer program entitled "Dodson Hydraulics
Library"(3)
References:
1. Microcomputer Implementation of the Mainframe Fortran Program: TR-20,
Project Formulation Hydrology, by Soil Conservation Services, distributed by
Haested Methods, Waterbury, CT.
2. Massachusetts Department of Environmental Protection, Stormwater
Management Policy, Volume 1, and 2.
3. The Dodson Hydraulics Library, 1987, Dodson & Associates, Houston, TX
I
North Andover Commerce Center Calculation Methods
Clark Street
North Andover, Massachusetts
3.0 - PRE-DEVELOPMENT CONDITION:
The pre-development condition is characterized by one (1) catchment area. This
watershed is depicted on the Pre-Development Watershed Plan attached to this
report.
North Andover Commerce Center Pre-Development Condition
Claris Street
North Andover, Massachusetts
4.0 - POST-DEVELOPMENT CONDITION
The post-development condition is characterized by three (3) watershed areas. The
post-development analysis will allow for a direct comparison between the pre- and
post-development peak runoff rates to assess the impact of the project, The three
(3) watershed areas are depicted upon the attached Post-Development Watershed
Plan.
North Andover Commerce Center Post-Development Condition
Clark Street
North Andover, Massachusetts
APPENDIX A
PRE-DEVELOPMENT
CALCULATIONS
•:*r++**x*iYxxx*********#rrr+++Yxx***##rxii+++******.+:xrr+++}+++r+++YY}*YY*
i TR 20 5/N
* HMVersion 3.40
`1'R 24 * ➢ate 1/19/99
* Time 10;11:12
Project Formulation Hydrology * Input file 1275PRE.IN
* Output file 1275PRE.OUT
x
}
xxxxxxx xxxxxx xxxxx xxxxx
x x x x x x xx
x x x x x x x
x xxxxxx x x x x
x x x x x x x
x x x x xx x
x x x xxxxxxx xxxxx
Full Microcomputer implementation
by
Haestad Methods, Ina,
37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666
LIST OF INPUT DATA FOR TR--20 HYDROLOGY****************** '..
TR--2 0 SUMMARY '.
'LE 1275 N. ANDOVER
'LE PRE-DEVELOPMENT
RAINFL 7 .25
0.0 .0025 .005 .0075 .010
.0125 .015 .0175 .020 .023
.026 .0285 .031 .034 .037
.040 .043 .0465 .050 .0535
.057 ,0605 .064 .068 .072
.076 .080 .084 .089 .094
.100 .107 .115 .122 .130
,139 .148 .157 .167 ,178
.189 .202 .216 .231 .250
.271 .298 .345 .500 .655
.702 .729 .751 .769 .785
.798 .611 .823 .834 .844
.653 .862 .870 .878 .8B6
.893 .900 .906 .911 .916
.920 .924 .928 .932 .936
.940 .944 .9475 .951 .954
.957 ,960 .963 .966 .969
.972 .975 .978 .981 .9835
.986 .9885 .991 .9935 .996
.998 1.000 1.00 1.00 1.00
ENDTBI,
RUNOFF 1 001 1 0.03154966 84.8 0,1792
ENDATA
INCREM 6 0.1
COMPUT 7 001 001 0.0 2.6 1,0 7 2 01 01
ENDCMP 1 '..
COMPOT 7 001 001 0.0 3.1 1.0 7 2 01 02
ENDCMP 1
COMPUT 7 001 001 0.0 4.5 1.0 7 2 01 10
ENDCMP 1
COMPDT 7 001 001 0.0 5.3 1.0 7 2 01 25
RNDCMP I
COMPUT 7 001 001 0.0 6.4 1.0 7 2 01 99
ENDCMP 1
ENDJOS 2
r**++*+x+++++++++++**rrrxr***END OF BO--80 LIST***txx*++++*x*rxrr+++x++xx++++++
:0 XEQ 1/19/99 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 4
4MARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
(A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CPS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION MARK(?) INDICATES A BYbROORAPH WITH PEAK AS LAST POINT.)
