HomeMy WebLinkAboutDrainage Study for NA Commerce Center 12-04-1998 NORTHDRAINAGE STUDY
FOR
DOER COMMERCE CENTER
CLARK STREET
NORTH ANDOVER, MASSACHUSETTS
December 4, 1998
Prepared For:
One Clark North Andover, LLC
121 Middle Street
Portland, Maine 04101
Prepared By: f
Appledore Engineering, Inc. x
600 State Street, Suite D. LA
Portsmouth, New Hampshire 03801
,£v�
(1275-ds.doc) „�
North Andover Commerce Center
Clark Street
North Andover, Massachusetts
TABLE OF CONTENTS
1.0 Project Description
Site Location Plan (USGS)
Soil Survey (SCS)
2.0 Summary
3.0 Calculation Methods
4.0 Pre-Development Condition
5.0 Post-Development Condition
6.0 Structure Analysis
7.0 Best Management Practices
Appendix A: Supporting Calculations
Pre-Development Calculations
Post-Development Calculations
Post-Development On-site Structure Analysis
Appendix B: Charts, Etc.
North Andover Commerce Center Table of Contents
Clark Street
North Andover, Massachusetts
1.0 - PROJECT DESCRIPTION
The project consists of the demolishing approximately 72,000 sf of existing building and
constructing a 56,675 sf addition. This will provide 168,735 sf of office/warehouse area
on the east side of Clark Street. On the west side of Clark Street an existing 8181 sf
building will be renovated to office space. In addition to the building construction,
additional parking will be provided as well as revised truck loading areas. As part of the
proposed project, a constructed wetland has been designed to provide stormwater
treatment for new pavement areas prior to discharging stormwater to the adjacent
wetlands. Currently, the stormwater receives little treatment before discharging to the
same wetland. The project site is located on Clark Street at the old Borden Chemical
Plant. The topography of the site is fairly flat with a steep slope on the south property
line. The soils located on-site are classified as Urban (previously disturbed). We have
assumed a soil group of `C' for all soils on site except the wetland soils which were
classified as group `D'. Our assumption was based on several soil borings taken
around the site. The existing groundwater in the soils was observed very close to the
surface.
North Andover Commerce Center Project Description
Clark Street
North Andover, Massachusetts
tt6� T
!�
s
water Tank 1
Y
�cl( i}j f. rrr f' i g l tt�F fS fi
+ LAt9lRENGE f''
UNICIPAL Al
k
9d1.'r
4S11 f,V
4t t� _ ,
p ' rl
_ * '.t r y_... ,�{--t C;. �,-•- _-- y.�:.. c� - -pU-ping ""`;• Cia r ' /'"
8M
y
,'� * �S �t�}�a ,� 1�Imo` � � ,,� /�•-. v 3':7{°` j ��1 r � i�, I i�f �5 c ,., •,
P � b
Dou e-d
Red 6Gk �
+ " D ly 13 '
Bridge ` � ! ♦ '� `
%' �� •s'r `tom. e y ;p> ♦ c y ..
s
�_ e l
py
�N�t. k
0 � {
_
- 7
�l
e
• U5AF ��'�l��"`} f � � �.-'a ��. n �' � � �� � (� 1 F�r"` ��`�.�` Y'r/yr'
Mlemonal � t k
-- Parkr �� f ,,. 3 ' _s !7 .� ,:t
p� SITE LOCATION PLAN Source:
AEI S&"-t�d—
LAWRENCE, MASSACHUSETTS
Appledore Engineering, Inc.
BBo stat..�smt.° NORTH ANDOVER 7.5 x 15 MINUTE QUADRANGLE
P-t--Lb.X—BampahW 03801 (M)4M—BBSB
COMMERCE CENTER SCALE: 1:25,000
DATE: OCTOBER 19, 1998 CLARK STREET
PROJECT No.: 1275 NORTH ANDOVER, MASSACHUSETTS
FILE: 1275USGS
c YbtS s { " au a p' 3 b 6C PaC r PcE�1
Pa
` r AI DEN
I L4f
5
We �f $Jg Wp ` ' �' m #c � \i ¢ n PbD D
t AgA 1 De WpDr Ws
D a s., � aZ ,��"'� ; �3 s""Yx t t •—.,.. W n B .:: � ��� ,+i �d k ; '.
ti De->st . `s Pe: ��. �,c �Se :;�. 1•,s- �#,
Me
-'sP-r�- t� ab� ta, •-'- Sy EF 5 h+ a 3:'y i'£ -rat R. 1' z z. w
PbD�(V)
,--
1� •1� � f � r� u, {-�,.. �4 "y._ r� `` 04 "1�Yu r .;-,� t �P al.
Ur t ww xi �R3 1 s x.1 f
(, s.�a W�C o�� ;'%A Y,t ,1 ��` , r��j_�'r� �sAr -.,,e PaB:_� }� t�,�rx� e x,��X `•Pc
e2(� StB
C/`r,. ° '� a4 P t 1 sd �' yh� .f'} � � � � ..•Q1 � 'Pw1x�z, ,� �kµ '`i,:� �•:'
Wn8 Wn� " Wa6 y $ PbD r d• 0
1 e 9 t
P aZRIB
WnB'. De Pa6
5 �3hi a y� 5er s, IT
°x+ •` sa /�r - ��rty �� �s r�� -a• hd ��i t ':PaD .. � .'_� ram' �• •`
t 4rn
,gam: .,�•-fi- ,:,a i z�"' �S c kT !M PaB tr �r A � %
� a z�y ,���
WE,
Sr Etid
?
>• ,c,-o"•+5Y �f � .F"�:i ;s'.:�F , 4 � '� 'fit j-- �� `,�' ` ' f",}��t ,
yp{�8d'`� "'�, •';,,� :.,':1 � �°�3s �, P y o-� . 3 a Wr t Y' '�y � ��x �� � R �+ `- ��+.�-
t
Pafl: i ` Wr8�+�,�,..:e � Pa6 ar` „}�' .ae, a Se rt•*.,
'Itxry. #r t-i�u f7a Ur, i, 4w� s ?` o Pa8 t s ti z e r vtt
t� t ae , Wr6 P
rB17
' d � y y UY 'P taE?a6 �r �' �" f? r£ 1• neA:F L
q�'' r 1
a Pb De
Pa D r,1" rr'+ath - ^+kroj` :Le j L
t W r B `'P6 r s
PaB
LAWIZENCE a r: .�. = � b
MtINjC�IPAL
� r
t A. 4:.` � '� �J _: � Srq- �,.. sX9 �"i_L+ �y, "� r +� � Ms•-'�i 1 �.P��
_., ., •r tl t....
�yxgrr�ts �: 2 MC.. t + {ta> x5
ti i'r X�t/ ..�r �v� yap � ,�^ � r�{: n°'�gP�?�f��r'"`�,�j. r ��5 ����a` � �f�•
.�v ."r I .- tf:..�� 'k '"� •$.�:� ��; m i a d'V!' l�C`'y��- s74�Wr��.�� i�� �=� � :4'`i���� 3- �5 0,�:,, .
`'"• ,,.' ..�.. t?�"� .C) r.�"-^v�� "r,> -s,x='.4.aa w �'1 E'F�."' 1 f'..s:Ed� �� '� �< .t� l
Ap
AW1 >"°"° SOIL LOCATION PLAN Source:
sw�a,.d
""°'°"" SOIL SURVEY OF
Appledore Engineering, Inc-
WO ate 9tre ,Smote o NORTH ANDOVER ESSEX COUNTY, MA
POrt---tb.New Hnmyablre Q9 l (800)633-B818
COMMERCE CENTER SCALE: 1: 15,840
DATE: OCTOBER 19, 1998 CLARK STREET
PROJECT No.: 1275 NORTH ANDOVER, MASSACHUSETTS
FILE: 1275USGS
2.0 - SUMMARY
This drainage study was completed to assess the pre- and post-development runoff
rates for the proposed development and to assess the proper function of the detention
pond used to mitigate adverse impacts of runoff and sediment due to development. In
addition, a capacity analysis was completed for the drainage infrastructure to assure
proper operation during the 25-year storm event. Lastly, Best Management Practices
were developed to formulate a plan that assures stormwater quality both during and
after construction. The following summarizes the findings from the study.
