Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 1761 SALEM STREET 10/2/2023 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 1761 Salem Street MAP: 106.B LOT: 0089 INSTALLER: Peter Nardone DESIGNER: Thorsen Akerley – 978-539-8088 PLAN DATE: 11-24-21 BOH APPROVAL DATE ON PLAN: 12.05.2021 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 10.06.2022 S.Casey DATE OF FINAL CONSTRUCTION INSPECTION: 12-20-22 D. Ottenheimer DATE OF FINAL GRADE INSPECTION: S. Casey SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: 12-20-22 – Building sewer was not where shown on design plan, contractor adjusted tank location accordingly. Ok. D. Ottenheimer SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction If monolithic, water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle installed Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum ___ inch diameter Pipe penetrations appear watertight using rubber boots Comments: 12-20-22 – Installer to provide at least one riser with manhole cover to within 6” of finished grade. D. Ottenheimer DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: 12-20-22 – One outlet from distribution box to Enviro-Septic bed. D. Ottenheimer SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header (and vented if impervious material above) Retaining wall material, location and height if specified on plan Comments: SOIL ABSORPTION SYSTEM (Other) 12-20-22 Enviro-Septic system installed. Size per plan. D. Ottenheimer FINAL GRADE Final cover as per plan Loamed Seeded Comments: Cover to Grade – S. Casey DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 107.57 HR = 3.05 HI = 110.62 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 1.29 109.00 109.0 Septic Tank IN 2.97 107.32 107.17 Septic Tank OUT 3.20 107.09 106.92 Distribution Box IN 4.15 106.14 106.02 Distribution Box OUT 4.36 105.93 105.85 Lateral 1 IN 4.62 105.67 105.68 Lateral 1 TOP OF 4.53 106.09 106.10 ENVIRO-SEPTIC