-TION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
MJCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
ALTERNATE I STORM 1
HCTION 1 RUNOFF .03 7 2 .10 ,0 2.60 24.DO 1.25 ------ 12.25 20.5E 651,6
ALTERNATE 1 STORM 2
F.CTION 1 RUNOFF .03 7 2 .10 .0 3.10 24.00 1.66 ---- 12.25 26.07 826.3
ALTERNATE 1 STORM 10
ECTION 1 RUNOFF .03 7 2 .10 .0 4.50 24.00 2.90 --- 12.23 44,2E 1403.0
ALTERNATE 1 STORM 25
ECTION 1 RUNOFF .03 7 2 ,10 .0 5.30 24.00 3.64 --- 12.22 =
1737.9
ALTERNATE 1 STORM 99
ECTION 1 RUNOFF .03 7 2 .10 .0 6.40 24.00 4.67 --- 12.21 E69.40) 2199.6
o xEQ 1/19/99 N. ANDovER
JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 5
MARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES POR ALL STORMS AND ALTERNATES
CTION/ DRAINAGE
UCTURE AREA STORM NUMBERS. .........
D (SQ MI) 1 2 10 25 99
ECTION 1 .03 '...
ALTERNATE 1 20.56 26,07 44.26 54.83 63,40 ',.
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
PRE-DEVELOPMENT WATERSHED #1
CALCULATED BY: BM
CHECKED BY: BM Tc = 1.67L^0.8 1 0001CN -9 ^0.7
DATE: JANUARY 18, 1999 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUPC WOODS,GOOD 70 22,50 1575.00
GROUP C LAWN,000D 74 22.10 1635.40
GROUP D WETLAND 80 8.90 712.00
IMPERVIOUS PAVEMENT 98 25.40 2489.20
IMPERVIOUS sUILDiNG 98 21.10 2067.80
TOTALS = 100.0 88479.40
USE GN
POST-DEVELOPMENT WATERSHED
AREA= 0.03154966 Square Miles
CN = 84.8
L= 1,704 Ft.
S = 4.80 %
Worksheet 3: Time of concentration (Tc) or travel time (Tt)
BY Date
Checked Date _
Location
Circle one: resen Developed
Circle one: Tc TC through subarea
NOTES: Space for as many as two segments per flow type can be used for each
worksheet.
Include a map, schetsatic, or description of flow segments-
Include
to T only) Segment ID
Sheet flow (App c
1. Surface description (table 3-1) .•
U _
2. Manning's roughness coeff., n (table 3-1) '••
3. Flow length, L (total L < 300 ft)
f r- �CaO
in
4. Two-yr 24-hr rainfall, P2 .. . .........'•"..
�•
5. Land slope, s ..... '•
. ft/ft f�Z
0.8
hr � •C�ZC1` C2�
0.007 (nL) Compute, T
6. Tt P 0.5 s0.4 t
2
Segment ID
Shallow concentrated flow
p (paved or unpaved) ..••• �� � ri1 lX
7. Surface description (p //
8. Flow length, L ..•......r..s............•... ft ` ��
ft/ft
9. Watercourse slope, S
V (figure 3-1) ....... ft/s
10. Average velocity,
L Compute Tt hr l/�5 CJ y
11. TC 3600 V
Segment IA
Channel flow
12. Cross sectional flow area,
a ft2
13. Wetted perimeter, pw ....................... ft
a Com ute r ft
14. Hydraulic radius, r P p
w ft/ft
15. Channel slope, s
16. Manning's roughness coeff., n ••••••• .•... ..
2/3 sl/2
17. V 1.49 r ftlS
Compute V .......
n
L ........ . .. . . . ..... EC
......... .
1$. Flow length, {
L Compute Tt ...... hr
19. Tt 3600 V
hr
20. watershed I./
or subarea Tc or Tt (add Tt in steps 6, 11 , and 19) ...•••
l off` D-3
y�w
.....n •IT fT T'1 r!' �nn•...a M_(l .Tone I986)
POST-DEVELOPMENT
CALCULATIONS
I
* TR 20 SIN
* HMVersion 3.40
TR 20 * Fate 1/19/99
* Time 10:11:59
Project Formulation Hydrology * Input file 1275POST.IN
* Output file 1275POST.OUT
+ *
x
xxxxxxx xxxxxx xxxxx xxxxx
x x x x x x Xx
x x x x x x x
x xxxxxx x x x x
x x x x x x x
x x x x xx x
x x x xxxxxxx xxxxx
Full Microcomputer Implementation
by
Haestad Methods, Inc, . ..