2.1 - Pre- and Post-Development Flow Comparison:
All of the runoff from the impervious areas currently enters a closed drainage system
and discharges directly the wetland along the northern property line. Almost all of the
post development runoff will enter a constructed wetland prior to discharging to the
wetland. This constructed wetland will provide stormwater treatment as well detention
to mitigate peak flows. Table 1 compares Pre and Post-development peak runoff rates
for the 2-year, 10-year, and the 100-year storm events. As detailed in Table 1 the
drainage system has been designed to reduce the post-development runoff rate for all
three stormwater events. Due to the significant development on the existing site and
the reduction in building footprint, very little detention is required.
TABLE 1
COMPARISON OF PRE- AND POST-DEVELOPMENT FLOWS
STORM EVENT (cfs)
CONDITION 2YR 10YR 100YR
Pre-Development
Northerly Property 25.4 43.1 67.5
Line
Post-Development
Northerly Property 24.3 39.7 56.9
Line
North Andover Commerce Center Summary Description
Clark Street
North Andover, Massachusetts
2.2 - Detention Analysis
The detention pond/constructed wetland area was analyzed for the 2, 10, and 100-year
storm events. The pond is designed to reduce the peak flow of stormwater existing the
site. Based on the existing stormwater flows the post development stormwater flows
have been reduced by approximately 8%.
2.3 - Structure Analysis
The drainage pipes were analyzed for inlet and outlet control for the 25-year storm
event. The drainage system was analyzed with a conservative tailwater condition of the
peak pond elevation for the 100 year storm event. As depicted in the structure analysis
section of this report, the drainage system is anticipated to operate without ponding or
flooding on-site during the 25-year design storm. No capacity analysis has been
completed for the existing drainage pipes which will remain and experience no
additional impact from this project.
2.4 - Best Management Practices
Best Management Practices have been incorporated into the drainage design which
provide for temporary erosion control measures during the construction process, and
permanent erosion control measures after construction is complete and stormwater
treatment devices. Temporary measures are fully depicted in the site plan set on the
detail sheet entitled "Erosion Control Detail Sheets". Temporary measures include silt
fence around the perimeter of construction, haybale barriers around each of the
catchbasin inlets during construction until the site has been paved and stabilized.
Permanent erosion control measures include turf establishment on all disturbed areas
which have not been paved and a riprap apron at the discharge pipe outlet.
Stormwater treatment devices include sumps in the catchbasins and a detention
basin/constructed wetland.
North Andover Commerce Center Summary Description
Clark Street
North Andover, Massachusetts
3.0 - CALCULATION METHODS
The design storms analyzed in this study are the 2-year, 10-year, and 100-year storm
events. The Soil Conservation Service TR20 model(') was utilized to predict the peak
runoff rates from these storm events. A Type III storm pattern was utilized in the model.
The time of concentration was computed utilizing the Lag Method which provides a
means of determining time by utilizing watershed characteristics such as slope, length
and the runoff curve number. Reference #1 contains a full description of the time of
concentration methodology utilized in this report.
Drainage structures were sized for the 25-year storm utilizing peak run off rates from
the TR-20 method. Structure Subcatchments were identified and stormwater flows
were routed through the system. Hydraulics calculations for the drainage structures
were analyzed for inlet and outlet control, maximum headwater and discharge velocity
for the 25-year storm event using a computer program entitled "Dodson Hydraulics
Library"(').
References.-
1. Microcomputer Implementation of the Mainframe Fortran Program: TR-20,
Project Formulation Hydrology, by Soil Conservation Services, distributed by
Haested Methods, Waterbury, CT.
2. Massachusetts Department of Environmental Protection, Stormwater
Management Policy, Volume 1, and 2.
3. The Dodson Hydraulics Library, 1987, Dodson & Associates, Houston, TX
North Andover Commerce Center Calculation Methods
Clark Street
North Andover, Massachusetts
4.0 - PRE-DEVELOPMENT CONDITION:
The pre-development condition is characterized by one (1) catchment area. This
watershed is depicted on the Pre-Development Watershed Plan attached to this report.
5.0 - POST-DEVELOPMENT CONDITION
The post-development condition is characterized by three (3) watershed areas. The
post-development analysis will allow for a direct comparison between the pre- and post-
development peak runoff rates to assess the impact of the project. The three (3)
watershed areas are depicted upon the attached Post-Development Watershed Plan.
6.0 - STRUCTURE ANALYSIS
The drainage pipes were analyzed for capacity with the 25 year, type III storm event. A
separate model depicting subcatchment areas for each of the catchbasins was created.
7.0 - BEST MANAGEMENT PRACTICES
Best management practices for this project include temporary erosion control
measures, permanent erosion control measures and stormwater treatment devices.
Temporary erosion control measures which will be enacted during construction are fully
detailed on the site plans in the detail sheet entitled "Erosion Control Detail Sheet" and
numbered as Sheet C-7. These measures include construction sequencing, haybales
and silt fences, provisions for stabilization of inactive areas. Permanent erosion control
measures include turf establishment of all disturbed areas which have not been paved.
Stormwater treatment devices include sumps in the catchbasins to remove sediments
from stormwater and a constructed wetland/detention basin to remove pollutants
common to stormwater runoff.
The detention basin/wetland enhancement area has been designed to improve the
quality of stormwater runoff and mitigate on-site wetland impacts. The proposed ponds
will accept stormwater runoff from approximately 8 acres of land consisting of
commercial developments, woods, parking areas, office buildings and access roads.
North Andover Commerce Center Pre-Development Condition
Clark Street
North Andover, Massachusetts
APPENDIX A
PRE-DEVELOPMENT
CALCULATIONS
* TR 20 SIN
* HMVersion 3.40
TR 20 * Date 11/04/98
* Time 8:35:49
Project Formulation Hydrology * Input file 1275PRE.IN
* Output file 1275PRE.OUT
* *
* #
xxxxxxx xxxxxx xxxxx xxxxx
x x x x x x xx
x x x x x x x
x xxxxxx x x x x
x x x x x x x
x x x x xx x
x x x xxxxxxx xxxxx
..... ..... ........................ .........
..... ............................. .........
..... ......................................
....... ... ... ...... ........................
.. . Full Microcomputer Implementation ...
by
... Haestad Methods, Inc. ...
..... ........ ..............................
............. ..............................
............. ..................... .........
..... ......................................
37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666
***************80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY******************
i TR-20 SUMMARY
'LE 1275 N. ANDOVER
'LE PRE-DEVELOPMENT
RAINFL 7 .25
0.0 .0025 .005 .0075 .010
.0125 .015 .0175 .020 .023
.026 .0285 .031 .034 .037
.040 .043 .0465 .050 .0535
.057 .0605 .064 .068 .072
.076 .080 .084 .089 .094
.100 .107 .115 .122 .130
.139 .148 .157 .167 .178
.189 .202 .216 .231 .250
.271 .298 .345 .500 .655
.702 .729 .751 .769 .785
.798 .811 .823 .834 .844
.853 .862 .870 .878 .886
.893 .900 .906 .911 .916
.920 .924 .928 .932 .936
.940 .944 .9475 .951 .954
.957 .960 .963 .966 .969
.972 .975 .978 .981 .9835
.986 .9885 .991 .9935 .996
.998 1.000 1.00 1.00 1.00
ENDTBL 422.�I/.��'j) -N Jc LjY/2.5�
RUNOFF 1 001 1 0.03154966 85.5 0.3090
ENDATA
INCREM 6 0.1
COMPUT 7 001 001 0.0 3.1 1.0 7 2 01 02
ENDCMP 1
COMPUT 7 001 001 0.0 4.5 1.0 7 2 01 10
ENDCMP 1
COMPUT 7 001 001 0.0 5.3 1.0 7 2 01 25
ENDCMP 1
COMPUT 7 001 001 0.0 6.4 1.0 7 2 01 99
ENDCMP 1
ENDJOB 2
k xxxxxxxxxxxxxxxxxxxxxxxxx***END OF 80-80 LISTxxxxxxxxxxxxxxxxxxxx+xxxxxx+*xxx
10 XEQ 11/04/98 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 3
QMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
(A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.)
