. , .';General;information .
Project Name Crosspoint North Andover
NPDES Tracking No, MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No.1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection November 18, 2021 Start/End Time 9:00-9:45 AM
Inspector's Name(s) Jared Walsh
Inspector's Title(s) Sr. Des€gn Engineer
inspector's Contact (617)849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Active interior building work taking place for Building A. Steel framing working
construction occurring for Building B. Sidewalk subgrade construction within the R.O.W. of
Andover Street being performed.
Type of Inspection:
0 Regu[ar ❑ Pre-storm event ❑ During storm event ❑ Post-storm event
Weather lr'46rrriation
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Start Date &Time: 1:00 AM (I 1/15)Storm Duration (hrs): 3 Approximate Amount of Precipitation (in): 0.08
Weather at time of this Inspection?
N Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 60"F
Have any discharges occurred since the last Inspection? ❑Yes RNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes MNo
If yes, describe:
Site-specific 13MPs
BMA •BMA, Garredtive Action Needed and,Notes
Installed? Illlalntenarice ,
Re u.recf?.
�.Y. .
1 Perimeter sift fence pYes ❑No ❑Yes NNo
2 Silt sacks NYes ❑No ❑Yes NNo
3 Compost filter tubes pYes ❑No ❑Yes NNo
4 Perimeter const. fence NYes ❑No []Yes ®No
5 Const. entrance/exit ®Yes El No ❑Yes ®No
6 ❑Yes ❑No []Yes ❑No
7 ❑Yes MNo ❑Yes ❑No
8 ❑Yes ❑No ❑Yes ❑No
E10
❑Yes ❑No ❑Yes ❑No
❑Yes ❑No ❑Yes ❑No
2021-11-04_Crosspoint-NAndover Inspection,docx
Overall Site Issues
amp/activity ]nipleinerited? Il�ainteria'nce Gorractive'Acb6h Needed and Notes
Re .uired?
1 Are all slopes and ®Yes ❑No ❑Yes ❑x No
disturbed areas not
actively being worked
oronerlv stabilized?
2 Are natural resource MYes ❑No ❑Yes ONo
areas (e,g., streams,
wetlands, mature
trees, etc,) protected
with barriers or similar
BIVIPS?
3 Are perimeter controls Ayes []No ❑Yes NNo
and sediment barriers
adequately'installed
(keyed into substrate)
and maintained?
4 Are discharge points MYes ❑No ❑Yes IANo
and receiving waters
free of any sediment
deposits?
6 Are storm drain inlets MYes ❑No ❑Yes NNo
properly rotected?
6 Is the construction exit ®Yes ❑No ❑Yes NNo
preventing sediment
from being tracked
into the street?
7 Is trash/litter from ❑Yes ®No ❑Yes NNo
work areas collected
and placed in covered
dum stets?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
Inside or under cover?
11 Are non-stormwater ®Yes []No []Yes NNo
discharges (e.g„wash
water, dewatering)
properly controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time, Any and all changes will be forwarded
sequence? for Planning Approval.
2021-11-04_Crosspoint-NAndover Inspectlon.docx
I
i
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
1 certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my Knowledge and belief,true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for Knowing
violations."
Print name and title: Jared Walsh, E.I.T.
Signature:
Date., 11/18/2021
2021-11.04_Crosspo€nt-NAndover Inspection,docx
f
d • i�• I1� 1
e �
r � I
a
ju
Bid Ad
rrn .! -w
, f
{Z
T�
i
1 W
:'''
13
i
r s l�h ,.t i s s7 f s✓ :•:t �,� y�l t
,�� 4}f�✓j � ���
y
I
0
i
+ I
h
Es' 0 H L E R 9
y 4r I
r
K u
1 RRR Ali ��I
p' .
..................
Photo 3: On-going construction of Building A.
Photo 4: On-going construction of the metal framing for Building B.
t
now
BUHLtR //
:+ m
Y `
4 T�
mn . .'.
ram'
Hai
Photo 5; Landscape plantings delivered to the site to be installed.
11/8/21,3:32 PM Town of North Andover Mail-Fwd:Crosspolnt North Andover-Monthly Inspection Reports �f �
NoR' f-ANDovE�.
Massaphus'ile ' Bonnie Wolstromer<bwolstromer@northandoverma.gov>
Fwd: Crosspoint North Andover - Monthly Inspection Reports
1 message
.lean Enright <jen rig ht@northandoverma.gov> Mon, Nov 8, 2021 at 3:18 PM
To: Bonnie Wolstromer<bwolstromer@north and overm a.gov>
For processing.
-------- Forwarded message .........
From: Jared Walsh <jwalsh@bohlereng.com>
Date: Mon, Nov 8, 2021 at 2:48 PM
Subject: RE: Crosspoint North Andover-Monthly Inspection Reports
To: Jean Enright<jenright@northandoverma.gov>
Cc: Dave York<dyork@coastalconstructioncorp,com>, Kerry McCormack<kmccormaek@crosspointassociates.cam>,
Zachary Richards <zcchards@bohlereng.com>,Jay McSweeney<jmcsweeney@crosspointassociates,com>, Matt
Halvatzes <mhalvatzes@coastalconstructioncorp.com>, Duy-Quang Nguyen <dgnguyen@coastalconstructloncorp.com>,
M201047@nf.bohlereng.com <M201047@nf.bohlereng.com>, Josh Brandt<jbrandt@crosspointassociates,com>, Abdul
Muqeet<amugeet@bohlereng.com>
Jean,
Please find last month's SWPPP/construction monitor inspection logs attached for review and file. These reports
document the site visits-from the following biweekly visits(10120 and 11/4),
Lot me know with any questions following your review.
Thanks,
Jared Walsh
Sr. Design Engineer
o 617-849-8040
From: Jared Walsh
Sent: Friday, October 8, 2021 4:31 PM
To: Jean Enright<jenright@northandoverma,gov>
Cc: Dave York<dyork@eoastalconstructioncorp,com>; Kerry McCormack<kmocormack@crosspointassociates.com>;
Zachary Richards <zrichards@bohiereng.com>;Jay McSweeney<jmcsweeney@crosspointassociates.com>; Matt
Halvatzes <mhalvatzes@coastalconstructioncorp.com>; Duy-Quang Nguyen <dgnguyen@coastal con structloncorp.com>;
M201047@nf.bohlereng.com; Josh Brandt <jbrandt@crosspointassociates.com>
Subject: RE: Crosspoint North Andover- Monthly inspection Reports
Jean,
I
11/8/21,3:32 PM Town of North Andover Mal]-Fwd:Cfosspoint North Andover-Monthly Inspection Reports
Please find the month's SWPPP/construction monitor inspection logs attached for review and file-These reports
document the site visits from the following biweekly visits (9/22 and 10/7).
We also have included site visit reports from 9/10 and 9/24 made to check on the site following some increased
precipitation volumes.
I
Let me know with any questions.
i
Thanks,
Jared Walsh
Sr. Design Engineer
o 617-849-8040
From: Jared Walsh
Sent: Thursday, September 9, 2021 3:37 PM
To: Joan Enright <jenright@northandoverma.gov>
Cc: Dave York<dyork@coastalconstructioneorp,com>; Kerry McCormack<kmccormack@crosspoiritassociates,com>;
Zachary Richards<zr€chards@boh fore ng.com>;Jay McSweeney<jmcsweeney@crosspointassociates.com>; Matt
Halvatzes <mhalvatzes@coasta[con structioncorp.com>; Duy-Quang Nguyen <dgngu yen @coastalconstructioncorp.com>;
M201047@nf.bohlereng.com; Josh Brandt<jbrandt@crosspointassociates.com>
Subject: RE: Crosspoint North Andover-Monthly Inspection Reports
Jean,
Please find the month's SWPPP/construction monitor inspection logs attached for review and file.These reports
document the site visits from the following biweekly visits (8/25 and 9/8).
We also have included site visit reports from 8/20 and 9/3 made to inspect the site following all of the heavy precipitation
we have been getting as of late.We are also anticipating needing an additional site visit tomorrow after a potential large
storm event occurring overnight that will be included in the next round of reports.
Let me know with any questions on the attached.
Thanks,
Jared Walsh
Design Engineer
o 617-849-8040
From: Jared Walsh
Sent: Thursday, August 12, 2021 3:34 PM
https://mail.goog le.comlmall/u/0/?ik=a2debacbi a&view=pt&search=all&perrnthld-thread-f%3A 1705192022914218999%7Cmsg-f%3A1715892632330,.. 2/5
11l8l21,3:32 PM Town of North Andover Mail-Fwd:Crosspoint North Andover-Monthly Inspection Reports
To: Jean Enright <jenright@northandoverma.gov>
Cc: Dave York<dyork(§coastalconstructioncorp.com>; Kerry McCormack<kmccormack@crosspointassociates.com>;
Zachary Richards <zichards@bohlereng.com>; Jay McSweeney<jmcswee ney@crosspoin tas s oci ate s.co m>; Matt
Halvatzes <mhalvatzes@coastalconstructioncorp.com>; Duy-Quang Nguyen <dgnguyon@coastalconstructioncorp.com>;
M201047@nf.bohlereng.com; Josh Brandt<jbrandt@crosspointassociates.com>
Subject: RE: Crosspoint North Andover- Monthly Inspection Reports
Jean,
Please find the month's SWPPPIconstruction monitor Inspection logs attached for review and file. These reports j
document the site visits from the following biweekly visits (7127 and 8111).
i
9
We also have included a site visit report from last Thursday(815),which was made in order to inspect the site following
heavy precipitation.
Lot me know with any questions on the attached.
Thanks,
Jared
Jared Walsh
Design Engineer
o 617-849-8040
From: Jared Walsh
Sent: Tuesday, July 13, 2021 1:17 PM
To: Jean Enright<jenright@northandoverma.gov>
Cc: Rian Kearney<rkearney@coastalconstructioncorp.com>; Dave York<dyork@coastalconstructioncorp.com>; Kerry
McCormack<I<mccormack@crosspointassociates,com>; Zachary Richards <zrlchards@bohlereng.com>; Jay
McSweeney<jmcsweoney@crosspointassociates.com>; Matt Halvatzes <mhalvatzes@coastal construction corp.com>;
Stephen Martorano <smartorano@bohlereng.com>; Duy-Quang Nguyen <dgnguyen@coastalconstructioncorp.com>;
M201047@nf.bohlereng.com
Subject: RE: Crosspoint North Andover- Monthly Inspection Reports
Jean,
Please find the month's SWPPPIconstruction monitor inspection logs attached for review and file. These reports
document my site visits from our following visits (6115, 6129&7112).
Let me know with any questions you may have.
Thanks,
Jared
htips://rnail.google.com/m8il/u/O/?ik=a2debacbl a&view=pt&search=all&permth id=th read-f%3A1 7051 9202291 421 8999%7Cmsg-P/.3A1715892632330... 315
i
1118/21,3:32 PM Town of North Andover Mall-;=wd:Crosspolnt North Andover-Monthly Inspection Reports
Jared Walsh
Design Engineer
o 617-849-8040
From: Jared Walsh
Sent-, Thursday, June 3,2021 7:36 PM
To: Jean Enright <jenright@northandoverma.gov>
Cc: Rian Kearney<rkearney@coasta Icon struction corp.com>; Dave York<dyorl<@coastaiconstructioncorp.com>; Kerry
McCormack <kmccormack@crosspointassociates.com>; Zachary Richards<zrichards@bohlereng.com>; Jay
McSweeney<jmcsweeney@cl•osspointassociates.com>; Matt Halvatzes <mhalvatzos@coastalconstructioneorp.com>;
Stephen Martorano<smartorano@bohlereng.com>; Duy-Quang Nguyen <dgnguyen@coastalconstructioncorp.com>;
M201047@nf.bohiereng.com
Subject: CrosspoW North Andover- Monthly Inspection Reports(Month 1)
Jean,
Please find this month's inspection logs for the Site attached for your review. These reports document my site visits from
our pre-construction meeting (5/7)and the following bi-weekly visits (5/17&6/1).