37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666
LIST OF INPUT DATA FOR TR-20 HYi3ROLOGY******************
f0 TR--20 SUMMARY
:TLE 1275 N. ANDOVER
.TLE PRE-DEVELOPMENT
RAINFU 7 .25
! 0.0 ,0025 .005 .0075 .010
3 .0125 .015 .0175 .020 .023
d .026 .0285 .431 .034 .037
3 .040 .043 .0465 .050 .0535
3 .057 .0605 .064 .068 .072
3 .076 .D80 .084 .089 .094
3 .100 .107 .115 .122 .130
3 .139 .148 .157 .167 .178
3 .189 .202 .216 .231 .250
3 ,271 ,298 .345 .500 .655
3 .702 .729 .751 .769 785
3 .798 .811 .823 .834 .844
3 .853 .862 ,870 .878 .886
3 .893 ,900 .906 .911 .916
3 .920 .924 .928 .932 .936
3 .940 .944 .9475 .951 .954
3 .957 .960 .963 .966 .969
3 .972 .975 .978 .981 .9835
3 .986 .9685 .991 .9935 .996
3 .998 1.000 1.00 1.00 1.00
3 EN➢TBI,
3 STRUCT 01
3 107.0 0.0 010000
3 108.0 1.10 0.2887
3 110.0 21.0 0.9536
3 112.0 30.3 1.7207
) ENDTEL
5 RUNOFF 1 001 1 0.01096716 89,7 0.1738
5 RUNOFF 1 002 2 0.00142709 97.5 0.0334
5 RUNOFF 1 003 3 0.01916491 80.5 0.1753
G ADDHYD 4 101 1 2 4
5 RSSVOR 2 01 4 5
5 ADDHYD 4 102 3 5 6
ENDATA
7 INCREM 6 0.1
7 COMPUT 7 DD1 102 0.0 2.6 1.0 7 2 01 01
ENDCMP 1
7 COMPUT 7 001 102 0.0 3.1 1.0 7 2 01 02
ENDCMP 1
7 COMPUT 7 001 102 0.0 4.5 1,0 7 2 01 10
ENDCMP 1
7 COMPUT 7 001 102 0.0 5.3 1.0 7 2 01 25
ksittttt**tk+*k*****BO-80 LIST OF INPUT DATA (CONPINUF D]+**+*t***+************
ENDCMP 1
COMPUT 7 001 102 0.0 6.4 1.0 7 2 01 99
ENDCMP 1
FNDJOB 2
s*****k********t*k*k*k**k*k**END OF 80-80 LIST+++++t+++tt+ttt tt+++t+t++tttttt+
I
20 XEQ 1/19/99 N, ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 7
MMARY TABLE I - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED'
(A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPHI,
A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.)
CTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
RUCTURE CONTROL DRAINAGE TABLE MOIST TIME ----------------------------------- RUNOFF ---------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
ALTERNATE 1 STORM I
:ECTION 1 RUNOFF .01 7 2 .10 .0 2.60 24.00 1.60 ------ 12.23 8.58 782.3
ECTION 2 RUNOFF .00 7 2 .10 .0 2.60 24.00 2.28 ----- 12.15 1.57 1096.4
SECTION 3 RUNOFF .02 7 2 .10 .0 2.60 24.00 .R9 --- 12,26 10,05 524,2
IECTION 101 ADDHYD .01 7 2 .10 .0 2.60 24.00 1.68 --- 12.18 10.04 809.9
'RUCTURE I RESVOR .01 7 2 .10 .0 2.60 24.00 1,6E O8.41 12.43 5.17 417.4 '..