-TION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
=TURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------- ----------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
ALTERNATE 1 STORM 2
;CTION 1 RUNOFF .03 7 2 .10 .0 3.10 24.00 1.71 --- 12.29 25.40 805.1
ALTERNATE 1 STORM 10
3CTION 1 RUNOFF .03 7 2 .10 .0 4.50 24.00 2.95 --- 12.28 43.14 1367.4
ALTERNATE 1 STORM 25
ECTION 1 RUNOFF .03 7 2 .10 .0 5.30 24.00 3.69 --- 12.27 5 .41 1692.8
ALTERNATE 1 STORM 99
=ION 1 RUNOFF .03 7 2 .10 .0 6.40 24.00 4.73 --- 12.27 67.54 2140.8
0 XEQ 11/04/98 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 4
IMARY TABLE 3 - DISCHARGE (CPS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES
:CTION/ DRAINAGE
'.UCTURE AREA STORM NUMBERS. ....... ..
D (SQ MI) 2 10 25 99
IECTION 1 .03
ALTERNATE 1 25.40 43.14 53.41 67.54
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
PRE-DEVELOPMENT WATERSHED#1
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: NOVEMBER 6, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 22.50 1642.50
GROUP C LAWN,GOOD 74 22.10 1635.40
GROUP D WETLAND 80 8.90 712.00
IMPERVIOUS PAVEMENT 98 25.40 2489.20
IMPERVIOUS BUILDING 98 21.10 2067.80
TOTALS =j 100.001 8546.90
USE CN = 85.5
POST-DEVELOPMENT WATERSHED
AREA= 0.03154966 Square Miles
CN = 85.5
L= 1,704 Ft.
S = 4,80 %
Tc= 0.309 Hours
POST-DEVELOPMENT
CALCULATIONS
* TR 20 SIN
* HMVersion 3.40
TR 20 * Date 11/25/98
* Time : 13:52:17
Project Formulation Hydrology * Input file 1275POST.IN
* Output file 1275POST.OUT
# *
#
xxxxxxx xxxxxx xxxxx xxxxx
x x x x x x xx
x x x x x x x
x xxxxxx x x x x
x x x x x x x
x x x x xx x
x x x xxxxxxx xxxxx
... Full Microcomputer Implementation ...
by
Haestad Methods, Inc.
37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666
*************80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY******************
'R-20 SUMMARY
1275 N. ANDOVER
PRE-DEVELOPMENT
�INFL 7 .25
0.0 .0025 .005 .0075 .010
.0125 .015 .0175 .020 .023
.026 .0285 .031 .034 .037
.040 .043 .0465 .050 .0535
.057 .0605 .064 .068 .072
.076 .080 .084 .089 .094
.100 .107 .115 .122 .130
.139 .148 .157 .167 .178
.189 .202 .216 .231 .250
.271 .298 .345 .500 .655
.702 .729 .751 .769 .785
.798 .811 .823 .834 .844 _J
.853 .862 .870 .876 .886
.893 .900 .906 .911 .916
.920 .924 .928 .932 .936
.940 .944 .9475 .951 .954
.957 .960 .963 .966 .969
.972 .975 .978 .961 .9835
.986 .9885 .991 .9935 .996
.998 1.000 1.00 1.00 1.00
INDTBL
',TRUCT O1
107.0 0.0 0.0000
108.0 14.2 0.2887
b/V
110.0 19.0 0.9536
112.0 29.0 1.7207
114.0 35.0 2.5785
116.0 40.0 3.5317
118.0 45.0 4.5844'8//��f\
3NDTBL 42eq
ZUNOFF 1 001 1 0.01096716 89.8 0.1830
ZUNOFF 1 002 2 0.00142709 97.5 O.OS70
ZUNOFF 1 003 3 0.01916491 82.0 0.2280
ADDHYD 4 101 1 2 4
ZESVOR 2 01 4 5
ADDHYD 4 102 3 S 6
ENDATA
INCREM 6 0.1
COMPUT 7 001 102 0.0 3.1 1.0 7 2 Ol 02
ENDCMP 1
COMPUT 7 001 102 0.0 4.5 1.0 7 2 01 10
ENDCMP 1
LIST OF INPUT DATA (CONTINUED)**********************
MMPUT 7 001 102 0.0 5.3 1.0 7 2 01 25
MCMP 1
)MPUT 7 001 102 0.0 6.4 1.0 7 2 01 99
MCMP 1
7DJOB 2
rxxxxxxxxx*xxxxxxxxxxx*xxx*END OF 80-80 LISTxxxx*xxxxx*xxxx*xxxxxxxxxxx*xxxx
XEQ 11/25/98 N. ANDOVER JOB 1 SUMMARY
REV 09/01/63 DEVELOPMENT PAGE 6
.RY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
(A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.)
ON/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
'TUBE CONTROL DRAINAGE TABLE MOIST TIME ------ ------ RUNOFF --------------------------------------
I
OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
,,TERNATE 1 STORM 2
PION 1 RUNOFF .01 7 2 .10 .0 3.10 24.00 2.07 --- 12.23 10.88 992.5
PION 2 RUNOFF .00 7 2 .10 .0 3.10 24.00 2.80 --- 12.15 1.84 1287.8
PION 3 RUNOFF .02 7 2 .10 .0 3.10 24.00 1.46 --- 12.27 14.19 740.3
PION 101 ADDHYD .01 7 2 .10 .0 3.10 24.00 2.15 --- 12.19 12.61 1017.2
"-TURE 1 RESVOR .01 7 2 .10 .0 3.10 24.00 2.14 r.7.7 271 12.33 10.29 830.2
PION 102 ADDHYD .03 7 2 .10 .0 3.10 24.00 1.73 --- 12.28 4.30 770.0
LTERNATE 1- STORM 10
TION 1 RUNOFF .01 7 2 .10 .0 4.50 24.00 3.39 --- 12.21 17.31 1578.7
TION 2 RUNOFF .00 7 2 .10 .0 4.50 24.00 4.18 --- 12.15 2.69 1885.3
TION 3 RUNOFF .02 7 2 .10 .0 4.50 24.00 2.64 --- 12.26 25.17 1313.4
TION 101 ADDHYD .01 7 2 .10 .0 4.50 24.00 3.48 --- 12.18 19.91 1606.0
CTURE 1 RESVOR .01 7 2 .10 .0 4.50 24.00 3.47 10 .18 12.35 14.64 1181.3
TION 102 ADDHYD .03 7 2 .10 .0 4.50 24.00 2.96 --- 12.26 39.69 1257.8
,LTERNATE 1 STORM 25
'TION 1 RUNOFF .01 7 2 .10 .0 5.30 24.00 4.16 --- 12.20 20.98 1912.8
'TION 2 RUNOFF .00 7 2 .10 .0 5.30 24.00 4.98 --- 12.15 3.18 2225.5
'TION 3 RUNOFF .02 7 2 .10 .0 5.30 24.00 3.35 --- 12.26 31.62 1649.7
'TION 101 ADDHYD .01 7 2 .10 .0 5.30 24.00 4.25 --- 12.18 24.06 1941.3
=URE 1 RESVOR .01 7 2 .10 .0 5.30 24.00 4.24 108.5 12.38 15.54 1253.8
=ON 102 ADDHYD .03 7 2 .10 .0 5.30 24.00 3.70 --- 12.26 46.87 1485.1
LLTERNATE 1 STORM 99
'TION 1 RUNOFF .01 7 2 .10 .0 6.40 24.00 5.23 --- 12.20 25.99 2369.9
'TION 2 RUNOFF .00 7 2 .10 .0 6.40 24.00 6.07 --- 12.15 3.84 2692.E
'TION 3 RUNOFF .02 7 2 .10 .0 6.40 24.00 4.36 --- 12.25 40.54 2115.6
'TION 101 ADDHYD .01 7 2 .10 .0 6.40 24.00 5.33 --- 12.17 29.75 2400.0
JCTURE 1 RESVOR .01 7 2 .10 .0 6.40 24.00 5.31 0 .1 12.41 16.93 1365.7
"TION 102 ADDHYD .03 7 2 .10 .0 6.40 24.00 4.73 --- 12.2E 56.91 1803.2
XEQ 11/25/98 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 7
aRY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES
PION/ DRAINAGE
'TUBE AREA STORM NUMBERS..........