Lot me know with any questions or if you would like to discuss anything further.
Thanks,
Jared
Jared Walsh
Design Engineer
45 Franklin Street, 5th Floor
Boston, MA 02110
o 617-849-80401 jwalsh@bohlereng.com
www.BohlerEngineering.com
Otwift 0 H L rEw Or 19
Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the
designated recipients, which information may also be privileged. if the reader of this e-mail is not the intended recipient, the
document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is
strictly prohibited, if you have received this e-mail in error,please notify the sender via reply e-mail and immediately delete this e-
mail from your system.
Sincerely,
Jean Enright
https://mail.google.comlmaillul0l7ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A17051920228f<4218999%7Cmsg-f%3A1715892632330... 415
IW/21,3:32 PM Town of North Andover Mail-Fwd:Crosspoint North Andover-Monthly Inspection Reports
Planning Director
Town of North Andover
120 Main Street
North Andover, MA 01845
Phone 978,688.9533
Fax 978.688.9542
Email: jenright@northandoverma.gov
Web: www.NorthAndoverMA.gov
L,cid:image001..jpg@010EOF52.F68A5980
2 attachments
2021-11-04 Crosspoint-NAndover lnspection.pdf
1930K
2021.10-20_Crosspoint-NAndover�Inspection.pdf
VJ 2687K
https:)/mall.google.corn/mail/u/01?lk=a2debacbl a&view=pt&search-all&permthid=thread-f°/`3A1705192022914218999%7Cmsq-f%3A1715892632330... 5/5
i
Site Inspection Report
General Information
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. I WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection November 4, 2021 Start/End Time 11:30-12:30PM
Inspector's Name(s) Abdul Muqeet i
Inspector's Title(s) Staff Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications
Describe present phase of Black top being poured and graded throughout site. Conduit connections to
construction building and interior HVAC and sprinkler work being done.
Type of Inspection:
21 Regular ❑ Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Start Date& Time: 5:00 PM (10/31) Storm Duration (hrs): 10.0 Approximate Amount of Precipitation (in):
1.54
Weather at time of this inspection?
® Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 520F
Have any discharges occurred since the last inspection? []Yes NNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe:
Site-specific 13MPs
BMP BMP BMP Corrective Action Needed and Notes
Installed? Maintenance
Re. aired?
1 Perimeter silt fence NYes ❑No ❑Yes NNo
2 Silt sacks NYes ❑No ❑Yes NNo
3 Compost filter tubes ❑x Yes ❑No ❑Yes NNo
4 Perimeter const, fence NYes ❑No ❑Yes ®No
5 Const. entrancoloxit NYes ❑No ❑Yes NNo
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes []No ❑Yes ❑No
8 ❑Yes ❑No ❑Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No ❑Yes []No
202i-4i-04_Crosspoint-NAndover Inspedlon.docx
i
Overall Site Issues
BMP/activity Implemented? Maintenance Corrective Action Needed and Notes
Required?
1 Are all slopes and ®Yes ❑No ❑Yes NNo
disturbed areas not
actively being worked
properlystabilized?
2 Are natural resource NYes ❑No ❑Yes NNo
areas (e,g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls NYes ❑No ❑Yes NNo
and sediment barriers "
adequately installed
(keyed into substrate)
and maintained?
i
4 Are discharge points NYes ❑No ❑Yes NNo !
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets ❑xYes ❑No ❑Yos NNo
properly protected?
6 Is the construction exit ®Yes ❑No ❑Yes NNo
preventing sediment
from being tracked
into the street?
7 Is trashllittor from ❑Yes NNo ®Yes ❑No Minor construction trash/litter scattered in portions
work areas collected of site. Contractor notified,
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater NYes ❑No ❑Yes NNo
discharges (e.g., wash
water, dewatering)
roperly controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-11-04 Crosspolnt-N Andover_Inspection.doex
Non-Compliance
Describe any incidents of non-compliance not described above:
I
i
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T.
Signature:
I
Date: 11/04/2021
2121-11-04 Crosspolnt-NAndover inspection.docx
�r .d� S�• i 1' 1
.p
5W, G
�` f'4
RR
r
r r y ; N M --- ,fit t/W,,•v - M�rf ' �
rf-
1
r
ray ry
or 4 * ° F
� , � L� r fT•rT 7 r � '-
,
�i
t
� r '•��I - �1 'If�l
VOW—
�} s. rk�, �} { .1 rs 1'S'c ;;:- '�•"r � + �re f �'��--+ s 1 ! ! �� �h h �,>~
�; ,
r.. ` ,�.� �yeF >s..ti1�i,•� ✓.�'s,�dti2`Pti} � 1r• -�Yt7z-� > s t5 �`y�•... �.>kk �
+ f ' '{� 13�t 1� �i �•jt 't t v_ C h h t>u � Fr qr�'i�'¢3� aY1SA��.'� -� �-- -
c
' yFLfiY� �4; ��Z`�iS?`'�`�l�.RtijrbJ?�t•�t4 �?sro'is+ti��"��y+fl�L,jiy� x� � rF �C�' y
rt�f �-�*��k��+jt•.���v ,���f� 1^�}1�7��3�`v v��•, '1'�tY 1�*.�,?k +..� �+�
siN4
10
;71.•,.1; �> �� �� l rt�!dy�.,�.�FQ,•�u ti � ��•,�atF '� 4 7 ti� '�+c � r
OR
.ter �,!y"..f�'i3�1 Y�;�,r� � .�. �+ i�jt 51 ✓-��3v � CaG� a� �e �� .y������ � �y { Sis r �.f"
S•�r �y S�f �a a 1+�' +�., , r y o s 3^i r - �;
,� rh + f,•4�+�a 1 � rf�}t q,y„ " •a
- O
��jA'�t°•"d, '
�£{'". Xry'`a``�r�xx�,��,,c R• 7 s.'� c� ����,s"'� v_ ��r„z, � �f � � fin* r°T � ��v. ��`C cam,���
in,
•' NM
2 +
»°" k .•si-c • k}, ` vt(?'ut+ t hA 1. i �' i *y ,t �.' � •;
'��
+��t,•rL pq[5 q s `� ,� k ��� °,y r�'s�v+nfSt t ,-t.
•1, �dk�!`f l�� 4 � �� � � ..,3�-b �r�Y F �1 j}i' '�� 7 i1 -�L�rkS ( P7S1� � aa� 1}S
� to +dY�-.4^ .L� 4� �r^�� �#+of ksYr -�,v .t .�k�u.�' wr(1 �S,t ro � M a�r�. �+ ,�a•,�;..
S�• �`ak +� r f�� gl�,�jt�'S_� J �x� �`x' '�>n�s+ '� �i[°��� ,�,a^`"V'ti�r� 1
i •5 h 5 �5 r e 7 v ,fF st�,S�:v .2�,1"� n c,.{�7�"' ��'S g . �, - r
!�r• ,,,�' `?,r;Ir:+ � °�,�� � e,(J r,kb ����,ens >">�� �t�,�3� ,< 3�� ��'�^�����
ell,
S
/
ref,
s
k �
r p
Site inspection Report
General Information
Project Name Crosspoint North Andover
NPDFS Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. /WWP No, NIA Permit February 15, 2022
-Expiration
Date of Inspection October 20, 2021 Start/End Time 9:30-10:30AM
Inspector's Name(s) Abdul Muqeet
Inspector's Title(s) Staff Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications
Describe present phase of Continued framing and interior work for Building A, Final grading and installation
construction of sewer and drainage structures on-site.
Type of Inspection:
N Regular ❑ Pre-storm event ❑ During storm event ❑ Post-storm event
Weather Information
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Start Date & Time: 5:00 PM (10/17) Storm Duration (hrs): 7.5 Approximate Amount of Precipitation (in):
0.44
Weather at time of this inspection?
N Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 52°F
Have any discharges occurred since the last inspection? []Yes NNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe.
Site-specific BMPs
BMP BMP BMP Corrective Action Needed and Notes
Installed? Maintenance
Required?
1 Perimeter slit fence NYes ❑No ❑Yes NNo
2 Silt sacks [A Yes ❑No []Yes N No
3 Compost filter tubes NYes ❑No ❑Yes NNo
4 Perimeter const. fence NYes ❑No []Yes NNo
5 Const. entrance/exit ®Yes ❑No []Yes NNo
6 ❑Yes [-]No ©Yes ❑No
7 ❑Yes ❑No ❑Yes ©No
8 ❑Yes ❑No []Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No ❑Yes ❑No
2021-10-20 Crosspoint-NAndover lnspection.docx
1
Overall Site Issues
BMPlactivity Implemented? Maintenance Corrective Action Needed and Notes
Re uired?
1 Are all slopes and NYos ❑No ❑Yes NNo
disturbed areas not
actively being worked
properlystabilized?
2 Are natural resource NYos ❑No ❑Yes NNo
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
H M Ps?
3 Are perimeter controls ©Yes ❑No ❑Yes NNo
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points pYes ❑No ❑Yes NNo
and receiving waters
free of any sediment
de osits?
5 Are storm drain inlets ❑xYes ❑No ❑Yes NNo
ProPerIV rotected?
6 Is the construction exit ❑Yes ®No ❑Yes NNo
preventing sediment
from being tracked
into the street?
7 Is trash/litter from Wes ❑No ❑Yes NNo
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yos ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®Yes ❑No ❑Yes NNo
discharges (e,g., wash
water, dewatering)
properly controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-10-20_Crosspolnt-NAndover—]nspection.docx
I
Non-Compliance
Describe any incidents of non-compliance not described above; E
i
I
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T.
Signature:
Date: 1 012 0/2 02 1
i
2021-10-20, Crosspoint-NAndover ]nspectlon,docx
45 Franklin Street, 5th Floor
Boston, MA 02110
160 m%W= H LL mm Kmftm617.849.8040
Photos Taken on October 20, 2021
.r'31Nk U .�
r
ffJfrj[eYl ; � �
-
ktrr 9r� �p9y r y;P'l ""•.
�f
Photo 1: Perimter controls installed behind retaining wail along western property line.
RAM
ii
i
M: c.
7
Photo 2. Foundation preparation for Chase Bank pad site.
www.BohlerEngineering.com
5
r
e 1 ly
.y_.
♦MOMORRIM • • • •
t
7sT4
y ^
-opt
r S4 � !��'� ' �I �S r 1 i �'T C d ✓s I
OW
r
s r
i
l
}o-
t5UHLER //
07:
Photo 5: Perforated pipe and structures installed along Route 114.
A
it
1
��.R ' - f� i: •..a .., � `. ',. -„
Photo 6: Final grading over underground detention system being conducted.
www.BohlerEnglneeri rig.coin
1
10/12/21,8:52 AM Town of North Andover Mail-1=wd:Crosspoint North Andover-Monthly Inspection Reports /
NORTV" ANi"OVER
massachus lis 3 Bonnie Wolstromer<bwolstromer@northandoverma.gov>
Fwd: Crosspoint North Andover - Monthly Inspection Reports
1 message
i
Jean Enright <jenright@northandoverma.gov> Tuo, Oct 12, 2021 at 8:00 AM
To: Bonnie Wolstromer<bwolstromer@northandoverma.gov>
For processing.