IECTION 102 ADDHYD .03 7 2 .10 .0 2.60 24.00 1.25 ---- 12.29 4.30 -' 453.1
ALTERNATE I STORM 2
SECTION 1 RUNOFF .01 7 2 .10 .0 3.10 24.00 2.06 --- 12.22 10.87 991.3
1ECTION 2 RUNOFF .00 7 2 .10 .0 3.10 24.00 2.77 --- 12,15 ilea 1317.7
SECTION 3 RUNOFF .02 7 2 .10 .0 3.10 24.00 1.36 --- 12.25 13.75 717.3
SECTION 101 ADDHYD .01 7 2 .10 .0 3.10 24.00 2.14 12.18 12.65 1020.7
'RUCTURE i RESVOR .01 7 2 .10 .0 3.10 24.00 2.12 108.E 12.40 7.46 601.E
SECTION 102 ADDHYD .03 7 2 .10 .0 3.10 24.00 1.66 --- 12.2E 0. 00� 646.4
ALTERNATE I STORM 10
SECTION 1 RUNOFF .01 7 2 .10 .0 4.50 24.00 3,38 --- 12.20 17.32 1579.7
SECTION 2 RUNOFF ,00 7 2 .10 .0 4.50 24.00 4.15 --- 12.15 2.75 1928.3
;ECTION 3 RUNOFF .02 7 2 .10 .0 4.50 24.00 2.51 ---- 12.24 23.B5 1244.5
SECTION 101 ADDHYD .01 7 2 .10 .0 4.50 24.00 3.47 --- 12.17 19.99 1613.1
`RUCTURE I RESVOR .01 7 2 .10 .0 4.50 24.00 3.43 09.24 12.37 13.47 1066.8
SECTION 102 ADDHYD .03 7 2 .10 .0 4.50 24.00 2.67 ----- 12.26 3 .45 1186,8
ALTERNATE I STORM 25
SECTION 1 RUNOFF .01 7 2 .10 .0 5.30 24.00 4.15 --- 12.19 21.00 1919.0
SECTION 2 RUNOFF .00 7 2 ,10 .4 5.30 24.00 4.94 --- 12.15 3,25 2276.1
SL-'CTION 3 RUNOFF .02 7 2 .10 ,0 5.30 24.00 3.21 --- 12.23 30.16 1573.E
3ECTION 101 ADDHYD .01 7 2 .10 ,0 5.30 24.00 4.24 --- 12.17 24.17 1950.4
CRUCTURE 1 RESVOR .01 7 2 .10 .0 5,30 24.00 4.20 109.5 12,36 16.64 1342.8
SECTION 102 ADDHYD .03 7 2 .10 .0 5.30 24.00 3.60 --- 12.2E r47.04 1490.5
ALTERNATE 1 STORM 99
SECTION 1 RUNOFF .01 7 2 .10 .0 6,40 24.00 5.22 --- 12.19 26.03 2373.E
3ECTION 2 RUNOFF .00 7 2 .10 .0 6.40 24.00 6.03 ----- 12.15 3.93 2753.5
20 XEQ 1/19/99 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 8
MMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
(A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.1
CTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
'RUCTURE CONTROL DRAINAGE TABLE MOIST TIME --------------------------- RUNOFF ----------------------------------------
ID OPERATION AREA It COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(SQ MI) (HR) (HR) (IN) (HR) (IN) IFT) (HR) (CM (CSM)
ALTERNATE 1 STORM 99
:SCTION 3 RUNOFF .02 7 2 .10 .0 6.40 24.00 4.21 ------ 12.22 38.95 2032.2
E?CTION 101 ADDEEYD .01 7 2 .10 .0 6.40 24.00 5.31 ----- 12.17 29.89 2411.9
'RtUCTURE 1 RESVOR .01 7 2 .10 .0 6.40 24.00 5.26 109.9 12.36 20.79 1677.3
IECTION 102 ADDHYD .03 7 2 .10 .0 6.40 24.00 4.62 ---- 12.26 60.03 1902.0
i
.2.0 XEQ 1/19/99 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 9
iMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES
IECTION/ DRAINAGE
'RUCTURE AREA STORM NUMBBRS..........
