Loading...
HomeMy WebLinkAbout- Consultant Review - 62 BANNAN DRIVE 12/13/2023 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 62 Bannan Drive MAP: 38 LOT: 112 INSTALLER: Chad Jablonski – 978-360-9358 DESIGNER: Bill Dufense – 978-502-6206 or 978-475-3555 x 20 PLAN DATE: 06.03.2022 BOH APPROVAL DATE ON PLAN: 11.01.2022 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 08.02.2023 DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Comments: Tank Shifted – B. LaGrasse SEPTIC TANK Building sewer in continuous grade, on compacted firm base Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction If monolithic, water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle / effluent filter installed (circle one) Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum _20__ inch diameter Pipe penetrations appear watertight using rubber boots / hydraulic cement (circle one) Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled Laterals installed and ends capped or connected to header (and vented if impervious material above) Comments: Bed bottom needs to be done in stages due to site constraints and dewatering FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = HR = HI = SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT Septic Tank IN Septic Tank OUT Pump Chamber IN Pump Chamber OUT Distribution Box IN Distribution Box OUT Lateral 1 BEGINNING Lateral 1 END Lateral 2 BEGINNING Lateral 2 END Lateral 3 BEGINNING Lateral 3 END Lateral 4 BEGINNING Lateral 4 END Lateral 5 BEGINNING Lateral 5 END Lateral 6 BEGINNING Lateral 6 END Top of Chamber Bottom of Bed/Chamber SKETCH PLAN CRITICAL SETBACK DISTANCES Mark those distances checked in the field against the design plan and regulatory setback Tank SAS Sewer Property line 10 10 -- Cellar wall 10 20 -- Inground pool 10 20 -- Slab foundation 10 10 -- Deck, on footings, etc 5 10 -- 1 Waterline 10 10 10 2 Private drinking well 75 100 50 Irrigation well 75 100 Surface Water 25 50 Bordering Vegetated Wetland , 3 Salt Marsh, Inland / Coastal Bank 75 100 Wetlands bordering surface water supply or trib. (in Watershed) 150 150 Trib. to surface water supply 325 325 Public well 400 400 Interim Wellhead Prot. Area Reservoirs 400 400 Drains (wat. supply/trib.) 50 100 Drains (intercept g.w.) 25 50 Drains (Other) Foundation 10 (5) 20 (10) Drywells 20 25 1 Suction line 222(2) 2 100 feet is a minimum acceptable distance and no variance is allowed for a lesser distance (NA 5.02). 3 As defined in 310 CMR 10.55, 10.32, 10.54, and 10.30, respectively, pursuant to 15.211(3), also by NA wetland bylaws