---------- Forwarded message---------
From:Jared Walsh <jwalsh@boh(ereng.com>
Date: Fri, Oct 8, 2021 at 4:30 PM
Subject: RE: Crosspoint North Andover-Monthly Inspection Reports
To: Jean Enright<jenright@northandoverma.gov>
Cc: Dave York<dyork@coastalconstructioncot-p.com>, Kerry McCormack<kmccarmack@crosspointassociates.com>,
Zachary Richards <zrichards@bohlereng.com>, Jay McSweeney<jmcsweeney@crosspointassociates.com>, Matt
Halvatzes <mhalvatzes@coastalconstructioncorp.com>, Duy-Quang Nguyen <dgnguyen@coastalconstructioncorp.com>,
M201047@nf,bohlereng.com <M201047@nf.bohlereng,com>, Josh Brandt<jb ran dt@crosspointassociates,com>
Jean,
Please find the month's SWPPP/construction monitor inspection logs attached for review and file. These reports
document the site visits from the following biweekly visits(9/22 and 10/7).
We also have included site visit reports from 9/10 and 9124 made to check on the site following some increased
precipitation volumes,
t_et me know with any questions.
Thanks,
i
Jared Walsh
Sr. Design Engineer
o 617-849-8040
From: Jared Walsh
Sent: Thursday, September 9, 2021 3:37 PM
To: Jean Enright <jenright@northandoverma.gov>
Cc: Dave York<dyork@coastalconstructioneorp.com>; Kerry McCormack<kmccormaclt@crosspointassociates.com>;
Zachary Richards <zrichards@bohlereng.com>; Jay McSweeney<jmcsweeney@crosspointassociates.com>; Matt
Halvatzes <mhalvatzes@coastalconstructioncorp.com>; Duy-Quang Nguyen <dgnguyen@coastalconstructioneorp.com>;
M201047@nf.bohlereng.com; Josh Brandt<j brand t@cross poi ntassociates.com>
Subject: RE: Crosspoint North Andover-Monthly Inspection Reports
https:llmai l.goog lo.comlmaillul0?lk=a2debacb 1 a&view=pt&search=al l&pormthid=thread-f%3A1705192022914218999%7Cmsg-f%3Al,713415161984... 114
10112/21,8:52 AM Town of North Andover Mail-Fwd:Crosspoint North Andover-Monthly Inspection Reports
Joan,
Please find the month's SWPPP/construction monitor inspection logs attached for review and file.These reports
document the site visits from the following biweekly visits (8/25 and 9/8).
We also have included site visit reports from 8120 and 9/3 made to inspect the site following all of the heavy precipitation
we have been getting as of late.We are also anticipating needing an additional site visit tomorrow after a potential large
storm event occurring overnight that will be included in the next round of reports.
Let me know with any questions on the attached.
Thanks,
Jared Walsh
Design Engineer
o 617-849-8040
From: Jared Walsh
Sent: Thursday, August 12, 2021 3:34 PM
To: Joan Enright<jenright@northandoverma.gov>
Cc: Dave York<dyork@coastalconstructioncorp.com>; Kerry McCormack <kmccormack@crosspointassociates.com>;
Zachary Richards <zrichards@bohlereng.com>; Jay McSweeney<jmcsweeney@crosspointassociates.com>; Matt
Halvatzes <mhalvatzos@coastalconstructioncorp.com>; Duy-Quang Nguyen <dgnguyen@coastalconstructioncorp.com>;
M201047@nf.bohlereng.com; Josh Brandt<j brandt@ crosspo 1 ntassociates.com>
Subject: RE: Crosspoint North Andover- Monthly Inspection Reports
Jean,
Please find the month's SWPPP/construction monitor inspection logs attached for review and file.These reports
document the site visits from the following biweekly visits (7/27 and 8/11).
We also have included a site visit report from last Thursday(8/5), which was made in order to inspect the site following
heavy precipitation.
Lot me know with any questions on the attached.
Thanks,
Jared
Jared Walsh
Design Engineer
o 617-849-8040
https:limall.gongle.com/mail/u/0?ik=a2debacb l a&view=pt&search Wall&permthid=th read-f%3AI705192022914218999°/a70msg-f`/`3Al7l 3415161984... 2/4
10112121,8:52 AM Town of North Andover Mall-Fwd:Crosspoint North Andover-Monthly Inspection Reports
I
From. Jared Walsh
Sent: Tuesday, July 13, 2021 1:17 PM
To: Jean Enright <jenright@northandoverma.gov> i
Cc: Rlan Kearney<rkearney@coastaleonstructioncorp.com>; Dave York<dyork@coastalconstructioncorp.com>; Kerry
McCormack <kmccormack@crosspointassociates.com>; Zachary Richards <zrichards@bohlereng.com>; Jay
McSweeney<jmcsweeney@crosspointassociates.com>; Matt Halvatzes<mhalvatzes@coastalconstructioncorp.com>;
Stephen Martorano<sma rto ran o@bohlereng.co m>; Duy-Quang Nguyen <dgnguyen@coastaIcon structioncorp.com>;
M201047@nf.bohlereng.com
i
Subject: RE: Crosspoint North Andover- Monthly inspection Reports 1
Jean,
Please find the month's SWPPPlconstruction monitor inspection logs attached for review and file.These reports
document my site visits from our following visits (6115, 6129 & 7/12).
i
Lot me know with any questions you may have.
Thanks,
Jared
Jared Walsh
Design Engineer
o 617-849-8040 '
i
From: Jared Walsh
Sent: Thursday, June 3, 2021 7:36 PM j
To: Jean Enright <jenright@northandoverma.gov>
Cc: Rian Kearney<rkearney@coastalconstructioncorp,com>; Dave York<dyork@coastalconstructioncorp.com>; Kerry
McCormack<kmccormack@cross poi ntassoci ate s.com>; Zachary Richards <zrichards@bohlereng.com>; Jay
McSweeney <jmcsweeney@crosspointassociates.com>; Matt Halvatzes <mhalvatzes@coastalconstructioncorp.com>;
Stephen Martorano <smartorano@bohlereng,com>; Duy-Quang Nguyen <dgnguyen@coastalconstructioncorp.com>;
M201047@nf.bohlereng.com
Subject: Crosspoint North Andover-Monthly Inspection Reports (Month 1) E
E
Jean,
Please find this month's inspection logs for the Site attached for your review. These reports document my site visits from
our pre-construction meeting (517)and the following bi-weekly visits (5f17 &6/1).
Let me know with any questions or if you would like to discuss anything further.
Thanks,
htips:llmail.googly.com/mall/u10?ik=a2debachi a&viow=pt&search=ail&perrnthld=thread-f%3Al 7O5l92022914218999%7Cmsg-E%3A1713415161984... 3A
10112i21,8:52 AM Town of North Andover Mail-Fwd:Crosspoint North Andover-Monthly Inspection Reports
Jared
Jared Walsh
Design Engineer
45 Franklin Street, 5th Floor
Boston, MA 02110
o 617-849-80401 jwalsh@bohlereng.com
www,BohlerEngineering.com
Confidentiality Note: This e-mail,and any attachment to it, contains confidential information intended only for the use of the
designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the
document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is
strictly prohibited. If you have received this e-mail in error,please notify the sender via reply e-mail and immediately delete this e-
mail from your system.
Sincerely,
Jean Enright
Planning Director
Town of forth Andover
120 Main Street
North Andover, MA 01845
Phone 978.688.9533
Fax 978.688.9542
Email: jenright@northandoverma.gov
Web: www.NoilhAndoverMA.gov
id:image0Ol.jpg@01CFOF52.F68A5980
4 attachments
2021-10-07—Crosspoint-NAndover_inspection.pdf
777K
2021-09-24 Crosspoint-NAndover Inspection.pdf
660K
2021-09-22_Crosspoint-NAndover—lnspection.pdf
1521 K
2021.09-1 O—Crosspoint-NAndover—lnspection.pdf
718K
https:/lmail.googio.comimailiu/0?ik=a2debaGbl a&view=pt&search=a[I&perrnthldmthread-f°/a3A1705192022014218999%7Cmsg-1%3Ai 7l 3415161984... 4/4
1
Site Inspection Report
General Information
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP Pile No. 1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection October 7, 2021 Start/End Time 3:00-3:30PM
inspector's Name(s) ,Jared Walsh
Inspector's Title(s) Sr. Design Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications E,I.T,
Describe present phase of Continued framing and interior work for Building A. Continued preparation and
construction installation of sewer and drainage structures on-site.
Type of Inspection:
M Regular ❑ Pre-storm event ® During storm event ❑ Post-storm event
Weather Information
Has there been a storm event since the last inspection? NYes ❑No
If yes, provide:
Storm Start Date &Time: 5:00 PM (1014) Storm Duration (hrs): 11 Approximate Amount of Precipitation (in): 0.97
Weather at time of this inspection?
N Clear ❑cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ Nigh Winds
❑ Other: Temperature: 720F
Have any discharges occurred since the last inspection? ❑Yes NNo
If yes, describe:
Are there any discharges at the time of inspection? []Yes NNo
If yes, describe:
Site-specific BMPs
BMP BMP BMP Corrective Action Needed and Notes
Installed? Maintenance
Required?
1 Perimeter silt fence NYes ❑No ❑Yes [ANo
2 Silt sacks NYes ❑No ❑Yes ®No
3 Compost filter tubes NYes ❑No ❑Yes NNo
4 Perimeter const. fence ®Yes ❑No ❑Yes ®No
5 Const. entrance/exit ®Yes ❑No ®Yes ❑No
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 []Yes []No ❑Yes []No
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes []No ❑Yes ❑No
2021-10-07—Crosspolnt-NAndover Inspection.docx
Overall Site Issues
BMPlactivity, Implemented? Maintenance ` `Corrective Action Needed'ar►d Notes
Re uired?
I Are all slopes and ®Yes ❑No ❑Yes NNo
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource Dyes ©No ❑Yes NNo
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls Wes ❑No ❑Yes ®No
and sediment barriers
adequately installer[
(keyed into substrate)
and maintained?
4 Are discharge points MYes ❑No ❑Yes NNo
and receiving waters
free of any sediment
do posits?
6 Are storm drain inlets MYes ❑No ❑Yes ®No
DronerIv orotected?
6 Is the construction exit ❑Yes NNo ®Yes ❑No Minor sediment tracking observed beyond the
preventing sediment construction entrance to Andover Street.
from being tracked _ Contractor notified (1 b18)
into the street?
7 Is trash/litter from ClxYes ❑No ❑Yes NNo
work areas collected
and placed in covered
dum stars?
8 Are washout facilities ❑Yes []No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete) available,
clearly marked, and
maintained?
9 Are vehicle and pYes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®Yes ❑No ❑Yes NNo
discharges (e.g., wash
water, dewatering)
ro erI controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval,
2021-10-07_Crosspoint-NAndover Inspection.docx
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Eased on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T.
Signature.
Date: 10/0812021
2021-10-07 Crosspolnt-NAndover Inspection.doox
45 Franklin Street, 5th Floor
BOHLER # Boston, MA 02110
617.849.8040
Photos Taken on Octo.ber7, 2021
F �yif r
a
_ � r
Photo 1: Perimter controls installed Behind retaining wall along western property line.
a'
NMI
s..
i
N !