ID (So MI) 1 2 10 25 99
STRUCTURE 1 '01
ALTERNATE 1 5.17 7.46 13.47 16,64 20.79
:SECTION 1 .01
ALTERNATE 1 8.58 10.87 17.32 21.00 26.03
:SECTION 2 .00
ALTERNATE 1 1,57 1.88 2.75 3,25 3.93
:SECTION 3 .02
ALTERNATE 1 10.95 13.75 23.85 30.16 38,95
:SECTION 101 .01
ALTERNATE 1 10,04 12.65 19.99 24.17 29.89
:SECTION 102 .03
ALTERNATE 1 14.30 20.40 37.45 47.04 60.03
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
POST-DEVELOPMENT WATERSHED #1
CALCULATED BY: BM
CHECKED BY: BM Te = 1.67L"0.8 1 Q00/CN -9 "0.7
DATE: JANUARY 18, 1999 1,900S"0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,GOOD 701 4.20 294.00
GROUP C LAWN,GOOD 74 24.70 1827.80
GROUP D WETLAND 80 6.60 528.00
IMPERVIOUS PAVEMENT 98 45.50 4459.00
IMPERVIOUS BUILDING 98 19.00 1862.00
TOTALS =j 100.0 88970.80
USE CN = 89 7
POST-DEVELOPMENT WATERSHED
AREA= 0.01096716 Square Miles
CN = 89.7
L= 1,310 Ft,
S = 6.48 %
i
i
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
POST-DEVELOPMENT WATERSHED #2
CALCULATED BY: BM
CHECKED BY: BM Tc = 1.67L"0.8 1 000/CN -9 ^0.7
DATE: JANUARY 18, 1999 1,900S^0.5
C AREA
501E NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN XAREA
GROUP C WOODS,GOOD 70 0.00i, 0.00
GROUP C LAWN,GOOD 74 2.20 162.80
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 97.80 9584.40
IMPERVIOUS BUILDING 981 0.00 0.00
TOTALS 100.00 9747.20
USE GN
POST-DEVELOPMENT WATERSHED
AREA= 0.00142709 Square Miles
CN = 97.5
L= 230 Ft.
S= 2.00 %
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
POST-DEVELOPMENT WATERSHED#3
CALCULATED BY: BM
CHECKED BY: BM Tc = 1.67L^0.8 1 0001CN -9 ^0.7
DATE: JANUARY 18, 1999 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,GOOD 70 50.20 3514.00
GROUP C LAWN,GOOD 74 3.80 281.20
GROUP D WETLAND 80 14.20 1136.00
IMPERVIOUS PAVEMENT 98 11.20 1097.60
IMPERVIOUS BUILDING 98 20.60 2018.80
TOTALS =1 100.0 88047.60
USE CN 80.5
POST-DEVELOPMENT WATERSHED
AREA= 0.01916491 Square Miles
CN = 80.5
L= 1,245 Ft.
S = 6.80 %
Worksheet 3: Time of concentration Uc) or travel time (TO
By Date 1_1 � 99
Fro ject
Checked Dace
Location
Circle one: present ,eloped') -'
Circle one: Tc TL through subarea
pgpS; Space for as many as two segments per flow type can be used for each
worksheet.
Include a map, schematic, or description of flow segments-
Include
to T only) Segment ID
Sheet flow (Applicablec
1. Surface description (table 3-1) .......
2. Manning's roughness coefE., n (table 3-1) '.•
• ..... ft 6-0
3. Flow length, L (total L < 300 ft)
4. Two-yr 24-hr rainfall, P2 ... ...•••• ••. .•..• in
�•
ft/ft . C�
5. Land slope, s ....... ..... ... ...... ... . .. ...
0.007 (nL)0.8 Compute, Tt ...... hr
6. Tt ' P 0.5 s0.4
2
Segment ID
Shallow concentrated flow
7, Surface description (paved or unpaved) ..... �.1• � ur
ft
C
B. Flow length, L ........ .....................
l
ft/ft
9. Watercourse slope, s
V (figure 3-1) ... .. ...... ft/s
10. Average velocity, B + - 0./6oZ
L Compute Tt ...... hr
11• Tt w 3600 V
Segment ID
Channel flow 2
12. Cross sectional flow area
a ......... ...... ft
ft
13. wetted perimeter, P. ........... ""•"
a Compute r ft
14. Hydraulic radius, r p p
w
...... ...... ft/ft
15. Channel slope, s ....... .. ......
i6. Manning's roughness coeff., n ..... . .. ••"'
1.49 r�/3 sl/2 ft/s
17• V Compute V ..•••• •
n
�, f t
18. Flow length, a
L Compute T ...... hr
..
t
19. Tt 3600 V hr / 3
20. Watershed or subarea c T or Tt (add Tt in steps 6, 11 , and 19)
D-3
.,, I"" r� c• ,a F� JiinP 1986)
_ Woriksheet 3: Time of concentration (Tc) or travel time (Tt)
ny - Date
Project � -
Checked Date
Location
Circle one: Present evelope
SST
Circle one: Tc Tt through subarea
NOTES: Space for as many as two segments per flow type can be used for each
uorksheet.
