Loading...
HomeMy WebLinkAboutAs Built Check list - As-Built Plan / Installation Certificate Form - 62 BANNAN DRIVE 9/14/2023 Town of North Andover — Septic System - AS--BUILT CHECKLIST 1) All changes to the design plan have been reflected and noted on the as-built plan 2) 7 -built plan has a suitable scale; (1 inch=40 feet or fewer for plot plans) 3) - Street Address,Assessor's Map and Lot Number 4) _)(6,ot Lines and Location of Dwellings served by the system V Locations,Elevations and Dimensions of As-built system components,including reserve (if applicable) 6) V Ties to all tank openings,d-box,and leach area from dwelling or Permanent Structure r Setback distances are shown on the as-built plan from system components to: Subsurface,interceptor&foundation drains Catch basins Property lines _ wellings or other structures Private water supply or irrigation wells Watercourses or wetlands g) cations of Wells,Drains,Wetland Resource Areas within I So feet of system 9) Location of water,gas,electric lines,cable,control panel (if applicable) 10) Location of Structures within 6 Inches of 1�ir1i.shed Grade 11) Original Stamp&Signature 12) " Location and holder of any easements which could impact the system 13) / Impervious Areas;Driveways,etc 14) —7 orth Arrow 15 Location&Elevation of Benchmark use d 16) /STATEMENT ON PLAN (NA 5.3) &. `,T cez*Tjr the locations, elevations, ties,covermaterial;exposed component covers etc., shown on this as-builtsubstantiallyagree with the approvedplarr andJxave det.:rmined that the bzrakout elevations,ifappEcable,have been met." Signature of Designer Date b. "Ii a S7UC7TIW WALL IS a Letter or statement on the as-built irldieatirz� the wall- wastor was not constructed in accordance with the intended desistn andv manufacturer's soecif'cations Signature of Designer Date As of:Tuesday,March 17,2015 co ,a `