Photo 2: Foundation preparation for Chase Bank pad.
www.Boh lorEngi i ieering.corn
I
i
I
N tJ
ME,
y,
BOHLER //
......
....
n
r
Photo 3: Framing for Building A continuing and concrete pouring for drive-thru has begun.
Fir
apt rf1' p. ri iS `4 box �4 .;9� a �S�i` ,' 'rC "
1 " �f� '�_� �9�` n� ���
�, a F s
�k"fit � 19
Y
Photo 4: Minor sedimenting tracking beyond construction entrance. Contractor notified.
wwwBohlerEngineering,com
• r
t
�V
i
3
T
,f
(tom , G Y j 5'L ✓ "�t I `�� rN"�' _
mom Aft
k5UHLE-R //
..............
A-1
Photo 5: 'Transformer pad and bollard protection installed.
w
�s
�M
Photo 6: Installation of impervious curb for emergency spillway.
www.BohlerE.ngineering.com
V/
Site Inspection Report
General information
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No.I WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection September 24, 2021 Start/End Time 10:15-10:45 AM
Inspector's Name(s) Anne Lamonte
1
Inspector's Title(s) Design Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Continued construction of framing for proposed building and conduit
construction connections to building. Continued preparation and installation of sewer and
drainage structures on-site.
Type of Inspection:
N Regular ❑ Pre-storm event N During storm event ❑ Post-storm event
Weather Information
Has there been a storm event since the last inspection? RYes ❑No
If yes, provide:
Storm Start Date &Time: 3:00 AM PM (9124) Storm Duration (hrs): 14 Approximate Amount of Precipitation (in):
0.51
Weather at time of this inspection?
© Clear ®Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 75°F
Have any discharges occurred since the last inspection? ❑Yes ONo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe:
Site-specific BMPs
BMP. ' BMP: BMP Corrective Action Needed ani'.Notes
Installed? Maintenance
Required?
1 Perimeter slit fence NYes ❑No ❑Yes NNo
2 Silt sacks NYes ❑No ❑Yes NNo
3 Compost filter tubes pYes ❑No ❑Yes ONo
4 Perimeter coast. fence NYes ❑No ❑Yes NNo
5 Const, entrancelexit NYes ❑No ❑Yes NNo
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 ❑Yes ❑No ❑Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No []Yes ❑No
2021-09-24 Crosspoi nt-NAnd over Inspection.docx
Overall Site Issues
BMPlactivity Imolemented?. Maintehan6dl torre'cdive'Action Needed and Notes'
R. e uired7
1 Are all slopes and ®Yes ❑No ❑Yes ❑x No
disturbed areas not
actively being worked
properlystabilized?
2 Are natural resource ❑xYes ❑No ❑Yes MNo
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls pYes []No ❑Yes ©No
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points pYes ❑No ❑Yes MNo
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets pYes ❑No ❑Yes ®No
properly rotected?
6 Is the construction exit ❑Yes ®No ❑Yes ®No
preventing sediment
from being tracked
into the street?
7 Is trash/litter from pYes ❑No ❑Yes NNo
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater MYes ❑No ❑Yes ®No
discharges (e.g., wash
water, dewatering)
properlycontrolled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule-or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-09-24 Crosspoint-NAndover, inspection.docx
i
Non-Compliance
Describe any incidents of non-compliance not described above:
1
i
CERTIFICATION STATEMENT
"l certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T.
Signature:
Date: 9/24/2021
2021-99-24_Crosspoint-NAndover, lnspection,docx
45 Franklin Street, 5th Floor
O
Boston, MA 02110%OFHLER // 6W.849.8040
Photos Taken on September 24, 2021
It
i� _�• �!� � ; k: � �'' ire �**u�'�5"� r ;
f� r✓� �' " Y 1
Photo 1; No puddling observed behind retaining wall along western property line.
JU
so
�S
1k'
Photo 2: Area being prepared for installation of chamber system on site. No puddling observed.
www.BohlerEngineering.com
F
Ir � I) I Y � �'✓
�� r
E� I
I
BOHLER #
. .. ......... ...... ....
. ... ..... . ..
.. .................
..................................
. ..............
..........
.............
MA
Photo 3; Framing for Building A underway.
i ,
y I_
i
Photo 4: Drainage structures installed on site.
www3ahlerEngineering.com
�1 A
r-•.
•n�
I pay
STAM
Ti
-rvl, y y`�i `fit w n
xr 'r ✓ r� f r a -
.�i x� � wr�� k� s�5��� c a $x F r'`✓a�;�� :�� �x j � �� *ak h`� e��
eGr...1�a tik. s;°mr� a
V/111/
Site Ins ection Report
General Information
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. /WWP No. NIA Permit February 15, 2022
Expiration'
Date of Inspection September 22, 2021 Start/End Time 9:00-10:00 AM
Inspector's Name(s) Abdul Muqeet
Inspector's Title(s) Staff Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications
Describe present phase of Erection of framing for proposed building and conduit connections to building
construction taking place on-site. Continued preparation and installation of drainage
structures on-site.
Type of Inspection:
© Regular ❑ Pre-storm event ❑ During storm event 0 Post-storm event
Weather Information
Has there been a storm event since the last inspection? ®Yes El No
If yes, provide:
Storm Start Date &Time: 11:00 PM — 12:00 AM (9/18) Storm Duration (hrs): 1 Approximate Amount of
Precipitation (in): 0.01
Weather at time of this inspection?
N Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 71°F
Have any discharges occurred since the last inspection? ❑Yes ONo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe:
Site-specific BMPs
BMR BMP BMP Corrective Action Needed and Notes
Installed? Maintenance
Required?
1 Perimeter silt fence DYes ❑No ❑Yes 0 No
2 Silt sacks DYes ❑No ❑Yes NNo
3 Compost fitter tubes DYes ❑No ❑Yes NNo
4 Perimeter const, fence ®Yes ❑No ❑Yes NNo
5 Const. entrance/exit NYes ❑No ❑Yes NNo
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 ❑Yes ❑No ❑Yes ❑No
9 ❑Yes ❑No ❑Yes ONo
10 ❑Yes []No ❑Yes ❑No
2021-09-22_Crosspoint-NAndover Inspection.docx
Overall Site Issues
BMPlactivity Implemented? Maintenance Corrective-Action Needed and Notes' .
Re wired?
1 Are all slopes and ®Yes ❑No ❑Yes MNo
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource pYes ©No ❑Yes [A No
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls pYes ❑No ❑Yes ©No
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points RYes ❑No ❑Yes MNo
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets pYes ❑No ❑Yes ®No
properly rotected?
6 Is the construction exit ❑Yos ®No ❑Yes ®No
preventing sediment
from being tracked
into the street?
7 Is trash/litter from pYes ❑No ❑Yes ©No
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete) available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater NYes ❑No ❑Yes IN No
discharges (e.g., wash
water, dewatering)
properly controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time.Any and all changes will be forwarded
sequence? for Planning Approval.
2021-09-22_Crosspoint-NAndover inspection.doox
1
i
I
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T.
Signature: pma-
Date: 9/22/2021
2021-09-22_Crosspolnt-NAndover, Inspection.docx
f
t
S � f
s> 3ffi!@A�1�aS:i
,r
�tr7 r 4 m )i i
k t
F A \t
S
!c�
n s 77.
PA,,
r ..,
� �� .: `. "2' �Y A d it•.{.ot��*_.tt �-�'''.
�>..A-� �i FZ�.�ai`-' Z•3 d FM
.,
_LMl. ;r a :�(���[{y�y�fir.+r�'r:E ;, i :`• �� ri"" rtj_''y� }.\-t2a�.++
°�f �d _,_ �.4,k,Y i C''r r(-�,-'F' ti �J. r {. -.S� _ �� {�w 4#�xt�- �•i:
Elk H L E R
3 � ,
"n '
..............
Photo 3: Framing for Building A underway.
1
r h � i i..Y�-� S `ems)S _- ! h :tom -.a _-jai-5; •.c4i�: +, n�"�F.
1
-7
4
!
jil
G'
Photo 4: Drainage structures installed on site.
www.BohlerEngineering.com
L E RtA 11
M. -
_
L; Ell'
\ . ® .
IT,
PhooE Earthwork, exc |o% a dstockpiling continuing across ores| et .
www.mhlm mdm.com
t/
Site Inspection Report
General Information
Project Name Crosspoint North Andover
NPDI_S Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DPP Fite No. 1 WWP No. N/A Permit February 15, 2022
Expiration
Date of Inspection September 10, 2021 Start/End Time 2:30-3:00 PM
Inspector's Name(s) Anne Lamonte
Inspector's Title(s) Design Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Excavation and grading operations and secondary retaining wall construction
construction taking place on-site. Continued preparation and installation of drainage
structures on-site.
Type of Inspection.
0 Regular ❑ Pre-storm event ❑ During storm event 0 Post-storm event
Weather Information
Has there been a storm event since the last inspection? NYes ONO
If yes, provide:
Storm Start Date&Time: 1:00 AM PM (919)Storm Duration (hrs): 24 Approximate Amount of Precipitation (in):
1.94
Weather at time of this inspection?
N Clear ©Cloudy ❑ Rain ❑ Sleot ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 73OF
Have any discharges occurred since the last inspection? Dyes ONO
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes ONO
If yes, describe:
Site-specific BMPs
BMP BMP BMP Corrective Action Needed and Notes
Installed? Maintenance
Required?
1 Perimeter silt fence NYes []No []Yes NNo
2 Silt sacks oYes ONO Dyes DNo
3 Compost filter tubes pYes ONO ❑Yes ONO
4 Perimeter const. fence NYes []No ❑Yes ®No
5 Const. entrance/exit MYos ONO ❑Yes ®No
6 ❑Yes ONO Dyes ❑No
7 ❑Yes ❑No Dyes ❑No
8 Dyes ONO ❑Yes ONO
Dyes ONO ❑Yes []No
1 .10 byes ❑No ❑Yes ❑No
2021-09-10_Crosspoint-NAndover rnspection.dom
Overall Site Issues
BMPlactiv'ity lrnplemented? Maintenance `Gorredtive Action Needed and Notes
Re vl ed? i
1 Are all slopes and ®Yes ❑No ❑Yes ONO
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource ❑xYes ❑No ❑Yes NNo
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls Wes ❑No ❑Yes MNo
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points NYes ❑No ❑Yes ONO
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets NYes ❑No ❑Yes NNo
properIv Protected?
6 Is the construction exit ❑Yes NNo []Yes NNo
preventing sediment
from being tracked
into the street?
7 Is trash/litter from MYes ❑No ❑Yes ONO
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ONO None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes []No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®Yes ❑No ❑Yes NNo
discharges (e.g., wash
water, dewatering)
ro erl controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-09-10—Grosspoint-NAndover inspection.docx
i
I
I
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
i
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete, I am aware that there are significant
penalties for submitting false information, including the possibility of fine and Imprisonment for Knowing
violations."
Print name:and title: Jared Walsh, I .I.T.