(SQ MI) 2 10 25 99
JCTURE 1 .01
LTERNATE 1 10.29 14.64 15.54 16.93
CTION 1 .01
LTERNATE 1 10.88 17.31 20.98 25.99
CTION 2 .00
LTERNATE 1 1.84 2.69 3.18 3.84
CTION 3 .02
LTERNATE 1 14.19 25.17 31.62 40.54
CTION 101 .01
.LTERNATE 1 12.61 19.91 24.06 29.75
ACTION 102 .03
=ERNATE 1 24.30 39.69 46.87 56.91
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
POST-DEVELOPMENT WATERSHED#1
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: NOVEMBER 6, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 4.20 306.60
GROUP C LAWN,GOOD 74 24.70 1827.80
GROUP D WETLAND 80 6.60 528.00
IMPERVIOUS PAVEMENT 98 45.50 4459.00
IMPERVIOUS BUILDING 98 19.00 1862.00
TOTALS =j 100.00 8983.40
USE CN = 89.8
POST-DEVELOPMENT WATERSHED
AREA= 0.01096716 Square Miles
CN = 89.8
L= 1,310 Ft.
S = 6.48 %
Tc= 0.183 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
POST-DEVELOPMENT WATERSHED#2
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)"0.7
DATE: NOVEMBER 6, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWRGOOD 74 2.20 162.80
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 97.80 9584.40
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS=j 100.00 9747.20
USE CN = 97 5
POST-DEVELOPMENT WATERSHED
AREA= 0.00142709 Square Miles
CN = 97.5
L= ?30 Ft.
S = 2.00 %
Tc= 0.057 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
POST-DEVELOPMENT WATERSHED#3
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: NOVEMBER 6, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 50.20 3664.60
GROUP C LAWN,GOOD 74 3.80 281.20
GROUP D WETLAND 80 14.20 1136.00
IMPERVIOUS PAVEMENT 98 11.20 1097.60
IMPERVIOUS BUILDING 98 20.60 2018.80
TOTALS =j 100.001 8198.201
USE CN = 82 0
POST-DEVELOPMENT WATERSHED
AREA= 0.01916491 Square Miles
CN = 82.0
L= 1,245 Ft.
S = 6.80 %
Tc= 0.228 Hours
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 23, 1998
361, outlet out of pond
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 3.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 3
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ..... .. .............. . ............. 34.0
Culvert Slope (feet per foot) .............. .. .......... . 0.0050
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
35.5 0.00 2.89 2.97 1.85 1.94 1.94 7.36
28.9 0.00 2.53 2.64 1.62 1.74 1.74 6.80
24.0 0.00 2.26 2.43 1.45 1.58 1.58 6.37
15.5 0.00 1.75 2.09 1.13 1.26 1.26 5.52
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
STRUCTURE ANALYSIS
CALCULATIONS
* TR 20 SIN
* HMVersion 3.40
TR 20 * Date 11/25/98
* Time 15:28:14
Project Formulation Hydrology * Input file 1275SUB.IN
* Output file 1275SUB.OUT
* #
* #
xxxxxxx xxxxxx xxxxx xxxxx
x x x x x x xx
x x x x x x x
x xxxxxx x x x x
x x x x x x x
x x x x xx x
x x x xxxxxxx xxxxx
............. ..............................
...........................................
...................................... .....
Full Microcomputer Implementation
by
Haestad Methods, Inc.
...........................................
...........................................
37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666
LIST OF INPUT DATA FOR TR-20 HYDROLOGY******************
B TR-20 SUMMARY
TLE 1275 N. ANDOVER
TLE PRE-DEVELOPMENT
RAINFL 7 .25
0.0 .0025 .005 .0075 .010
.0125 .015 .0175 .020 .023
.026 .0285 .031 .034 .037
.040 .043 .0465 .050 .OS35
.057 .0605 .064 .068 .072
.076 .080 .084 .089 .094
.100 .107 .115 .122 .130
.139 .148 .lS7 .167 .178
.189 .202 .216 .231 .250
.271 .298 .345 .500 .655 /
.702 .729 .751 .769 .785
.798 .811 .823 .834 .844 ram' �j
.853 .862 .870 .878 .886 ��ST27�U�d�
.893 .900 .906 .911 .916
.920 .924 .928 .932 .936
.940 .944 .9475 .951 .954
.957 .960 .963 .966 .969
.972 .975 .978 .981 .9835
.986 .9885 .991 .9935 .996
.998 1.000 1.00 1.00 1.00
ENDTBL A2eq
RUNOFF 1 003 1 0.00014409 94.4 0.0260
RUNOFF 1 004 2 0.00054598 96.8 0.0670
RUNOFF 1 011 3 0.00021027 95.6 0.0300
ADDHYD 4 101 1 2 4
ADDHYD 4 102 3 4 5
RUNOFF 1 001 6 0.00007934 98.0 0.0260
RUNOFF 1 002 7 0.00300627 88.4 0.0490
ADDHYD 4 103 6 7 1
ADDHYD 4 104 1 S 2
RUNOFF 1 010 3 0.00088696 96.8 0.0480
ADDHYD 4 105 2 3 4
RUNOFF 1 012 5 0.00071371 93.2 0.0660
RUNOFF 1 009 6 0.00104146 98.0 0.0680
RUOFFF 1 008 7 0.00037907 98.0 0.0490
ADDHYD 4 106 6 7 1
ADDHYD 4 107 4 5 2
ADDHYD 4 108 1 2 3
RUNOFF 1 OOS 4 0.00165888 86.5 0.0650
ADDHYD 4 109 3 4 5
RUNOFF 1 006 6 0.00074628 98.0 0.0350
RUNOFF 1 007 7 0.00064405 98.0 0.0350
LIST OF INPUT DATA (CONTINUED)**********************
RUNOFF 1 099 3 0.00121958 98.0 0.0210
ADDHYD 4 110 6 7 1
ADDHYD 4 112 3 1 7
ADDHYD 4 Ill 5 7 2
ENDATA
INCREM 6 0.1
COMPUT 7 003 Ill 0.0 5.3 1.0 7 2 01 25
ENDCMP 1
ENDJOB 2
OF 80-80 LIST*********++:*******,t*********t*•
220 XEQ 11/25/98 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 13
7MMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
(A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.)
