HomeMy WebLinkAbout- As-Built Plan / Installation Certificate Form - 62 BANNAN DRIVE 9/14/2023 SUMMARY OF INVERTS BUILDING TIES
SEWER ® F'DTN. 95.79 BLDG. CORNER A B C D NQ THIS PLAN & CERTIFICATION 1S NOT
SEPTIC TANK IN 95.56 SEPTIC TANK IN 16.0 25.3 — — A WARRANTY OF THE SUBSURFACE DISPOSAL
SEPTIC TANK OUT 95.34 SEPTIC TANK OUT 23.5 28.8 — — SYSTEM. IT IS A RECORD OF THE LOCATION
DIST. BOX IN 95.02 1 DIST. BOX 34.3 43.0 — AND ELEVATION OF THE EXISTING SYSTEM
DIST. BOX OUT 94.89 COMPONENTS.
LEACH LINE #1 BEG 94.83
LEACH LINF-J2 BEG 94.84 "1 HEREBY CERTIFY THE LOCATIONS, ELEVATIONS, TIES, COVER MATERIAL;
LEACH LINE #3 BEG 94.84 EXPOSED COMPONENT COVERS ETC., SHOWN ON THIS AS—BUILT SUBSTANTIALLY
LEACH LINE #4 BEG 94.84 AGREE WITH THE APPROVED PLAN AND HAVE DETERMINED THAT THE BREAK
LEACH LINE #1 END 94.67 OUT ELEVATIONS, IF APPLICABLE, HAVE BEEN MET."
LEACH LINE #2 END 94.68
LEACH LINE #3 END 94,66
LEACH LINE #4 END 94.65 C r
SIGNATURE OF DESIGNER DATE
7�66
LOT 5
(25,343 S.F.)
EDGE CAE'WETLAND BY
4i1 NOItSE ENVIRONMENTAL
SERVICES SAAY. 2022.
^ AL. 3A �
N k7 _
4A
� 5 A
N/F BROOKS aA
p°RCH 1500 GAL
o MONOLITHIC
F�k SEPTIC TANK �o
=4 M Fcz� 6 7A
T
4� ®' o" OUTLET aA AL N/F CHEN
DIST. BOX
\ 3S LEACH FIELD
(700 S.F.)
Sr 9A
r / INSP. PORT
7.6 0 r �/ coN� / . AL.
VENT �o
f TaA
� o
BANNAN DRIVE\ 115.43
N/F BLACKSHAW
AS BUILT PLAN
OF
SUBSURFACE DISPOSAL SYSTEM
LOCATED IN
NORTH ANDOVER, MASS./62 BANNAN DRIVE
AS PREPARED FOR
OF GEORGE DUNHAM
TM: 38
VLADIMIR L. G
� -DATE: 9-14-23
o� NEMCHENOK , SCALE: 1"=40'
TL: 112 0 20 40 80
p c1 STD
TONAL MERRIMACK ENGINEERING SERVICES
0 66 PARK STREET
ANDOVER, MASSACHUSETTS 01810