Signature:
,?lot
Date: 9/812021
2021-09-10_Crosspoint-NAndover inspeetion.doex
� • • 1 44.. •' of �
ky: V v
1 1 t-�ji.
t
r1
1
�.IK
3
. . .
ji TV
�} E
3 i L
�
No
All
{
c'"r nu�l�s
r n as
f � +
�G f<1t ,'f Tin x'l# C' f61
¢coati ��'
� �!' .--�?�If .a;�� L ,2�;f��k��i.,<,?f,,::�+4..�X�, '.t�k'r<r!'z.�-,.e"-r��s .���r�iS,.Ji :��• °#i {!'�4 :�`�t�ut�s
sY.
h,
a
5 �
s .
2"
BE al A Nub' umm L m Em R
77
Memo
y V
Photo 3: Stabilization of Building A underway.
v'
o _
a
Photo 4: Drainage structures installed on site.
www.BohlerEngineering.com
r rzl '
r
Z:4'Fr
'i rc p
4
ti
SS btM rp A i i � tCt" S y
�'.�a a a14� ... -
--
In
r +
17,
c:
r 4
� r A
V it
Site Inspection Report
General Information
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No,1 WWP No. N/A Permit February 15, 2022
Expiration
Date of Inspection August 20, 2021 Start/End Time 12:00-12:30 PM
Inspector's Name(s) Anne Lamonte
Inspector's Title(s) Staff Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Foundation construction taking place for Building A. Retaining wall installation
construction and backfill along western property line on-going.
Type of Inspection:
0 Regular ❑ Pre-storm event ❑ During storm event N Post-storm event
Weather Information
Has there been a storm event since the last inspection? Was ❑No
If yes, provide:
Storm Start Date &Time: 8:30 AM (8119) Storm Duration (hrs): 25 Approximate Amount of Precipitation (in): 1.3
Weather at time of this inspection?
❑ Clear ®Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
© Other: Misting rain Temperature: 82eF
Have any discharges occurred since the last inspection? [-]Yes ❑x No
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe:
Site-specific BMPs
BMP amp BMP Corrective Action Needed and Notes
Installed? Maintenance
Required?
1 Perimeter silt fence DYes ❑No ❑Yes NNo See note
2 Silt sacks x❑Yes ❑No ❑Yes ®No
3 Compost filter tubes NYes ❑No ❑Yes NNo
4 Perimeter coast. fence ®Yes []No ❑Yes ®No
5 Const. entrance/exit []Yes NNo ❑Yes ®No
6 ❑Yes ❑No DYes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 ❑Yes ❑No ❑Yes []No
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes ©No ❑Yes ❑No
2021-08-20�Crosspoint-NAndover Inspection.doax
Overall Site Issues
BMPlactivity Implemented? 'Maintenance ;Corrective Action Needed and'Notes
Required?; ,,
1 Are all slopes and NYes ❑No ❑Yes ❑xNo
disturbed areas not
actively being worked
properlystabilized?
2 Are natural resource pYes ❑No ❑Yes ONo
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls pYes ❑No ❑Yes X❑No As discussed in field, perimeter controls adjacent to
and sediment barriers the western retaining wall to remain in-place
adequately installed following completion of wall installation throughout
(keyed into substrate) construction.
and maintained?
4 Are discharge points pYes ❑No ❑Yes Me
and receiving waters
free of any sediment
deposits? -
5 Are storm drain inlets pYes ❑No ❑Yes Me
ro erl rotected?
6 Is the construction exit ❑Yes NNo ❑Yes ®No
preventing sediment
from being tracked
into the street?
7 Is trashflitter from pYes ❑No ❑Yes Me
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yos ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®Yes ❑No ❑Yes ®No
discharges (e.g.,wash
water, dewatering)
Droperiv controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time.Any and all changes will be forwarded
sequence? for Planning Approval.
2021-08-20 Grosspoint-NAndover Inspection.docx
Non-Com llance
Describe any incidents of non-compliance not described above:
i
i
CERTIFICATION STATEMENT
1 certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: ,fared Walsh, E.I.T. (Design Engineer)
Signature: Pill"(
,
Date: 8/20/2021
I
2021-08-20 Crosspolnt-NAndover_Enspection,docx
-mi, 1
-4g
r.
s '
�Ot,
3� m
VTII-
Te �.
k r+v
zz
S �
E 4 s A
r
q
e
G
L
e
J b
� L
rr
x r
45,
F,N-
t t
F�l - Mel
.e.f�f1 yll�4,t{,Z' +r
F'�qY(
E
i s..• * f
q �
H r V
n "� ,• ,,,��f '�1 � 's '��'�✓�{���'�����>&{��d�r,=� `� � �' �ra��r-� '�� "ref'.
,ors,
�.��i sTi R ��1aH x 1
��
1 k r j7 :,-
�� �f r"'tY"?.r c� L .� "�'��d��`�s+�'"c°� k���•u} �, ki-�
Y� '� 'Fi' "tc4 �V � Yf ti '�xy�9 Yr1'�y
3*FT
� '9'w
-:i
`yl
-mUtss f s
fF�qF, 1 M
t
w
Y 3 - }
qk� x
} MI. M���'y��iSxi�x�„ r.
x '..a♦ 1 'i,'r 4.7r a.�a��1�ir41r �?�F3��`?7�',�Ir°iS�� f5";''Y��,( ZL{��"�
kg
i
J S f
? 7'
S."r,F�.vSe S L 4 AI.
NO
3.. <v
t v �
h
✓ 1
Site Inspection Report
General Information
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. f WWP No, N/A Permit February 16, 2022
Expiration
Date of Inspection August 25, 2021 Start/End Time 8:00-8:45AM
Inspector's Name(s) Jared Walsh; Abdul Muqeet
Inspector's Titie(s) Staff Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Foundation construction continuing to take place for Building A. Excavation and
construction grading operations and secondary retaining wall excavation preparation taking
place on-site.
Type of Inspection:
0 Regular ❑ Pre-storm event ❑ During storm event © Post-storm event
Weather Information
Has there been a storm event since the last Inspection? ®Yes [-]No
If yes, provide:
Storm Start Date &Time: 6:00 PM (8/24) Storm Duration (hrs): 8 Approximate Amount of Precipitation (in): 1.69
Weather at time of this inspection?
N Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 84°F
Have any discharges occurred since the last inspection? ❑Yes NNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes 1ANo
If yes, describe:
Site-s ecific BMPs
BMP BMP BMP Corrective Action Needed and Notes
Installed? Maintenance
Required?
1 Perimeter silt fence MYes' ❑No ❑Yes ❑x No
2 Silt sacks MYes ❑No ❑Yes NNo
3 Compost filter tubes ElYes ❑No ❑Yes NNa
4 Perimeter const. fence ®Yes ❑No ❑Yes NNo
5 Const. entrance/exit ®Yes ❑No ❑Yes NNo
6 ❑Yes []No []Yes []No
7 ❑Yes ❑No ❑Yes []No
8 ❑Yes ❑No ❑Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
10 []Yes ❑% [--]Yes ❑No
2021-08-20_Cross point-N An dover—i n spectio n.docx
Overall Site Issues
BMPlactivity Implemented? Maintenance Corrective Action Needed and Notes
Required?!,
1 Are all slopes and ®Yes ❑No ❑Yos MNo
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource DYes ❑No ❑Yes NNo
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls Wes ❑No ❑Yes MNo
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points DYes ©No DYes MNo
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets DYes DNo ❑Yes NNo
properly rotected?
6 Is the construction exit ❑Yes ®No DYes MNo
preventing sediment
from being tracked
into the street?
7 Is trash/litter from MYes ❑No CIYes MNo
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No DYes ❑No None observed
(e.g., paint, stucco,
concrete) available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yos DNo DYes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®yes ©No ❑Yes MNo
discharges (e.g., wash
water, dewatering)
Properlv controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-08-20_Crosspoint-NAndover Inspection,dQcx
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
1 certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted, Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations,"
Print name and title: Jared Walsh, E.I.T.
Signature:
Date: 8/25/2021
2021-08-20_Crosspoint-NAndover, Inspection.docx
�`. �. • •� y ••�
L I
c -tir�I
xn M,
I' N
F �x kti ary st
Y r W t f �, k( Alt'r
F 1 - k ip
ji1
IV
P'
lz
77,
1 � � ,:e �.-a�a�2"- ara ..r� ��x�� ''sk,��.'v �'" �` ym�.+Pt.(n•rt ^ccswa'7, ���'F,x.: "�?P,
t ,
r f
IA
s II
IJrlrl, ,iSI
or
f 1� ' ►•
Zil
Aht r�r , ♦ � ��,, '�
,� /..i � ��r7r� /��1 �rjrl{�' li I : �C r�3'r� qJ♦ \ � � 'j✓ '
"w37 .
F7=p w "y
504
�. y `r `i �* R���:• S
�il�lY yj..l� +�fia''*9 lisS> ` 1r
I 4
/
•� r
IA
S
�t
I
`�V ezwa i
tTr PI
�1416
fi
vw
�� •7 �`�B �s{���''�ax ivy A P �* � w��� '¢', v
hr 1f
I MW
{�p�r
-
b
I
Site Inspection Report
General.Information
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N.Andover, MA
DEP File No. 1 WWP No. N/A Permit February 15, 2022
Expiration
Date of Inspection September 3, 2021 Start/End Time 10:15-11:00 AM
Inspector's Name(s) Anne Lamonte
Inspector's Title(s) Staff Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Foundation construction continuing to take place for Building A. Excavation and
construction grading operations and secondary retaining wail construction taking place on-
site. Continued installation of drainage structures on-site.
Type of Inspection:
❑xY Regular ❑ Pre-storm event ❑ During storm event N Post storm event
Weather Information
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Start Date &Time: 6:00 PM (911) Storm Duration (hrs): 13 Approximate Amount of Precipitation (in): 2.44
Weather at time of this Inspection?
N Clear El Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 680F
Have any discharges occurred since the last inspection? ❑Yes NNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe:
Site-specific BMPs
BMP BMP BMP Corrective Action Needed and Notes
Installed? Maintenance
Re ulred?
1 Perimeter silt fence NYes ❑No ❑Yes NNo
2 Silt sacks ©Yes []No ❑Yes NNo
3 Compost filter tubes NYes ❑No ❑Yes NNo
4 Perimeter const. fence ®Yes ❑No ❑Yes ®No
5 Const. entrance/exit NYes ❑No ❑Yes NNo
6 []Yes ❑No ❑Yes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 ❑Yes ❑No ❑Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No ❑Yes ❑No
2021-08-25_Omsspoint-NAndover Inspection.docx
Overall Site Issues
BMP/activity Implemented? Maintenance' Corrective Action Needed and Notes.
Required?:
1 Are all slopes and ®Yes ❑No ❑Yes NNo
disturbed areas not
actively being worked
properIV stabilized?
2 Are natural resource pYes ❑No []Yes MNo
areas (e,g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls pYes ❑No ❑Yes NNo
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points pYes ❑No ❑Yes NNo
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets NYes ❑No ❑Yes ®No
properly rotected?
6 Is the construction exit ❑Yes ®No ❑Yes NNo
preventing sediment
from being tracked
into the street?
7 is trash/fitter from xMYes ❑No ❑Yes ©No
work areas collected
and placed in covered
dum sters?
8 Are washout facilities []Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes []No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®Yes ❑No ❑Yes ®No
discharges (e.g.,wash
water, dewatering)
properly controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time.Any and all changes will be forwarded
sequence? for Planning Approval.
2021-0B-25 Crosspoint-NAndover Inspection.doox
Non-Compliance
Describe any incidents of non-compliance not described above:
i
1
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the Information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T.