=ION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
'RUCTURE CONTROL DRAINAGE TABLE MOIST TIME RUNOFF --------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
ALTERNATE 1 STORM 25
SECTION 3 RUNOFF .00 7 2 .10 .0 5.30 24.00 4.37 --- 12.20 .30 2064.8
SECTION 4 RUNOFF .00 7 2 .10 .0 5.30 24.00 4.91 --- 12.15 1.20 2194.2
SECTION 11 RUNOFF .00 7 2 .10 .0 5.30 24.00 4.66 --- 12.20 .44 2084.0
SECTION 101 ADDHYD .00 7 2 .10 .0 5.30 24.00 4.79 --- 12.15 1.52 2202.9
SECTION 102 ADDHYD .00 7 2 .10 .0 5.30 24.00 4.76 --- 12.15 1.99 2214.8
SECTION 1 RUNOFF .00 7 2 .10 .0 5.30 24.00 4.23 --- 12.20 .17 2111.2
SECTION 2 RUNOFF .00 7 2 .10 .0 5.30 24.00 3.96 --- 12.15 6.10 2027.5
SECTION 103 ADDHYD .00 7 2 .10 .0 5.30 24.00 3.97 --- 12.15 6.28 2034.2
SECTION 104 ADDHYD .00 7 2 .10 .0 5.30 24.00 4.15 --- 12.15 8.27 2074.9
SECTION 10 RUNOFF .00 7 2 .10 .0 5.30 24.00 4.88 --- 12.15 1.99 2239.2
SECTION 105 ADDHYD .00 7 2 .10 .0 5.30 24.00 4.28 --- 12.15 10.26 2104.8
SECTION 12 RUNOFF .00 7 2 .10 .0 5.30 24.00 4.50 --- 12.15 1.52 2126.8
SECTION 9 RUNOFF .00 7 2 .10 .0 5.30 24.00 5.05 --- 12.15 2.30 2205.7
SECTION 8 RUNOFF .00 7 2 .10 .0 5.30 24.00 5.01 --- 12.20 .80 2111.1
SECTION 106 ADDHYD .00 7 2 .10 .0 5.30 24.00 5.04 --- 12.15 3.15 2217.6
SECTION 107 ADDHYD .01 7 2 .10 .0 5.30 24.00 4.31 --- 12.15 11.77 2107.6
SECTION 108 ADDHYD .01 7 2 .10 .0 5.30 24.00 4.46 --- 12.15 14.92 2129.9
SECTION 5 RUNOFF .00 7 2 .10 .0 5.30 24.00 3.79 --- 12.16 3.19 1921.4
SECTION 109 ADDHYD .01 7 2 .10 .0 5.30 24.00 4.33 --- 12.15 18.11 2089.8
SECTION 6 RUNOFF .00 7 2 .10 .0 5.30 24.00 5.00 --- 12.15 1.70 2278.1
SECTION 7 RUNOFF .00 7 2 .10 .0 5.30 24.00 5.00 --- 12.15 1.47 2278.1
SECTION 99 RUNOFF .00 7 2 .10 .0 5.30 24.00 4.99 --- 12.15 2.80 2293.2
SECTION 110 ADDHYD .00 7 2 .10 .0 5.30 24.00 5.00 --- 12.15 3.17 2278.1
SECTION 112 ADDHYD .00 7 2 .10 .0 5.30 24.00 4.99 --- 12.15 5.96 2285.1
>ECTION 111 ADDHYD .01 7 2 .10 .0 5.30 24.00 4.48 --- 12.15 24.07 2135.0
.20 XEQ 11/25/98 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 14
SMMARY TABLE 3 - DISCHARGE (CPS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES
SECTION/ DRAINAGE
'RUCTURE AREA STORM NUMBERS..........
ID (SQ MI) 25
{SECTION 1 .00
ALTERNATE 1 .17
{SECTION 2 .00
ALTERNATE 1 6.10
{SECTION 3 .00
ALTERNATE 1 .30
KSECTION 4 .00
ALTERNATE 1 1.20
XSECTION 5 .00
ALTERNATE 1 3.19
XSECTION 6 .00
ALTERNATE 1 1.70
XSECTION 7 .00
ALTERNATE 1 1.47
XSECTION 8 .00
ALTERNATE 1 .80
XSECTION 9 .00
ALTERNATE 1 2.30
XSECTION 10 .00
ALTERNATE 1 1.99
XSECTION 11 .00
ALTERNATE 1 .44
XSECTION 12 .00
ALTERNATE 1 1.52
XSECTION 99 .00
ALTERNATE 1 2.80
XSECTION 101 .00
ALTERNATE 1 1.52
20 XEQ 11/25/98 N. ANDOVER JOB 1 SUMMARY
REV 09/01/83 DEVELOPMENT PAGE 15
�MMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES
'ECTION/ DRAINAGE
'RUCTURE AREA STORM NUMBERS..........
ID (SQ MI) 25
.SECTION 102 .00
ALTERNATE 1 1.99
:SECTION 103 .00
ALTERNATE 1 6.28
:SECTION 104 .00
ALTERNATE 1 8.27
:SECTION 105 .00
ALTERNATE 1 10.26
:SECTION 106 .00
ALTERNATE 1 3.15
:SECTION 107 .01
ALTERNATE 1 11.77
:SECTION 108 .01
ALTERNATE 1 14.92
:SECTION 109 .01
ALTERNATE 1 18.11
:SECTION 110 .00
ALTERNATE 1 3.17
:SECTION 111 .01
ALTERNATE 1 24.07
,SECTION 112 .00
ALTERNATE 1 5.96
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#1
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 0.00 0.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 100.00 9800.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =j 100.00 9800.00
USE CN= gg p
POST-DEVELOPMENT WATERSHED
AREA= 0.00007934 Square Miles
CN = 98.0
L= 30 Ft.
S = 1.00 %
Tc= 0.026 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#2
CALCULATED BY: BM
CHECKED BY: BM Tc = 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 40.00 2960.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 60.00 5880.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS = 100.00 8840.00
USE CN = 88 4
POST-DEVELOPMENT WATERSHED
AREA= 0.00300627 Square Miles
CN = 88.4
L= 100 Ft.
S = 15.00 %
Tc= 0.049 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#3
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 15.00 1110.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 85.00 8330.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =j 100.001 9440.00
USE CN = 94.4
POST-DEVELOPMENT WATERSHED
AREA= 0.00014409 Square Miles
CN = 94.4
L= 70 Ft.
S = 2.00 %
Tc= 0.026 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#4
CALCULATED BY: BM
CHECKED BY: BM TC= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 5.00 370.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 95.00 9310.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =1 100.001 9680.00
USE CN = gg g
POST-DEVELOPMENT WATERSHED
AREA= 0.00054598 Square Miles
CN = Poo
L= FtS =
Tc= 0.067 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#5
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 48.00 3552.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 52.00 5096.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =j 100.0078648.00
USE CN = 86.5
POST-DEVELOPMENT WATERSHED
AREA= 0.00165888 Square Miles
CN = 86.5
L= 100 Ft.
S = 10.00 %
Te= 0.065 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#6
CALCULATED BY: BM
CHECKED BY: BM Tc = 1.67L^0.8((1,000/CN)-9)"0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 0.00 0.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 100.00 9800.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS=j 100.OTO 9800.00
USE CN = 98.0
POST-DEVELOPMENT WATERSHED
AREA= 0.00074628 Square Miles
CN = 98.0
L= 130 Ft.
S = 2.00 %
Tc= 0.035 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#7
CALCULATED BY: BM
CHECKED BY: BM TC= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 0.00 0.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 100.00 9800.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =j 100.00 9800.001
USE CN = gg p
POST-DEVELOPMENT WATERSHED
AREA= 0.00064405 Square Miles
CN = 98.0
L = 130 Ft.
S = 2.00 %
Tc= 0.035 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#8
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.80,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 0.00 0.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 100.00 9800.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =j 100.0 99800.00
USE CN = 98.0
POST-DEVELOPMENT WATERSHED
AREA= 0.00037907 Square Miles
CN = 98.0
L= ?00 Ft.
S = 2.00 %
Tc= 0.049 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#9
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 0.00 0.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 100.00 9800.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =j 100.0 99800.00
USE CN= 98.0
POST-DEVELOPMENT WATERSHED
AREA= 0.00104146 Square Miles
CN = 98.0
L= 300 Ft.
S= 2.00 %
Tc= 0.068 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#10
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 5.00 370.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 95.00 9310.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS = 100.0 99680.00
USE CN = 96,8
POST-DEVELOPMENT WATERSHED
AREA= 0.00088696 Square Miles
CN = 96.8
L= 180 Ft.