Include a map, schematic, or description of flaw segments•
(Applicable to x only) Segment ID
• Sheet flow {ApP c
1. Surface description (table 3-1)
2. Manning's roughness coeff., n (table 3-1) '..
total L < 300 ft) ... ....... ft /,L/?
3. Flow length, L { _
4. Two-yr 24-hr rainfall, P2 in ,
•.. . .. ... f t/f t 4
S. Land slope,
0.007 (nL)0.8 Compute Tt . .. ... hr
6. Tt ' .P 0.5 s0.4
2
Shallow concentrated flow
Segment ID
P (paved or unpaved) f7LJL�
7. Surface descri tion (p
' ft /
8. Flow leng L
th, .. ....•• ••......
9. Watercourse slope, s ft/ft
V (figure 3-1) ........... ft/s
10. Average velocity, + C/l
L Compute Tt ...... hr dJt
11. it - 3600 V
Segment ID
Channel flan
2
12. Cross sectional flow area, a ............••• ft
ft
13. Wetted perimeter, pW
a Compute r ....... ft
14. hydraulic radius, r VW
ft/ft
15. Channel slope, s
16. Haaning's roughness coeff., n
49 r2/3 sl/2
1. Compute ...... ft/s
17• V a pute V .
n
L ft
18. Flow length, }
L Compute T ...... hr
19• Tt - 3600 V t
or subarea T or Tt (add Tt in steps 6, 11 , and 19) .-
hr
20. Watershed c 7.C)3
D•3
t,T TD r-, .dune 19$6)
Worksheet 3: Time of concentration (Tr) or travel time (Tt)
D a C e �
Project �VCi� f � j J �--=
Checked Date
---�--
Location
Circle one: Present eveloped
Circle one: Tc Tt through subarea
Hpg; Space for as many as two segments per flow type can be used for each
worksheet.
Include a map, schematic, or description of flow segments.
Sheet flow (Applicable to Tc only) Segment ID
1. Surface description
table 3-1) ...........
- •Ol
2. Manning's roughness coeff., n (table
3. Flow length, L (total L < 300 ft) ..........
ft
4. Two-yr 24-hr rainfall, P2 .................. in
S. Land slope, s ... .,... ..
. ... ftlft -C�
0.007 (nL)0.8 compute. Tt ...... hr
6. Tt ' .P 0.5 s0.4
2
Shallow concentrated flow
Segment ID
7. Surface description (paved or unpaved) .....
8. Flow length,
9. Watercourse slope, s .. ......... .. .......... fl/f:
V f1 ure 3-1) ........... ft/s
10. Average velocity, ( 8 k
L hr
Compute Tt .•
E1. Tt 3600 V
Segment ID
Channel flow
12. Cross sectional flow area, a ••.......••.... ft2
rimeter, ft
13. Netted pe � Pw ......................
a� compute r ..••••• ft
..