Signature:
Date: 9I312021
2021-08-25_Crosspoint-NAndover Inspection.docx
45 Franklin Street, 5th Floor
LLI V // Boston, MA 02110
817.849.8040
Photos Taken on September 3, 2021
r
y
a"
1 I
k
ti
� r E
S ' ;
Y
.•f i l 3 .{1' 1. t l �t
Photo 1: Construction entrance remains installed to control vehicle sediment tracking,
Photo 2: Active Building A foundation construction.
www.BohlerEnginoering.com
' � I
s o
0 H L E R I
MEW.
` � F� 1 � to-- .f ✓+•.� r , f' ��" I
ry�r ' ,d.
., �•fa �a, H P� ^ '"^fir � Y�r fit;` '
Photo 3: Puddling observed behind retaining wall along western property line contained by perimter controls.
r Y;
+.
y
e r � .
.w
Photo 4; Construction of secondary retaining wall underway on-site.
www.BohlerEngineo ing.com
4
ILL
gi
fl r V 0 Ci'I I,
owr
�3
+ }� � L,r '•,s F � .a a'Ifs r.�:;� ,:, 3'¢-T� 7 y!r -1 ,�.��a
r 'S
4�� s � � rPt�TVy v�il�:��y+; P �`vr' k•�,fq�,p�,�-Mt J WFM.I � k � r�� �� �r 4. i �Y 9
Y�� " .F`S �h�l�'f``Sr _:If°Y r_, � < afi�' !�'�'��"j3-,�•,�. i{�h k�j - n''�Ts��{i�� �r
?"�+l'�r ��, �. ,�����,�'ta !tom 1r• -I� �, r ,� �J �..t
i y '
nS Yr
4 t �✓'{rr �� � F 4�� �' -r� 3 e-� 6. �, 4.���1;'iT; � s 'T��.
x f
1
.rY 1
Site Ins ection Report
General Information
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. 1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection September 8, 2021 Start/End Time 8:30-9.00 AM
Inspector's Name(s) Abdul Muqeet
Inspector's Title(s) Staff Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications
Describe present phase of Excavation and grading operations and secondary retaining wall construction
construction taking place on-site. Continued preparation and installation of drainage
structures on-site.
Type of Inspection:
N Regular ❑ Pre-storm event ❑ During storm event 0 Post-storm event
Weather information
Has there been a storm event since the last inspection? NYes ❑No
If yes, provide:
Storm Start Date &Time: 11:00 PM (915) Storm Duration (hrs): 3 Approximate Amount of Precipitation (in): 0.05
Weather at time of this inspection?
® Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 750F
Have any discharges occurred since the last inspection? ❑Yes ❑x No
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes oNo
If yes, describe:
Site-specific BMPs
BMP BMP BMP Corrective Action Needed arid.Notes .
Installed? Maintenance
Required?
1 Perimeter silt fence NYes ❑No []Yes ONo
2 Silt sacks ❑xYes ❑No ❑Yes NNo
3 Compost filter tubes [@Yes ❑No []Yes ❑x No
4 Perimeter const. fence ®Yes ❑No ❑Yes NNo
5 Const. entrancelexit NYes ❑No ❑Yes ®No
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes ❑No []Yes ❑No
r9lo
❑Yes ❑No ❑Yes ❑No
❑Yes ❑No ❑Yes []No❑Yes ❑No ❑Yes El No
2021-09-0a_Cross poi nt-NAndover_f nspection.dou
Overall Site Issues
BMP/activity Implemented? `Maintenance` Carrective Action Needed and (Votes
Required?
1 Are all slopes and ®Yes ❑No ❑Yes NNo
disturbed areas not
actively being worked
ro erl stabilized?
2 Are natural resource ❑xYes ❑No ❑Yes ONO
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls ❑xYes ❑No ❑Yes ENO
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points NYes ❑No ❑Yes MNo
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets NYes ❑No ❑Yes NNo
properIV Drotected?
6 Is the construction exit ❑Yes ENO ❑Yes ONO
preventing sediment
from being tracked
into the street?
7 Is trashllitter from ©Yes ❑No ❑Yes ONO
work areas collected
and placed in covered
dum sters?
S Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑Na ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®Yes ❑No ❑Yes ONO
discharges (e.g., wash
water, dewatering)
ro erl controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time.Any and all changes will be forwarded
sequence? for Planning Approval.
2029-09-08—Crosspoint-NAndover inspectlon.docx
i
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T.
Signature; +
Date: 9/8/2021
2021-09.08 Crosspoint-NAndover_fnspectlon.dou
A
r
s� P fie,—c1-�-3 i•: p� 1
o-
� ��i
f1.rMA�1�E��
I71 11 j J�+, i Ji1�l1f r z
} 1 ,
•,I��fY}]��j�� Yp � �i� 4 r��s� fi,�-
L Kaa ,
1 1
w<� IDY w45,
x �
� rLc i
��
��5 :�..• � k� ,�a}?.. '`� �� rct- �..r s�� '1t`ieC}�,.Xir�'� �$��� q � ,�y�-:;
t4x
`�sg 4. ,
� �`'r
4 ,�i4 nr iTt ��77 rat
i
9 S z M
t
BOHLER #
... .......
..........
,}-Y•_ < �
...........
� (( i
gyrJ w
"Nz try
�S
-i
t
&'(fL W.S�`'(' "'ma. �ic'.>zt-..N��'. •� � "'�m_,; .�Slm'Lti�
Photo 3; Preparation for one of the chamber systems to be installed on-site underway.
A
Photo 4: Construction of secondary retaining wall underway on-site,
www,BohlerEnglneoring.com
+
S �
iF—'."W3
.L ', ,S�t1y'aN�21r
tC
1 M,R ,l4 Wi
�
��y,
!�!`7 rf Ns�r¢ � Per/�fy�i'1•.�S fYYR�ri' (� ����� !� ��.
ia It oil
V 'II
Site Report
Inspection a
p R p ..
36
General'Infarmafta�i
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No.1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection August 11, 2021 Start/End Time 12:00-12:45 PM
Inspector's Name(s) .fared Walsh
Inspector's Title(s) Design Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Foundation preparation taking place for Building A. Retaining wall installation
construction and backfill along western property line on-going.
Type of Inspection:
0 Regular ❑ Pre-storm event ❑ During storm event M Post-storm event
Weather lnfarmation
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Start Date &Time: 1:OOAM (8110) Storm Duration (hrs): 3 Approximate Amount of Precipitation (in): 0.04
Weather at time of this inspection?
® Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 90OF
Have any discharges occurred since the last inspection? ❑Yes x❑No
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes x❑No
If yes, describe:
Site-s ecific BMPs
�IV#P� BMP BMP, � Ga�rrecttr�e Action Needed and Notes r
lnstallled7 Ma9ntenahce ✓
Re firer ?�
i
1 Perimeter silt fence 19Yes ❑No ❑Yes 19No See note
2 Silt sacks ©Yes ❑No El Yes NNo
3 Compost filter tubes Ayes ❑No ❑Yes L No
4 Perimeter const, fence ®Yes ❑No ❑Yes ©No
5 Const. entrancolexit ❑Yes ©No ❑Yes NNo
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes []No Dyes []No
8 ❑Yes ❑No ❑Yes ❑No
9 []Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No ❑Yes ❑No
2021-08-12_Crosspoint-NAndover_I nspectl on.docx
Overall Site Issues
B[V�Pla�tivi�y frnpl®mented� MainlGer� nce e Correa���e Ac>liatt Needed ancil3Notes 4
Re ui<r7
1 Are all slopes and ©Yes ❑No ❑Yes x❑No
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource pYes ❑Na ❑Yes I]No
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BM Ps?
3 Are perimeter controls pYes ❑No ❑Yes ONo As discussed in field, perimeter controls adjacent to
and sediment barriers the western retaining wall to remain in-place
adequately installed following completion of wall installation throughout
(keyed into substrate) construction.
and maintained?
4 Are discharge points ❑x Yes ❑No ❑Yes ❑x No
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets pYes ❑No ❑Yes ®Ne
Properiv Protected?
6 Is the construction exit ❑Yes ®No ❑Yes ®No
preventing sediment
from being tracked
into the street?
7 Is trash/litter from pYes ❑No ❑Yes Me
work areas collected
and placed in covered
du m stets?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®Yes ❑No ❑Yes ®No
discharges (e.g., wash
water, dewatering)
properly controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-08-12_Crosspoint-NAndover 3nspection.doex
Non-Compliance
Describe any incidents of non-compliance not described above;
I
i
i
CERTIFICATION STATEMENT
i
"I certify under penalty of law that this document and all attachments were prepared under my direction or I
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title. Jared Walsh, E.I.T. (Design Engineer)
Signature: ,Ta4,-e&1/UaU1v
Date: 8/12/2021
2021-08-12_C ros spot nt-NAndover_I nspectl on.d ocx
s i•• it+ l
F a
- ��j✓� r r�. fro 5 r,��' yr y ✓ �,� SrL t�
LEMON
..............
a
- , +r �;- ✓ s !'9a f .yTpVQ
r arc rM i�'"7ei
- ung
1=� S 1pa.. I 1 It 't
S
`'�-'"3 ++ r^n's€
:g,�' arji"Y eL 'i Y t 1t k7� t�F 5>r�t+4 St L' ��tr� will
f'>.t
S.ti+r
. 4r axa err >J '� '�_ -' t►hw �:� - '''�'t x:a�ga
}
L �
f
-
� J
��� �� � dry #���r�� 7 �✓ay ��� � � � � €'�
r � €
'AMPN
�¢�.`y�r`T '.�'�72-�'if ��`� r t "�ca iG= �s s �a��r2S•"�"{ a'4"�,�L�.n" i ''fir •2, ��. \ 4
!`s ♦'f K er r i.s t�.e6ye # X >al'k�i+fiiy r '�
�t
r
t 3
y ft r"
i
.S
J
as
All
zi
imp
T
ate
� I
Ail
i
c'-_ nt sir✓ �
MY r >
&A op1 rr
r-
- ':� ; �k v '� ✓ .,, �' ,� �r't�,���sMl.'b r,.°E�' 'v�e r� a t�uf � q
a
=� Via_
r
NOj � 1
E� y t 7 ( y,
,fSIAN
zg
ti k
Zr
' ?,� '
3
i• • F •
V
Site Inspection Report
t ' �� �� General It>Efarma�ian f
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No.1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection August 5, 2021 Start/End Time 3:15-3:45PM
Inspector's Name(s) Anne Lamonte
Inspector's Title(s) Staff Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Earth work and subgrade preparation taking place in the current construction
construction phase. Stockpiling of materials in preparation for earth work and backfill
throughout the Site.
Type of Inspection:
© Regular ❑ Pre-storm event ❑x During storm event N Post-storm event
Wean iar farrn 14 .
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Start Date &Time: 7 PM (814) Storm Duration (hrs): 20 Approximate Amount of Precipitation (in): 1.5
Weather at time of this inspection?
❑ Clear ®Cloudy © Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ high Winds
❑ Other: Temperature: 65OF
Have any discharges occurred since the last inspection? ❑Yos MNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes ONo
If yes, describe:
Site-specific 13MPs
IBIVlP BMP " ' B1VIP ' � Carreaitve Abflan Needed arttl Nwytes .