S = 2.00 %
Tc= 0.048 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#11
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)"0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 10.00 740.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 90.00 8820.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =1 100.00 9560.001
USE CN= 95.6
POST-DEVELOPMENT WATERSHED
AREA= 0.00021027 Square Miles
CN = 95.6
L= 30 Ft.
S = 2.00 %
Tc= 0.030 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED#12
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L^0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 20.00 1480.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 80.00 7840.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS= 100.00 9320.00
USE CN = 93 2
POST-DEVELOPMENT WATERSHED
AREA= 0.00071371 Square Miles
CN = 93.2
L= ?10 Ft.
S = 2.00 %
Tc= 0.066 Hours
NORTH ANDOVER COMMERCE CENTER
NORTH ANDOVER, MASSACHUSETTS
SUB-CATCHMENT WATERSHED ROOF
CALCULATED BY: BM
CHECKED BY: BM Tc= 1.67L"0.8((1,000/CN)-9)^0.7
DATE: DECEMBER 4, 1998 1,900S^0.5
C AREA
SOIL NAME acres PRODUCT
AND COVER sq. mi. OF
HYDROLOGIC GROUP DESCRIPTION x % CN X AREA
GROUP C WOODS,FAIR 73 0.00 0.00
GROUP C LAWN,GOOD 74 0.00 0.00
GROUP D WETLAND 80 0.00 0.00
IMPERVIOUS PAVEMENT 98 100.00 9800.00
IMPERVIOUS BUILDING 98 0.00 0.00
TOTALS =j 100.001 9800.00
USE CN = gg p
POST-DEVELOPMENT WATERSHED
AREA= 0.00121958 Square Miles
CN = 98.0
L= t50 Ft.
S = 15.00 %
Tc= 0.021 Hours
AE1DRAINAGE SYSTEM CALCULATIONS
Appledore Engineering,Inc. Project Name: NORTH ANDOVER COMMERCE CENTER Project No. 1275 Sheet No.: 1 of 1
Calculated By: BLM Date: 11/25/98 Checked By: Date:
From Pipe Inlet To Pipe Outlet Storm Frequency: 25YR
Cross Flowline Rim Flowline Rim Flow Pipe Pipe Slope Velocity Length T.W. H.W* H.W.
Section Location Elevation Elevation Location Elevation Elevation (CFS) Size Type FT/FT FT/SEC Feet Feet Feet Elevation
111 DMH 8 107.40 118.00 OUTLET 107.25 - 24.07 36" HDPE 0.005 5.60 28 1.75 2.45 109.85
109 DMH 6 108.50 119.00 1 DMH 8 107.50 1 118.00 18.11 30" HDPE 0.005 6.60 202 2.35 2.17 110.67
107 DMH4 1 109.78 1122.00 DMH 6 108.60 1 119.00 1 11.77 1 24" HDPE 0.005 5.90 235 1 2.07 1.89 111.67
105 DMH 3 1 110.90 1 120.00 1 DMH 4 109.88 1 122.00 10.26 24" HDPE 0.005 5.70 208 1 1.79 1.72 112.62
103 DMH 1 111.35 117.20 DMH 3 111.00 120.00 6.28 18" HDPE 0.005 3.50 64 1.62 1.79 113.14
1 CB 1 112.00 115.30 DMH 1 111.45 117.20 0.17 12" HDPE 0.005 0.20 108 1.69 1.15 113.15
99 ROOF 112.94 - DMH 7 111.50 116.50 2.80 12" HDPE 0.010 5.40 144 0.96 1.19 114.13
112 DMH 7 111.00 116.50 DMH 8 110.00 118.00 5.96 18" HDPE 0.010 6.50 101 0.00 1.46 112.46
7 CB 7 111.50 116.50 DMH 7 111.10 116.50 1.47 12" HDPE 0.008 1.90 48 1.36 1.13 112.63
6 CB 6 111.50 116.50 DMH 7 111.10 116.50 1.70 12" HDPE 0.008 2.20 48 1.36 1.18 112.68
5 CB 5 113.00 118.00 DMH 6 112.70 119.00 3.19 15" HDPE 0.019 7.10 16 0.00 1.08 114.08
106 DMH 5 116.70 124.10 DMH 4 114.00 122.00 3.15 15" HDPE 0.031 8.40 86 0.00 1.07 117.77
9 CB 9 1 117.40 122.40 DMH 5 116.80 124.10 2.30 12" HDPE 0.005 3.80 114 0.97 1.02 118.42
8 CB 8 1 119.25 124.25 DMH 5 118.60 124.10 0.80 12" HDPE 0.108 9.00 6 0.00 0.52 119.77
12 DMH 9 116.80 124.00 DMH 4 116.00 122.00 1.52 12" HDPE 0.013 5.10 64 0.00 0.77 117.57
12 CB 12 117.75 122.75 DMH 9 116.90 124.00 1.52 12" HDPE 0.015 5.40 58 0.67 0.77 118.52
102 DMH 2 113.25 1119.90 DMH 3 112.60 120.00 1.99 15" HDPE 0.009 4.70 76 0.02 0.80 114.05
4 CB 4 113.70 118.70 DMH 2 113.35 119.90 1.20 12" HDPE 0.005 3.40 67 0.70 0.66 114.36
3 CB 3 113.85 118.70 DMH 2 113.50 119.90 0.30 12" HDPE 0.006 2.40 58 0.55 0.30 114.15
11 CB 11 114.50 119.50 DMH 2 114.40 119.90 0.44 12" HDPE 0.006 2.50 18 0.00 0.54 115.04
0.00
10 CB 10 115.20 120.25 DMH 3 115.00 120.00 1.99 1 12" 1 HDPE 0.011 5.10 1 18 0.00 0.92 116.12
2 CB 2 111.51 114.45 DMH 1 111.45 117.20 6.10 18" 1 HDPE 0.004 3.40 15 1.69 1.95 113.46
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 8 - OUTLET
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 3.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ........ ....... 0.0120
Entrance Loss Coefficient of Culvert Opening..... ....... 0.50
Culvert Length (feet) ................................... 28.0
Culvert Slope (feet per foot) ........................... 0.0050
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
24.1 1.75 2.33 2.45 1.45 1.58 1.75 5.62
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 6 - DMH 8
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 2.50
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) . ... ... . 1
Manning`s Roughness Coefficient (n-value) .... ........... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) .................... ........... .... 202.0
Culvert Slope (feet per foot) .... ......... ..... ........ . 0.0050
--------------------------------------------------------------------
--------------------------------------------------------------------
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
18.1 2.35 2.17 1.99 1.36 1.44 1.36 6.63
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 4 - DMH 6
NORTH ANDOVER
AEI 1275
--------------------------------------------------------------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 2.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ... ............ 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ............................... .... 235.0
Culvert Slope (feet per foot) ........................... 0.0050
--------------------------------------------------------------------
--------------------------------------------------------------------
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
11.8 2.07 1.89 1.76 1.21 1.23 1.21 5.93
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 3 - DMH 4
NORTH ANDOVER
AEI 1275
--------------------------------------------------------------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ........................I. ....... 2.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning's Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ............................ ....... 208.0
Culvert Slope (feet per foot) .................... ....... 0.0050
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
10.3 1.79 1.72 1.36 1.11 1.15 1.11 5.75
--------------------------------------------------------------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 1 - DMH 3
NORTH ANDOVER
AEI 1275
-------------------------------------------------------------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ........ ......................... 1.50
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ........ ....... 0.0120
Entrance Loss Coefficient of Culvert Opening...... ...... 0.50
Culvert Length (feet)............................. ...... 64.0
Culvert Slope (feet per foot) ..................... ...... 0.0050
--------------------------------------------------------------------
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
6.3 1.62 1.51 1.79 1.00 0.97 1.50 3.55
--------------------------------------------------------------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 1 - DMH 1
NORTH ANDOVER
AEI 1275
------------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ........ ....... 0.0120
Entrance Loss Coefficient of Culvert Opening........ ... . 0.50
Culvert Length (feet) ................. ..... . ............ 108.0
Culvert Slope (feet per foot) ......... .................. 0.0050
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
0.2 1.69 0.22 1.15 0.17 0.16 1.00 0.22
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 7 - DMH 8
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA: VALUE
DESCRIPTION
--------------------
1.50
Culvert Diameter (feet) ...........
