HomeMy WebLinkAboutMill River - Consultant Review - 40 DUNCAN DRIVE 12/28/2023 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 40 Duncan Drive MAP: 104.B LOT: 0051 INSTALLER: Peter Breen 978-687-7774 DESIGNER: Vladimir Nemchenok / Bill Dufresne Merrimack Engineering 978-475-3555 PLAN DATE: 09.30.2023 BOH APPROVAL DATE ON PLAN: 10.25.2023 INSPECTIONS TANK INSPECTION: 11.16.2023 DATE OF BED BOTTOM INSPECTION: 11.15.2023 – 11.16.2023 DATE OF FINAL CONSTRUCTION INSPECTION: 11/28/2023 – D. Ottenheimer DATE OF FINAL GRADE INSPECTION: 11/30/2023 S. Peirce SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: 11/28/23 – Two building sewer pipes are present as noted on design plan. – D. Ottenheimer SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction If monolithic, water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port Effluent filter installed If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum 20 inch diameter Pipe penetrations appear watertight using hydraulic cement Comments: 11/28/23 – Building sewer pipes are backfilled, could not examine. – D. Ottenheimer PUMP CHAMBER (Delete if not present) Bottom of tank hole has 6" stone base Weep hole plugged 1000 gallon Pump Chamber installed H-10 loading Monolithic tank construction Inlet tee installed, centered under access port Pump(s) installed on stable base Alarm float working Pump On/Off floats working Drain hole in pressure line 20” cover at final grade installed over pump access port Water tightness of tank has been achieved by Visual testing Hydraulic cement around inlet & outlet Comments: 11/28/23 – Switched to different pump. Designer submitted cut sheet previously. D. Ottenheimer CONTROL PANEL (Delete if not present) Alarm & Pump are on separate circuits Visual & audible alarm works as intended Location of control panel: Basement Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: 11/28/23 – One pipe exiting box was pitched up, contractor fixed while present. – D. Ottenheimer SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header and vented Retaining wall material, location and height if specified on plan Comments: FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 100.00 HR = 2.78 HI = 102.78 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT Septic Tank IN 96.15 Septic Tank OUT 95.90 Pump Chamber IN 95.85 Pump Chamber OUT Distribution Box IN 2.85 99.60 99.60 Distribution Box OUT 3.01 99.44 99.43 Lateral 1 BEGINNING 3.12 99.33 99.35 Lateral 1 END 3.24 99.21 99.20 Lateral 2 BEGINNING 3.13 99.32 99.35 Lateral 2 END 3.23 99.22 99.20 Lateral 3 BEGINNING 3.13 99.32 99.35 Lateral 3 END 3.24 99.21 99.20 Lateral 4 BEGINNING 3.11 99.34 99.35 Lateral 4 END 3.25 99.20 99.20 11/28/23 – Contractor reports tanks were set lower than specified on design plan because the building sewer pipe was deeper than indicated on design plan. – D. Ottenheimer