'�� It#stalletl? , Mtaintenlance z' '`�` K��� y �'
... � r
ri
1 Perimeter silt fence MYes ❑No ❑Yes ❑x No
2 Silt sacks MYes []No ❑Yes ®No
3 Compost filter tubes 9Yes ❑No ❑Yes ❑x No
4 Perimeter const. fence MYes ❑No ❑Yes ®No
5 Const. entrancetexit ®Yes ❑No OYes ®No
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 ❑Yes ❑No ❑Yes ❑No
❑Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No ❑Yes ❑No
2021-08-05_Crosspoint-NAndover Inspect(on.doex
Overall Site Issues
BI1Pla�tilty F Implemenfed?� NCalnte ded and'Nefes ; y� ,x
I Are all slopes and ®Yes ❑No ❑Yes x❑No
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource pYes ❑No ❑Yes ONo
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls pYes ❑No ❑Yes NNo GC to ensure that perimeter controls are properly
and sediment barriers installed throughout installation and following
adequately installed completion of retaining wall with slit fence and
(keyed into substrate) compost filter tube, as necessary.
and maintained?
4 Are discharge points OYes ❑No ❑Yes ❑x No
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets pYes ❑No ❑Yes ®No
oroperlv Protected?
6 Is the construction exit ©Yes ❑No ❑Yes ©No Construction entrance/exits have been properly
preventing sediment installed to prevent vehicle sediment tracking.
from being tracked
into the street?
7 Is trash/litter from pYes ❑No ❑Yes ❑x No
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ONO None observed
potential stormwater
contaminants stored
inside or under cover?
91 Are non-stormwater ®Yes ❑No ❑Yes ®No Groundwater dewatering activity was witnessed on-
discharges (e.g., wash site and is properly being controlled.
water, dewatering)
properly controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-08-05 Crosspoint-NAndover Inspectton.docx
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"i certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted, Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the hest of my knowledge and belief, true, accurate, and complete, l am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T. (Design Engineer)
Signature: jaredWahk
Date: 08/05/2021
2021-08-05_Crosspolnt-NAndover—Inspection,docx
45 Franklin Street, 5th Floor
BOHLER // Boston, MA 02110
617.849.8040
Photos Taken on August 5, 2021
Photo 1: Retaining wall installed.
W r
y F y �
k
y �
I Sri
.M
Photo 2: Construction entrance/exit installed off of Andover Street.
www.BohlorEngine&ing.com
"m
O LER
. ..... ------
k, ",V
� c�� �✓ �ems,-„r,��, �, � �"� � � �����"�� °)�� ` �� y
r w i
n
Photo 3: Material stockpiling on-site for earth work preparation,
q)E
S 4
Photo 4, Construction entrancelexit installed off of Turnpike Street,
www,BohicrEngineering.com
AL
C
i r 1-4
i s
r f.
k
,ti f ski� ra �•�r�z�f` _ ,,���L'��".'r`��.+ k��C fay �,k'S.y
_ 3 } � r°,� '_� � "YS V1� rs� c`�•I xE�Si 6v
' r -� '� i f krJ. A-f '1 r"§,� ,ua � �f i 1 S �. i ��,�1;�-, $,'•
y; #7i. '. pn L l
�l ""_
i� "� -•,n
T• • • f • f • •
01,
"'�=• �� .ra ''4 rot ,�+ ' ds S t�v
S � r
n,
d-i 1 ✓l:t � sr n ➢1;' e � { ��1`$ � Yajk�
r "� r M1- /• r e' 1 ,:yr r ��'r?`r i�� t k ,ti ! syr._�.
�.t r. s "z t �-• a-. 1E �" _„ 4. � 1 E - s, l x _.1
!l
c_.:., � i-• � l; �.�' '.Sr 1•t_4y. � Lb r � E �}�� 1 �'.rsl ��r t�ti a�;:�
fa'c% t� a f�tir SiftSy4rt: r { 1 i i 1 �]
Saf Vfj'�ti � >P r. s} ritt ��- •
=.r� _� -r y1,e �e�.F��,♦ ?�i f� 5r t,� C f} a:c� (a t�.� a � �i r §11 t:�
'�` ,. ., ,r ,fir#fry:,r`v� �a. _v�. ��� r •��, � � ,a ,i�+ , l�`- '' -�,�,r;�,:
i
i
i
i
i
„3
ram^
B;1'0' lmot L E R
Photo 7: SMH-9 structure installed.
M �
,.�-,lam Syr• '> ":'�' `,�'' /l.a�..� I
7„
nv
t
Photo 8: SMH-2 structure installed.
www,BohlorEngineering.com
Site Inspection Repoli
General linfortt�ak�pn,
Project Name Crosspoint North over
NPDES Tracking Nc. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No.1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection July 27, 2021 Start/End Time 6:00-6:30PM
Inspector's Name(s) Will Granbery; Jared Walsh
Inspector's Title(s) Senior Design Engineer; Design Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications P.E.; E.I.T.
Describe present phase of Earth work and subgrade preparation taking place in the current construction
construction phase. Stockpiling of materials in preparation for earth work and backfill
throughout the Site.
Type of Inspection:
N Regular ❑ Pre-storm event ❑ During storm event ❑x. Post-storm event
Weather Information
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Start Date &Time: 7:OOAM (7125) Storm Duration (hrs): 6 Approximate Amount of Precipitation (in): 0,14
Weather at time of this inspection?
❑ Clear ©Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 77'F
Have any discharges occurred since the last inspection? ❑Yes NNo
If yes, describe:
Are there any discharges at the time of inspection? []Yes Me
If yes, describe:
Site-specific BMPs
BMp BMP BMP Corrective A�tian Needed anti Natea
" a . iristaiied? Maintenance � �' �� "�
ire (lit
� 6
I Perimeter silt fence ❑x Yes ❑No []Yes Me
2 Silt sacks NYes ❑No ❑Yes NNo
3 Compost filter tubes NYes ❑No ❑Yes ©Na
4 Perimeter coast. fence NYes ❑No []Yes ®No
5 Const, entrance/exit ❑Yes ®No []Yes NNo
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 ❑Yes ❑No ©Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No ©Yes ❑No
2021-07-27_Cross polnt-NAndover lnspect[on.doox
Overall Site Issues
B�IPlacttv�4y� ' tmplemenfetl?' 'Marra#errrce Corrective Ac$Ion Necked and Notes l `
1 Are all slopes and ®Yes []No ❑Yes NNo
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource ©Yes ❑No ❑Yes ❑x.No
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls ©Yes ❑No ❑Yes ONo GC to ensure that perimeter controls are properly
and sediment barriers installed throughout installation and following
adequately installed completion of retaining wall with silt fence and
(keyed into substrate) compost filter tube, as necessary.
and maintained?
4 Are discharge points x❑Yes ❑No ❑Yes NNo
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets pYes ❑No ❑Yes NNo
properly rotected?
6 Is the construction exit ❑Yes NNo ❑Yes NNo Construction entrancelexits have been properly
preventing sediment installed to prevent any sediment tracking.
from being tracked
into the street?
7 Is trash/litter from pYes ❑No ❑Yes NNo
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are pYes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ®Yes []No ❑Yes NNo Groundwater dewatering activity was witnessed on-
discharges (e.g., wash site and is properly being controlled.
water, dewatering)
properly controlled?
12 Are there any changes No change in work schedule or sequence'is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-07-27_Crosspoint-NAndover inspection.docx
it
i
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
1 certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T. (Design Engineer)
Signature: _T"e,G Wa41v
Date: 7/28/2021
2021-07-27_Crosspolnt-NAndover Inspectlon,docx
i
x
a
7271 7
7-7
• a Ml
-- - s"y-F w -.-.. '�.. '•,� -
Ve
r
r"r b �,! `" ' a ifj ^♦ � ;�€ � jxy,�r�`�"'' '�ei > 15�4,_ ,
c
• • •• ,a • • • • . • • MOO • •
I.
�Gi
0a1
° 3dAl� �`Y"i,� �7'r•�'�i yr +"'A�i>a �'nv�'�¢Aat a,:C.,
17
t :: R
, ?°
IT
i
BO
i
i
IggifflRij
Photo 3: Material stockpiling on.site for earth work preparation.
v
Y Y
I
�y
"r
Photo 4: Construction entrance/exit installed off of Turnpike Street.
www.BohlerEngineering.com
P
c ti 13 C1 o n n f�
A
4
MN
? t J
a r
:. ;• ,; - .,r,b_..a. _VZri.s.::.vaa-�xrn"?�:�r�a'v`�ti.a' ,Gat�.�✓,„.r�.-�.r .�4..''
Site Inspection Report
.,� ,� �: f � ,General lnfarmat�an
Project Name Crosspoint North Andover
NPD)ES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP Pile No. 1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection June 15, 2021 Start/End Time 1:00-1:30PM
Inspector's Name(s) Jared Walsh
Inspector's Title(s) Design Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Erosion controls and construction fencing remain in place on-site, No active
construction construction was occurring at the time of the site visit while drainage peer
review process is underway.
Type of Inspection:
M Regular ❑ Pre-storm event ❑ During storm event ❑x Post-storm event
,,. . Weather Ir>�format[on � t:,
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Stark Date &Time: 10:00AM (6/14) Storm Duration (hrs): 8 Approximate Amount of Precipitation (in): 0,52
Weather at time of this inspection?
M Clear ®Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 67°F
Have any discharges occurred since the last inspection? []Yes ❑x No
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes UNo
If yes, describe;
Site-s ecific 13MPs
BMP F BIkIIP? EfVIP '' - Gc�rrect�ve Acton Nestled and Notes W,
t
° y fns�a11�d7 Ma�itn�nae ry xFz
X
..,c:. .,,...E ... ..,. .,.. .,. ,r a. v..e..A:, .. ......._... ev_,.w.... ,..., ,...,.;r.
1 Perimeter silt fence UYes ❑No ❑Yes NNo
2 Silt sacks ❑xYes ❑No ❑Yes ®No
3 Compost filter tubes MYes ❑No ❑Yes NNo See note below
4 Perimeter const,fence ®Yes []NO ❑Yes NNo
5 Const. entrance/exit ❑Yes NNo []Yes ®No See note below
6 ❑Yes []No ❑Yes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 ❑Yes ONO ❑Yes ❑No
9 ❑Yes ❑No []Yes ❑No
10 ❑Yes ❑No ❑Yes ❑No
2021-06-16, Crosspoint-NAndover Inspectlon.docx
overall site issues
a BMplact[�ityX� �`� � � "CrrtpC�rrtente�i? ,IfMalin at�att NeecCed artcfNotes� � � ��
Y
1 Are all slopes and ®Yes ❑No ❑Yes IFINo Access to the site remains paved
p p with existing
disturbed areas not asphalt. Demolition of all existing asphalt pavement
actively being worked has not yet begun on-sito.
properly stabilized?
2 Are natural resource MYes ❑No ❑Yes ❑x No
areas (e,g., stroams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls pYes ❑No ©Yes FxlNo Secondary row of compost filter tube has been
and sediment barriers added along existing filter tube along the northeast
adequately installed property line for further reinforcement (see attached
(keyed into substrate) photo).
and maintained?
4 Are discharge points MYes ©No E]Yes ©No
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets MYes ❑No ❑Yes ®No
proporlv rotected?
6 Is the construction exit ❑Yes ®No ❑Yes ®No Construction entrance/exit to be installed following
preventing sediment asphalt removal during demolition phase to prevent
from being tracked any sediment tracking. Access to site remains
into the street? paved in current construction phase.