FHWA Chart Number (1,2 or 3) •- 1
Scale Number on Chart (Type of Culvert Entrance) ........
().0120
Manning`s Roughness Coefficient (n-value) ............... 0.50
Entrance Loss Coefficient of Culvert Opening.......... 101.0
Culvert Length (feet) .............. - 0.0100
Culvert Slope (feet per foot) ..................
PROGRAM RESULTS: Depth at outlet
Flow Tail Headwater (ft) Normal Critic
l Depth at Velocity
Rate Depth Inlet outlet Depth p (fps)
(cfs) (ft) Control Control (ft) (ft) (ft)
--------------------
---------—-—------------ 0.94 0.75 0.77 0.77 6.50
6.0 0.00 1.46
SIS COMPUTERRWG�dwell, #107, Houston,Copyright
c
PIPE CULVERT ANALY 77092
Dodson & Associates, Inc- 7015
(713) 695-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
ROOF - DMH 7
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) ..................... ....... 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ................................... 144.0
Culvert Slope (feet per foot)........................... 0.0100
-----------------
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
2.8 0.96 1.19 0.57 0.63 0.72 0.63 5.36
----------------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 7 - DMH 7
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
---------------------------------------—-------—--—----------—-
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) ..................... ....... 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening........ .... 0.50
Culvert Length (feet) ................................... 48.0
Culvert Slope (feet per foot) ........................... 0.0080
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
1.5 1.36 0.75 1.13 0.46 0.51 1.00 1.87
---------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 6 - DMH 7
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) .............. .............. 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ................................... 48.0
Culvert Slope (feet per foot) ........................... 0.0080
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
1.7 1.36 0.83 1.18 0.50 0.55 1.00 2.16
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 5- DMH 6
NORTH ANDOVER
AEI 1275
--------------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.25
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ............................... .... 16.0
Culvert Slope (feet per foot) ........................... 0.0190
--------------------------------------------------------------------
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
3.2 0.00 1.08 0.87 0.49 0.72 0.49 7.06
-------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 5 - DMH 4
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.25
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ..................................1 86.0
Culvert Slope (feet per foot) ........................... 0.0310
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
3.1 0.00 1.07 -1.36 0.43 0.71 0.43 8.39
---------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-6322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 9 - DMH 5
NORTH ANDOVER
AEI 1275
-------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ..................... .............. 114.0
Culvert Slope (feet per foot) ........................... 0.0050
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
2.3 0.97 1.02 1.00 0.71 0.65 0.71 3.85
--------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 8 - DMH 5
NORTH ANDOVER
AEI 1275
--------------------------------------------------------------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ................................... 6.0
Culvert Slope (feet per foot) ........................... 0.1080
--------------------------------------------------------------------
--------------------------------------------------------------------
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (it) (ft) (ft) (fps)
--------------------------------------------------------------------
0.8 0.00 0.52 0.07 0.17 0.37 0.17 9.01
--------------------------------------------------------------------
--------------------------------------------------------------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 9 - DMH 4
NORTH ANDOVER
AEI 1275
----------------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) .. .......................... 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ................................... 64.0
Culvert Slope (feet per foot) ........................... 0.0130
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
1.5 0.00 0.77 0.12 0.41 0.52 0.41 5.08
---------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 12 - DMH 9
NORTH ANDOVER
AEI 1275
-------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ........................... ...... 1.00
FHWA Chart Number (1,2 or 3) ...................... ...... 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ........ ........................... 58.0
Culvert Slope (feet per foot) ...... . .................... 0.0150 ,
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
1.5 0.67 0.77 0.07 0.39 0.52 0.39 5.36
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
DMH 2 - DMH 3
NORTH ANDOVER
AEI 1275
------------------------------------------------------------------
--------------------------------------------------------------------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
-----------------------------------------------------------
Culvert Diameter (feet) ................................. 1.25
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ................................... 76.0
Culvert Slope (feet per foot) ...... ..................... 0.0090
--------------------------------------------------------------------
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
2.0 0.02 0.80 0.34 0.47 0.56 0.47 4.73
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 4 - DMH 2
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) . ................................ 1.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) .. ...... 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) .......... ......................... 67.0
Culvert Slope (feet per foot) ........................... 0.0050
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
1.2 0.70 0.66 0.51 0.46 0.46 0.46 3.36
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 695-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 3 - DMH 2
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) .......................I........... 58.0
Culvert Slope (feet per foot) ........................... 0.0060
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
0.3 0.55 0.30 0.27 0.21 0.22 0.21 2.43
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 11 - DMH 2
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ..... .............................. 18.0
Culvert Slope (feet per foot) ........................... 0.0060
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
0.4 0.00 0.38 0.54 0.26 0.28 0.28 2.48
------------
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CD 10 - DMH 3
NORTH ANDOVER
AEI 1275
-------------- -------
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.00
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) .......................... ......... 18.0
Culvert Slope (feet per foot) ........................... 0.0110
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
2.0 0.00 0.92 0.80 0.49 0.60 0.49 5.14
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
PIPE CULVERT ANALYSIS
COMPUTATION OF CULVERT PERFORMANCE CURVE
November 25, 1998
CB 2 - DMH 1
NORTH ANDOVER
AEI 1275
PROGRAM INPUT DATA:
DESCRIPTION VALUE
--------------------------------------------------------------------
Culvert Diameter (feet) ................................. 1.50
FHWA Chart Number (1,2 or 3) ............................ 1
Scale Number on Chart (Type of Culvert Entrance) ........ 1
Manning`s Roughness Coefficient (n-value) ............... 0.0120
Entrance Loss Coefficient of Culvert Opening............ 0.50
Culvert Length (feet) ................................... 15.0
Culvert Slope (feet per foot) ...................... ..... 0.0040
PROGRAM RESULTS:
Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet
Rate Depth Inlet Outlet Depth Depth Outlet Velocity
(cfs) (ft) Control Control (ft) (ft) (ft) (fps)
--------------------------------------------------------------------
6.1 1.69 1.48 1.95 1.06 0.95 1.50 3.45
PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986
Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092
(713) 895-8322. All Rights Reserved.
JOB
APPLEDORE ENGINEERING, INC.
SHEET NO. .--, OF
600 State Street, Suite 03 D 3 /ZE`�+>u��� DATE �96
PORT(SfMMOUTH, NH®03801 CALCULATED BYy
`603) 4h7�18 CHECKED BY DATE
SCALE
....
..........
0 r/ 2b/. 9<
.01
3
a
/f DO
,ol
V i� ..... .... ... ../ .......
l,S -7
..
APPENDIX B
2.8" 3.0"
ESSEX
FR AAK LI N
IZ 3.2" J
W YIDDLES£X S1JFFOLK \ _
k �I
2 HAYPSHIRE ORCESTER
h
Y
2'
W
�� II° � 3.
uPDEN �
3.6
G
9 5
sp
O !
RAINFALL DATA MAP 6ARxSTAB
2-YEAR, 24 HOUR PRECIPITATION (INCHES) a
0
t
NANTUCKET !
t
TP-40
• � i
I
3.8"
ESSEX
FRAMKLIK
KIDDLESEX SUfF K
2` WORCESTER ^ 0�
aH A we"-,"R£ 'T
W
m
4.2 1I
HAwlroc � <,c 4.4" 1
L
_ by
a _
. C i
RAINFALL. DATA MAP LA1MtST f
4.