14• Hydraulic radius, r p P
w
15. Channel slope, s ..... .....................
ft/ft
16. Manning's roughness coeff., n
1.49 r�/3 s1/2 ...... ft/s
17. V a Compute V .
n
18. Flow length, L ........ ........... . ......... ft
f
L
Compute T ...... hr
19. Tt 3600 t
and 19) hr f
20. Watershed or subarea Tc or TC (add Tt in steps 6, ll,
D-3
_s L",z Tt+no 14RFi1
i
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
January 19, 1999
NORTH ANDOVER
INLET(POND) TO DMH
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................ ... ... .... ....... 2.00
FHWA Chart Number (1,2 or 3) ........ ............. ....... 1
Scale Number on Chart (Type of Culvert Entrance) ........ 3
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening........ .... 0.50
Culvert Length (Peet) ..................... .............. 22.0
Culvert Slope (feet per foot) ................ .... ....... 0.0090
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth outlet Velocity
(cEs) (ft) Control Control (ft) (ft) (ft) (fps)
-------------------------------------------------------------
E30.3
0,00 0.49 0.99 0.30 0.36 0.36 2.13
2.00 2.80 3.00 1.49 1.64 2.00 6.68
2.70 4.33 5.00 2.00 1.87 2.30 9.64
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 ',
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895--8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
January 15, 1999
north andover outlet sturcture-dmh
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ........................... ...... 3.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance)........ 3
Manning's Roughness Coefficient (n-value),, ,,,,,,,, ,,,,, 0.0120
Entrance Loss Coefficient of Culvert Opening...... ...... 0.50
Culvert Length (feet) ...... ....................... ...... 78.0
Culvert Slope (feet per foot) .................... ....... 0.0050
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical ❑epth at Outlet
Rate ➢epth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
10.0 1,80 1.37 1.67 0.90 1,00 1.80 2,26 -
20.0 2.20 2.03 2.07 1.30 1.43 2.20 3.60
30.0 2.60 2.59 2.76 1.66 1.77 2.60 4.61
40.0 3.10 3.13 3,69 2.00 2,06 3.00 5.66
50,0 3.70 3.66 4.85 2.41 2,30 3.00 7.07
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc„ 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
January 15, 1999
north andover dmh - headwall
PROGRAM INPUT DATA:
DESCRIPTION VALUE '..
-------------------------------------------------------------------
Culvert Diameter (feet) .... ......... . ............... .... 3.00
FHWA Chart Number (1,2 or 3) ......... ................... 1
Scale Number on Chart (Type of Culvert Entrance) ........ 3
Manning's Roughness Coefficient (n-value) ............ ... 0.0120
Entrance Loss Coefficient of Culvert Opening......... ... 0.50
Culvert Lengtb (feet) .................... ........ ... .... 35.0
Culvert Slope (feet per foot) ......... .. ......... .. .... 0.0050
PROGRAM RESULTS: -
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
10.0 0.00 1.37 1.68 0.90 1.00 1,00 4.85
20.0 0.00 2.03 2.26 1.30 1.43 1.43 5.99
30.0 0.00 2.59 2.69 1.66 1.77 1.77 6.89
40.0 0.00 3.13 3.21 2.00 2,06 2.06 7.73
50.0 0.00 3.66 3.81 2.41 2.30 2.30 B.59
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
TRAPEZOIDAL CHANNEL ANALYSIS
NORMAL DEPTH COMPUTATION
January 19, 1999
PEMBRGBNCX SPTLLWA
ELEVATION 115.9
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE ',
---------------------------------- ----------------------------------
Flow Rate (cubic feet per second) ..................... . . 30.0
Channel Bottom Slope (feet per foot)................. ... 0.0005
Manning's Roughness Coefficient (n-value) ............... 0.0300
Channel Side Slope - Left Side (horizontal/vertical) .... 2.00
Channel Side Slope - Right Side (horizontal/vertical) ... 2.00
Channel Bottom Width (feet) ..................... ..... .. . 25.0
PROGRAM RESULTS;
DESCRIPTION VALUE
------------------------------__-------------------------------------
Normal Depth (feet) ..................................•. , 1.04
Flaw Velocity (feet per second)..... .................... 1.07
Froude Number (Plow is Sub-Critical) .................... 0.192
Velocity Head (feet) .................................... 0.02
Energy Head meet) -...-...... ............... ...... . 1,06
Crass-Sectional Area of Flow (square feet)............. . 29.10
Top Width of Flow (feet) ... .... ... ................... ... 29.15
TRAPEZOIDAL CHANNEL ANALYSIS COMPUTER PROGRAM, Version 1.3 (c) 1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 695-8322. A manual with equations & flow chart is available.
APPENDIX B
TABLE 6-6 -- ROUGHNESS COEFFICIENTS (MANNING'S n)
FOR SHEET FLOW
Surface Descri tion n
Smooth surfaces (concrete, asphalt, 0. 011
gravel, or bare soil) 0. 05
Fallow (no residue)
Cultivated soils: 0. 06
Residue cover <20% 0. 17
Residue cover >20%
Grass: 0. 15
Short grasses 0. 24
Dense grasses
Woods: 0. 40
Light underbrush 0. 80
Dense underbrush
Note: When selecting n, consider cover
tofatheheight
of about 0. 1 ft. This is the only part
plant cover that will obstruct sheet flow.
