Loading...
HomeMy WebLinkAboutSeptic Approval Letter - Correspondence - 62 BANNAN DRIVE 8/9/2022 Forth Andover Health Department (oraarratrnity and Ronomiic Development Division August: 9, 2022 George 1:)unhaain 62 Bannaan 17rive North Andover, MA 01 845 Re. Subsurface Sewa ,e Disposal System flan for 62 13anaan Drive (Map 38 Lot 11 War Mr. I)unha.rra; The proposed onsite wastewater system design plan f'or the; above site dated 6/,5/22 with a final revision date. cat'7/3tl/2.2 has been approved I"r.ar issuance cal`a T)isposal System Construction Permit (I)SC P). Once, issued, a I)SCP will authorize the construction ot`the onsite wastewater system per the, plan referenced above and is allowed under Tide 5 ofthe Massachusetts l'ravironniental Code (510 C:"MIS 15.000), You will need Involvement rinom the designer cat`the onsite wastewater system throughout the installation process sea you should be sure to coordinate with them. The design has been approved far use in the construction ol`an Upgrade on-site wastewater system liar as 4-pedroorn (naaviaaaa:rn1 9-1-00111) lacasnC utilifing the propose(] septic tank and ca. standard stone-and-pipe sail absorption system as indicate(] can the design plan. The goal fir system upgrades is to aachieve, full compliance with state and local onsite wastewater regulations, In this instance:, Full compliaa.nce, was not achieved because (lie design includes as request 1<br Local Upgrade Approvals and variances from the North Andover Onsite Wastewater Regulations sccl(ing to vary From the standards cat`pull compliance. TDais letter serves to cicacunaent the endorsernent cal"these Local l.lpgrade Approvals and variances, by (lae North Andover health I)epartment. This design playa approval is valid for 2 years 1'rorn the; above date, During this tithe, a licensed septic system irlStaller shcauld captain as permit and complete this work, and a Certificate of C"onipliance be endorsed by the installer, designer„ and the Town of*North Andover-. II`thesc Page 1 ca 3 North Andover Ileaalt.h I)epa:rt.ment, own Ilaall, 120 Main `street No rtla Andover„ MA 01845 Phone- 978; 68 l.tp540 Fax„ 978.688. 9542 activities are not completed within this time period then. it is possible a new design plan will need to be completed and submitted for review, In the event an imminent health problem such as sewage backup into the dwelling is occurring the North Andover Board of Health may reduce the time period for which this plan is valid. This approval is subject to the f'ollowing conditions. Please be sure to review these with the designer and installer. Prior to the issuance ofa Disposal System C,onstruction Permit: a, The area of the proposed Sol] Absorption System (SAS) is to be staked and flagged to identify the location(s) and to prevent activities which might damage the soil absorption system. Stockpiling of i-riatcrials and equipment within the SAS area is prohibited b. Approval for the work to OCCUr Must be obtained from the North Andover Conservation C,onirnission Throughout the project: a. If site conditions are fiAll1d in the field to be different frorn those indicated on the design plan, installation of the onsite wastewater system shall stop and the designer and this oft.-ice notified within 24 hours b. If grOLlridwatcr is present at the bottom portion of the excavation for the soil absorption system (SAS) the excavation is to be dewatered prior to the placement ofany fill. No fill is to be placed for the SAS during rain or snow storms. Prior to placement ofany needed fill in the SAS, the bottom is to be seal-ified and relatively dry and the fill material is to be stockpiled at the edge of the excavation and filled in graduafly c. Inspections arc to be performed by the designer of the onsite wastewater system as needed to properly oversee and document construction. At a minimum these are the initial excavation, prior to backlilling, and during backfilling as well as any other component of the Construction which the designer wishes to examine (L Inspections are to be completed by the ,_town ot'North Andover at a minimum as follows: i. Bed bottom ii. Tairk bottom iii, Final installation of'components, confirmation of'proper component selection, examination ot'construction methodology, and systern operation iv. Final grade v. Sand fill will be collected from at least one location and analyzed for compliance with. specifications in Title 5 e. No components are to be covered Until a final component inspection has been completed E No excavation for or work associated with consti-LIC6011 of the soil absorption system is to occur fi-om November 30 to April I After Construction: Page 2 of 3 North Andover Health Department, Town Hall, 120 Main Street, North Andover, MA 01845 Phone- 978.688.9540 Fax: 978,688. 9542 g• Within 30 days of completion ofconstrUCti011 the installer and designer are to confirm if the installation Nvork was completed in compliance with the design plan, referenced in the DSCP and with Title 5, and il'so shall certify this oil as Certificate of C,ornpliance firma. It. It'changes have been made to the approved plans then preparation of an as-bUilt plan is required to be completed by the designer. Iftio changes have been niade to the approved plans then the approved plan shall be modified by the designer to show the distance,,,; from as known structure to the system components. i. No sewage shall be dischargcd to the onsite wastewater system until a Certificate of'Compliance has been issued by this office In addition, )/oil ShOLlId be aware of the long-term operation guidelines ofan onsite wastewater system (these are not part of the DSCP I)LIt rare mentioned below as information for the property owner): I. An onsite wastewater system can function Lis yin integral part of the infrastrUCtUre of the property if it is properly operated and maintained. This is the responsibility ofthe owner ofthe property and is generally not specified by regulation. You are encouraged to contact a wastewater system pU 11-1 Per/sery ice provider to partner with YOU to implement steps needed tea assure the longevity ofthe onsite wastewater system being installed at this location The iSSUance of DSCJI does not construe and/or imply compliance with, ,:any permits, approvals or licenses which might be needed from other agencies such as the Conservation Commission, /oning Board, Planning Board, Building Inspector, PIL1111bing Inspector and/or I'llectrical Inspector. Please feel free to contact the office with any (ItIeStiOlIS YOU may have. We look forward to Working with YOU to obtain a wastc\A/ater treatment and dispersal system which will be in compliance with all regulations aild aSSLIN, protection of'public health and the environment of North Andover. Sincerely, 1: Han J. LaGrasse, (1,11T Public Health Director FIncl. Installers list Cc: Vladimir Nerrichenok, I-I.E. 1,He ....... .... Page 3 of3 North Andover I lealth Depallmem., Town Hall, 120 Main Street, North Andover, MA 01845 Phone- 978.688.9540 Fax: 978.688. 9542