Loading...
HomeMy WebLinkAbout43 Mill Road - NACC #315 Small Project Approval - Permits #NACC #315 - 43 MILL ROAD 11/15/2023 CONSERVATION DEPARTMENT Community &Economic Development Division Kate Morales 43 Mill Road North Andover, MA 01845 November 21, 2023 43 Mill Road, North Andover In Find Replacement of Front Porch & Stairs Conditions of Approval, NACC #315 Pursuant to section 4.4.2 of the North Andover Wetlands Protection Regulations, homeowner Kate Morales, filed for a Small Project Permit application for work proposed at 43 Mill Road in North Andover. The previous front porch and stairs had degraded and collapsing beyond repair and were removed for safety. A new front porch and stairs will be built in the exact same footprint. The work involves: construction of an 8'4" by 3'l 0" enclosed porch and associated 8'l" by 3'4" stairs and railings. The preexisting footings were installed 48" below grade. At its closest, the porch will be approximately 75' from bordering vegetated wetland on the property. Construction access and equipment should be mindful of the septic tank location, and its weight bearing capacity. During the November 15, 2023 public meeting,the North Andover Conservation Commission (NACC) found this project to qualify as a Small. Project Permit and voted unanimously to approve this project as proposed under Category "L" Other similar projects of minimal impact; as determined by the North Andover Conservation Commission, subject to compliance with the conditions listed below. The project is approved only as it relates to the Conservation Commission and any and all other approvals should be obtained by the applicant/homeowner. All work shall conform to the following: RECORD DOCUMENTS: • Small Project Application, including application clrceldist with supporting narrative and attachments, received October 30, 2023 • Annotated Subsurface Sewage Disposal System plan shoving preexisting front porch and stairs. The following conditions are hereby mandated: CONDITIONS: 43 Mill Road—Small Project Permit Approval.Category L Page I oft I. Erosion controls, in the form of 8" mulch socks, must be installed between the limit of work and the wetlands. All materials are to be stockpiled on the upland side of the erosion controls. 2. Prior to work commencing, a preconstruction meeting with Conservation Department Staff, the applicant, and the contractor will be required, to inspect the erosion controls and discuss the project scope and these conditions. 3. A post-construction inspection shall be scheduled with the Conservation Department to verify compliance when work is complete and approve removal of the erosion controls. The applicant, homeowner and their contractors are advised that NO other work on the property is allowed under this permit. The NACC has jurisdiction over all of the wetlands and associated I 00-Foot buffer zones on site and any work I t involves round disturbance or _qq_ �-�rqp chap gh V,the current conditions in these areas will require permitting with the NACC. This includes, but are not limited to, house additions, pools, patios, decks, sheds, fences, garden beds landscaping and bridge installation, tree or vegetation cutting/pruning. These activities shall be held to the current standards tinder the Bylaw and the WPA. ** Should you have any question or comments regarding the contents of this letter, please do not hesitate to contact the undersigned at(978)-688-9530. Thank you for your anticipated cooperation with this matter. Respectfully, NO —H ANDOV 4JURI (CONSERVATION DEPARTMENT Amy R. axner Conservation Administrator 43 Mill Road-Small Project Permit Approval Category L Page 2 of 2