5-YEAR,24-HOUR PRECIPITATION (INCHES)
V
NANTUCKET
TP-40
I
FIGURE !-I ,SHEET I OF 3
e•22
1
t
4.211 4.411 4.51I
4.311
It
ESSEX 4.6
FRANYLIN
MIDDLESEX SJFFOLK
11
c WORCESTER 4.7
2 HA►iPSHIRE
N
HAMPDEN
9
4.811
O
gARH57AB'C
RAINFALL DATA MAP
11
4.9
Ip—YEAR, 24 HOUR PRECIPITATION (INCHES) DUKES
��A
NANTUCKET
TP-40
5.3 n
5.0 5.1 5.211 5.411
ESSEX S
FRANKLIN 5.5
MIDDLE EX SUFFOLK Ov
a WORCESTER
r`
y HAMPSHIRE
W
f
5.6
SOP �
HAMPDEN O M
5.7
- O
BARNS W-
RAINFALL DATA MAP 5 8"
25—YEAR,24—HOUR PRECIPITATION (INCHES) �
a3
N�U CKE
TP-40
FIGURE B—I ,SHEET 2 OF 3
8-23
5.6 5.711 5 911
ESSEX
FRANKLIN
6. 011
w VI DOLE SEX S:.rFOLK II i
6.1
HA1(PSHIRE WO CESTER
Y _
W
6.211
HALPDEN lIOF(
6.3'I
G
1 I
RAINFALL DATA MAP o 6ARNSTABL
50-YEAR,24 HOUR PRECIPITATION (INCHES)
�a DUK 6.5 I�
f
kANTUCKET
TP-40 i
i
i
6 >+ 6.4"
$SEX i
FRANKLY( '
w 6.6" '
MIDDLESEX 5UfTOtK C
z ORCESTER J
k HAYt'f.rw1[ N � lvJ _
m
6.8
HA.W DIE N N�
7 "
10 i
RAINFALL DATA MAP '
7.2"
100-YEAR,24-H4U}t PRECIPITATION (INCHES) �"`-
MANTUCRLT
TP-40
Ji FIGURE 8-1 ,SHEET 3 of 3 ,
i
9-2 4
o.S
/
/ G = �yOU � ��Ui�'Ti O�✓
f --CA-(IT I'L3.(CFGtw !(CT
O 0
S $ O o 3 o3go Q 5 0 3 oar?
In J
14
`t
rt0
1 : I
1100[OJ
•wCRt 3. ICMO_p
HMO CM•MTOROL=IC$OIL COVER
COMPLZX RuMRCR
t
1 1
1
1
I I
EXAMPLE
Orvtw 1.1300 t,..T.CY.•Cw.73 T� .fMT CR3Mt0 TIME Of CONCENTRATION!R MOVR3
SOLUTION IT CHART to. O $0.1 1
�— 7.T
EXHIBIT 4 — C,.:—te number method for estinstimg ___e of concentrstica ('c) for
up to 2,000 acre homogeneous watersheds under cor.ditions.
G/ti1JG-'.� _c2Gvv � '•�cS. /�D.2/j1U�•4 /�.S UC%zy G—avc� W�/c�:�E
w��� icvc� T� Uv�z• �..�T�.�->� ��c .�-pow. �,yi,� �Ji��
Gi -A
Al-17
4/87
TABLE 6-4.3 -- RUNOFF CURVE NUMBERS (Average Watershed Condition)
COVER DESCRIPTION CURVE NUMBERS FOR HYDROLOGIC SOIL GROUP
Hydrologic
Cover type and hydrologic condition condition6 A 8 C D
NON-CULTIVATED AGRICULTURAL LAND
Pasture, grassland, or range - continuous forage
for grazing poor 68 79 86 89
fair 49 69 79 84
good 39 61 74 80
Meadow - contlmxxis gross, protected from grazing
and generally mowed for hey --- 30 58 71 73
Woods-grass combination (orchard or tree farm) poor 57 73 82 86
fair 43 65 76 82
good 32 58 72 79
Brush - brush-weed-grass mixture with brush the
major element poor 48 67 77 83
fair 35 56 70 77
good 30 48 65 73
N '
~' Woods poor 45 66 77 83
fair 36 60 73 79
good 30 55 70 77
Farmsteads buildings, lanes, driveways, and
surrounding lots --- 59 74 82 86
6. Poor hydrologic condition has less then 50 percent ground cover density.
Fair hydrologic condition has between 50 and 75 percent ground cover density.
Good hydrologic condition has more than 75 percent ground cover density.
Source: USDA Soil Conservation Service
TABLE 6-4.2 -- RUNOFF CURVE NUMBERS (Average Watershed Condition)
COVER DESCRIPTION
CURVE NUMBERS FOR HYDROLOGIC SOIL GROUP
F
d hydrologic condition Hydrologic
corxlition4 A 6 C
AL LANDre soil
op residue cover (CR) 77 86 91 94
poor 76 85 90 93
god7483 90
raight row (SR) poor 72 81 88 91
SR & CR good 67 78 85 89
SR & CR poor 71 80 87 90
Contoured (C) good 64 75 82 85
C poor 70 79 84 88
C & CR good 65 75 82 86
C & CR poor 69 78 83 87
Contoured & Terraces (C&T) good 64 74 81 85
C&T poor 66 74 80 82
C&T & CR good 62 71 78 81
C&T & CR poor 65 73 79 81
N Smell groin SR
good 61 70 77 80
p SR poor 65 76 84 88
SR & CR good 63
• 75 83 87
SR & CR poor 64 75 83 86
C good 60 72
C poor 63 80 84
C & CR good 61 82 85
73
81 84
C & CR poor 62
C&T good 73 81 84
C&T poor 60 72 80 83
61 72 79 82
C&T & CR good S9 70 78 81
C&T & CR poor 60 71 78 81
Close-seeded SR
god 58 69 77 80
Legumes or SR poor
Rot Ott
C good 56 72 85 89
Meadow C poor 83 85
C&T good S5 69 85
C&T poor 63 78 83
good 73 80 83
4. For conservation tllla a S1 67 76 80
750 8/acre row crops or 300a/acrersmall condition, 5 to 20 percent of the surface Is covered with residue (less than
For conservation tillage grain).
g good hydrologic condition, more than 20 percent of the surface is covered with residue
(greater than 750 N/acre row crops or 300 Vacre small grain).
5. Ctose-drilled or broadcast.
Source: USDA Soil Conservation Service
i
TABLE 6-4. 1 -- RUNOFF CURVE NUMBERS (Average Watershed Condition)
COVER DESCRIPTION CURVE NUMBERS FOR HYDROLOGIC SOIL GROUP
Average percent
Cover type and hydrologic condition impervious area2 A B C D
FULLY DEVELOPED URBAN AREASI (Vegetation Established)
Lawns, open spaces, parks, golf courses, cemeteries, etc.
good condition; grass cover on 75% or more of the area 39 61 74 80
fair condition; grass cover on 50X to 75% of the area 49 69 79 84
poor condition; grass cover on 50% or less of the area 68 79 86 89
Paved parking lots, roofs, driveways, etc. 98 98 98 98
Streets and roads;
paved with curbs and storm sewers 98 98 98 98
gravel 76 85 89 91
dirt 72 82 87 89
paved with open ditches 83 89 92 93
Commercial and business areas 85 89 92 94 95
Industrial districts 72 81 88 91 93
Row houses, town houses, and residential
with lot sizes 1/8 acre or less 65 77 85 90 92
b Residential
Average lot size
1/4 acre 38 61 75 83 87
1/3 acre 30 57 72 81 86
1/2 acre 25 54 70 80 85
1 acre 20 51 68 7q 84
2 acre 12 46 65 77 82
DEVELOPING URBAN AREAS3 (No vegetation Established)
Newly graded area
77 86 91 94
1. For land uses with impervious areas, curve numbers are computed assuming that 100% of runoff from Impervious areas is
directly connected to the drainage system. Pervious areas (town) are considered to be equivalent to lawns in good
condition and the impervious areas have an RCH of 98.
2. InctWes paved streets.
3. Use for the design of temporary measures during grading and construction. Impervious area percent for urban areas
under development vary considerably. The user will determine the percent impervious. Then using the newly graded area
RCN and Table 6-4, the composite RCN can be computed for any degree of development.
Source: USDA Soil Conservation Service