Loading...
HomeMy WebLinkAbout2004-02-05 Traffic Mitigation Commitment Transportation Land Development Environmental Services r ' imagination Innovation I energy Creating results for our clients and Imiefits for our communities October 22,2003 Vanacce Hanom 13rustZ�n_ rnc. Ref: 08354.00 Mr. Lionel Lucien, P.E. Manager, Public/Private Development Unit Massachusetts Highway Department 10 Park Plaza, Room 4150 Boston, MA 02116 Re: Updated Ttkffic ntlgation commitment Proposed Eaglewood Shops--Route 114 North Andover, Massachusetts EOEA 13041 Dear Mr. Lucien: Based on.recent discussions with MassHighway,we are providing this updated commitment letter on behalf of Eaglewood Properties, LLC(the"Proponent'). This letter Is intended to clarify the mitigation commitments outlined in our letter of September 15,2003, which was Included in the Single Environmental Impact Report for the above-mentioned project. This Information is being provided for your review and consideration,and to hopefully be incorporated Into the Section 61 Finding for this project. The proposed Eaglewood Shops building program presented in the SEIR has remained unchanged, outside of minor design details being evaluated as part of the local approval process. The traffic impacts and site access plan associated with the project have been presented In Chapter 2 of the SEIR. The suggested mitigation commitments were developed based on the analysis presented in the study,and extensive ongoing consultation with MassHighway and interested abutters. These mitigation commitments have been further clarified per your request. The Proponent will construct the following traffic mitigation measures as follows: ➢ Widen Route 114 (Turnpike Street)within the existing state highway layout by five-feet or less to provide an exclusive left-turn lane into the proposed Eaglewood Shops site; ➢ Widen Route 114 (Turnpike Street)along the project site frontage between the proposed Eaglewood Shops driveway and the Eagle Tribune driveway to provide an exclusive right-turn lane into the proposed Eaglewood Shops site. The proponent will provide the required land to MassHighway through a no-harm land taking agreement; ➢ Install a fully-actuated traffic signal at the intersection of Route 114 and the Eaglewood Shops, which is proposed to be located at least 250 feet from the Dearest driveway to the adjacent Northmark Bank property; ➢ Provide Opticom emergency-vehicle pre-emption equipment where required within the proposed four-signal system along Route 114; 101 walnut Street Post[Office Box 9151 i Watertown, Massachusetts 02471-9151 617.924.1770 w FAX 617.924,2286 \\NfawUd\ld\06354\does\reports\SEW\Ntlligailon Commit rer.doc ernaiis Info@vhb.eom www.vhb.com i