Source: USDA Soil conservation Service
6-25
.50 —
I
I
I 1
I
I I
1
I
.20 l i 9 1
E I I I E 1 1 i
IliffillW 11 I I
i I
II1 I
.� .10
p
omil
06
r I I I I 1 1
Ql ,
.04 I ; ,
O 1
t I ! I I ! F1711 I I I I I 1 I
1 3 I if-III 1 l I ! 1 I
! E i ! l I III 1 l
t 1 1 I 1 11 1111111 I 1 I I
•02 1 1 1 l a I 1 IIII I i 1 1 1 1
, �,
II I ( Il1 = � : 111
.01 I I I ' � � I I I i ' '• 11
1 1 I ` l.i 1111 'pill Elf
005 ZI :
I 11 1 I1 III I
1 2 4 6 10 20
Average velocity, ft/sec
FIGURE 6-14 AVERAGE VELOCITIES FOR ESTIMATING TRAVEL
TIME FOR SHALLOW CONCENTRATED FLOW
Source: USDA Soil Conservation Service
&27.
JOB- 141
APPLEDORE ENGINEERING, INC.
SHEET NO. OF
600 State Street, Suite D
PORTSMOUTH, NH 03801 CALCULATEDBY DATE
(603) 433-8818 CHECKED BY DATE
SCALE
.
e a
y '
Z
o . z o
!w. o
:. .� . /�� Ca?s c�e.4.0 . s7zi2•��
4,7, X
PIPE CULVERT ANALYSIS
COMPUTATION Or CULVERT PERFORMANCE CURVE
January 19, 1999 '..
NORTH ANDOVER
DMI1 5 - DMH 4
AEI 1275
PROGRAM INPUT DATA:
DRSCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ....... .......................... 1.25
PHWA Chart Number (1,2 or 3) .......................... .. 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ......... . ... .. 0.0120
Entrance Loss Coefficient of Culvert Opening....... ..... 0.50
Culvert Length (feet) ..... . ............ ............ ..... 86.0
Culvert Slope (feet per foot) ............ ......... ...... 0.0300
PROGRAM RESULTS:
Plow Tailwater Headwater (ft) Normal Critical depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) control control (ft) (ft) (Et) (fps)
__--__.-___.__.------------------------------------------------------
8.0 4,00 2.53 3.53 0.74 1.11 1.25 6.52
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc_ 7015 W. Tidwell, #107, Houston, T% 77092
{713) 995-8322. All Rights Reserved.
ca r
,1-41
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
January 19, 1999
NORTH ANDOVER
CB 8 -- DMH
AEI 1275
PROGRAM INPUT DATA;
DESCRIPTION VALUE '..
--------------------------------------------------------------------
Culvert Diameter (feet) ................. ................ 1,00
FHWA Chart Number (1,2 or 3) .. ...... ...... .......... .... 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ........ ...................... ..... 6.0
Culvert Slope (feet per foot) .......... ............ ..... 0,1080
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal critical Depth at Outlet
Rate Depth inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
___-___..______ ____....-------------------------------------------
4.0 3.50 1.70 3.52 0.39 0.85 1.00 5.09
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
4
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
January 19, 1999
NORTH ANDOVER
CE 9 - DMH 5
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................ .... ............. 1.00
F11WA Chart Number (1,2 or 3) ............................ 1
Scale Number an Chart (Type of Culvert Entrance) ....... , 1
Manning's Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening........ . ... 0.50
Culvert Length (feet) ... ............ .................... 114.0
Culvert Slope (feet per foot). . ..................... .... 0.0050
PROGRAM RESULTS:
Flow Tailwater Headwater (£t) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fpsl
--------------------------------------------------------------------
4.5 3.50 1.98 G7 1.00 0.69 1.00 5.73
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, 0107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
TSS REMOVAL WORKSHEET
North Andover Commerce Center
North Andover Massachusetts
AE111275
Best Management Practice Proposed : Constructed Wetland
DEP Credit = 80%
TSS removal = 1 x 0.8 = 0.8 (80%)
TSS removal required = 80%
* This does not include optional credit for parking lot sweeping as proposed in our
Operation and Maintenance plan.