7 Is trash/litter from MYes ❑No ❑Yes Me
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete) available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ONo None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No OYes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ❑Yes ❑No ❑Yes ❑No None observed
discharges (e.g.,wash
water, dowatering)
ro erl controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-06-15_Crosspoint-NAndover inspection.docx
i
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my Inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information,the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T. (Design Engineer)
Signature: f"P.&WaUU v
Date: 61112021
2021-06-15 Crosspoint-NRndover Inspection.dom
s �� • il• 1
-
1
e
%II [. �r ler1 /7 cif r�JJJJsr -
17' a � j
f
Eff
e
((r
• a • • . • • • MOM a Imam7A- 'f •
" ,l�il. r\` '
r
t
AI
,/
it
r
ram,
y,
ro]
BOHLERI
d
Photo 3: Materials remain stockpiled in the center of the site.
6Y 14
a
Photo 4: Constuction entrance/exit fence remains installed on-site.
www.BohlorEnglneoring.com
B OHLER #
Photo 5: View of extents of slit sock and slit fence along Route 133.
www.BohlerEngineering.com
Site Inspection Report
Gesterallnfcrnrta
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. 1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection June 29, 2021 Start/End Time 12:00-12:30PM
Inspector's Name(s) Jared Walsh
Inspector's Title(s) Design Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Erosion controls and construction fencing remain in place on-site. No active
construction construction was occurring at the time of the site visit.
Type of Inspection:
M Regular ❑ Pre-storm event ❑ During storm event N Post-storm event
Weather irtformatla� �`
Has there been a storm event since the last inspection? ®Yes ❑No
If yes, provide:
Storm Start Date &Time: 2:00AM (6/25) Storm Duration (hrs): 7 Approximate Amount of Precipitation (in): 0,08
Weather at time of this inspection?
Clear El Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
CO Other: Temperature: 920F
Have any discharges occurred since the last inspection? ❑Yes C7x.. No
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes ZNo
If yes, describe:
Site-s ecific 13MPs
rBMP, ' BMP �'� ,BMi�,. � Correctltie Atrttdn Needed arld Notes
InstaiJed? Mstntenatt e � � '�� ' �`
..
1 Perimeter silt fence ❑x Yes ❑No ❑Yes NNo
2 Silt sacks MYes ❑No ❑Yes ©No
3 Compost filter tubes NYes []No ❑Yes ONO
4 Perimeter const. fence NYes ❑No ❑Yes NNo
5 Const. entrance/exit ❑Yes NNo ❑Yes NNo See note below
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes ❑No ❑Yes ❑No
8 ❑Yes ❑No ❑Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No ❑Yes ❑No
2021-06-29_Crosspolnt-NAndover inspection.docx
Overall Site Issues
��MPlactl►tify tmptementecl7 "Minfe�irtce Crirective Actrori Needed anti Nofes" 4'r
Re aired?
1 Are all slopes and ®Yes ❑No ❑Yes ❑xNo Access to the site remains paved with existing
disturbed areas not asphalt. Demolition of all existing asphalt pavement
actively being worked has not yet begun on-site.
properly stabilized?
2 Are natural resource ©Yes ❑No ❑Yes ONo
areas (e,g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls pYes ❑No ❑Yes MNo
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points pYes,❑No ❑Yes ❑x No
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets pYes ❑No ❑Yes ®No
properly rotected?
6 Is the construction exit ❑Yes ®No ❑Yes ®No Construction entrance/exit to be installed following
preventing sediment asphalt removal during demolition phase to prevent
from being tracked any sediment tracking. Access to site remains
into the street? paved in current construction phase.
7 Is trash/litter from Dyes ❑No ❑Yes ❑x No
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes []No ❑Yes []No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater pYes []No ❑Yes ❑No None observed
discharges (e,g., wash
water, dewatering)
r)roperlv controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-06-29_C rosspolnt-NAndover—Inspection.docx
Non-Compliance
Describe any incidents of non-compliance not described above;
Bohler recommends implementing temporary stabilization measures as outlined in Section 4.13.1 of the SWPPP
document as active construction on the Site has ceased for over 14 days. Please advise when construction
processes have resumed or when temporary stabilization measures have been implemented per the SWPPP
guidelines.
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete, I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title. Jared Walsh, E.I.T. (Design Engineer)
Signature: J"e&WalUk
Date: 6/30/2021
1
I
2021-06-29_Crosspolnt-NAndover, inspection.docx
p
,{ d F 1 y
vvw 7
�
J. M
r C T\ �
.
�
v
k4i
4p I 11 {I 1 M � ''T-+•t"!",'.1 a
f
ss; 1 5
r
3t
i v r
�_....—� - }�;1��w'` _ �r� r"",�'-v of 1��,-1 �,�w�„�i�ky_•��.r'. �y „��", '
c
f
-
1
w 5-
L L,
p
H 'b
ag
r�
x.y y ss.
� I
i
Y ti/ I c
k }
-.. ..
q
qt ,
1
fi�rk,
AIMF� r
V/I/
Site Inspection Report
., eneral #n#armatibn ,,
f .Y
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. 1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection July 12, 2021 Start/End Time 1:00-1:30PM
Inspector's Name(s) Jared Walsh
Inspector's Title(s) Design Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Erosion controls and construction fencing remain in place on-site. Active
construction construction was taking place, including earth work and existing asphalt
pavement removal,
Type of Inspection:
0 Regular ❑ Pre-storm event ❑ During storm event N Post-storm event
Has there been a storm event since the last inspection? ®Yes ❑No a
If yes, provide:
Storm Start Date &Time: 4:00AM (7112) Storm Duration (hrs): 7 Approximate Amount of Precipitation (in): 0.95 l
Weather at time of this inspection?
❑ Clear ®Cloudy N Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 68OF
Have any discharges occurred since the last Inspection? ❑Yes NNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe:
Site-specific BMPs.
BMP BMP 81111p Carrect1ve Actinn Needed ald Notes
ry Irkstalled? MaiCnte�lanae s F
1 Perimeter silt fence ❑xYes ❑No ❑Yes NNo See note below
2 Silt sacks NYes ❑No []Yes NNo
3 Compost filter tubes NYes []No ❑Yes ❑x No See note below
4 Perimeter const. fence NYes ❑No ❑Yes NNo
5 Const. entrancelexit ❑Yes NNo ❑Yes NNo See note below
6 ❑Yes []No ❑Yes ❑No
7 ❑Yes ❑No ©Yes ❑No
8 ❑Yes ❑No []Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
i
10 ❑Yes ❑No ❑Yes ❑No
2021-07-12_Crosspolnt-NAndover Inspectlon.docx
Overall:Site Issues
BiUl�Iaativi � �Irktpt iiented? MainYe�ance�� Correct1yo.qct on t�e'edecf and�I+>roi<es s �
Y , Nx. '
r
e r<rtrei�� `
1 Are ail slopes and ®Yes []No ❑Yes NNo Access to the site remains paved with existing
disturbed areas not asphalt. Demolition of all existing asphalt pavement
actively being worked has not yet begun on-site.
properly stabilized?
2 Are natural resource ©Yes []No ❑Yes ❑x No
areas (e.g., streams,
wetlands, mature
trees, etc.)protected
with barriers or similar
BMPs?
3 Are perimeter controls Wes. ❑No ❑Yes MNo Perimeter controls remain in-place following recent
and sediment barriers large storm events with GC taking care to leave a
adequately installed portion of vegetation along the perimeter of the site
(keyed into substrate) for protection of silt fence and compost filter tube.
and maintained?
4 Are discharge points pYes ❑No ❑Yes MNo Discharge point from low spot of the site's property
and receiving waters line to abutter remains clear of signs of sediment
free of any sediment deposits. Perimeter controls are functioning as
deposits? shown on Soil Erosion Control Plan.
5 Are storm drain inlets pYes ❑No ❑Yes ®No
oroDeriv orotected?
6 Is the construction exit ❑Yes ®No ❑Yes ®No Construction entrancelexit to be installed following
preventing sediment asphalt removal during demolition phase to prevent
from being tracked any sediment tracking. Access to site remains
into the street? paved in current construction phase.
7 Is trash/litter from ZYes ❑No ❑Yes NNo
work areas collected
and placed in covered
dum sters?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are pYes ❑No ❑Yes []No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ❑Yes ❑No ❑Yes ❑No None observed
discharges (e.g., wash
water, dewatering)
Properiv controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-07-12_Crosspoint-NAndover Inspectlon.docx
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
9 certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted, Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations,"
Print name and title: Jared Walsh, E.I.T. (Design Engineer)
Signature: jcwe& Jar, v
Date: 7/13/2021
2021-07-12_Crosspoint-NAndcver Enspection.docx
45 Franklin Street, 5th Floor
BOHLEBoston, MA 02110
617.849.8040
Photos Taken on July 12, 2021
Photo 1: Erosion perimeter control measures remain installed on-site.
r
t �
Photo 2: Active earthwork construction in progress at the time of site visit.
www.BohlerEngl need ngxom
i
BOHLER //
r S
F�� -.x c, '�"sr'� ,Y^ - x r -rn 3 cz:. y✓`s��,��' �� h
. .. . ..... .. . ... .......
.......
Photo 3: Materials remain stockpiled in the center of the site.
-
r�
h
Photo 4: Low elevation discharge point of site showing discharge without signs of sediment deposits.
www.BohlorEngineering.com
V
Site Inspection Report
Geriierai lnformation
�. : ... . n . . .. ..r ;
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No.1 WWP No. NIA Permit February 16, 2022
Expiration
Date of Inspection June 1, 2021 Start/End Time 12:00-12:30PM
Inspector's Name(s) Jared Walsh
Inspector's Title(s) Design Engineer
Inspector's Contact (617) 849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Erosion controls and construction fencing remain In place on-site. Ethan Allen
construction and Bliss Spa buildings have been entirely demolished. No active construction
activity was occurring at the time of the site visit.
Type of Inspection:
M Regular ❑ Pre-storm event ❑ During storm event x❑. Post-storm event
Weather Information
Has there been a storm event since the last inspection? ®~ Y
Yes ❑No
If yes, provide:
Storm Start Date &Time: 10:OOAM (5/30) Storm Duration (hrs): 12 Approximate Amount of Precipitation (in): 0.84
Weather at time of this inspection?
N Clear NCloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 73°F
Have any discharges occurred since the last inspection? ❑Yes MNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes MNo
If yes, describe:
Site-specific BMPs
BMP BMp BMP Corrective Aa 10 Needed antl Notes
lnstalCeal? Maintenartce
1 Perimeter silt fence MYes ❑No ❑Yes ONo
2 Silt sacks MYes ❑No ❑Yes NNo
3 Compost filter tubes MYes ❑No ❑Yes MNo See note below
4 Perimeter const. fence NYes ❑No ❑Yes MNo
5 Const. entrance/exit ❑Yes MNo ❑Yes NNo See note below
6 ❑Yes ❑No ❑Yes ❑No
7 ❑Yes []No ❑Yes ❑No
8 ❑Yes ❑No ❑Yes ONO
9 ❑Yes ❑No ❑Yes ❑No
10 ❑Yes ❑No ❑Yes ONO
2021-06-01_Crosspoint-NAndover_Inspection.dom
Overall Site Issues
Blll�lactivity Imptementet7 Maiirttenance „Corrective Actran Heectet ancC Notes
Re uilred7
1 Are all slopes and ®Yes ❑No ❑Yes ONO Access to the site remains paved with existing
disturbed areas not asphalt. Demolition of all existing asphalt pavement
actively being worked has not yet begun on-site.
properlystabilized?
2 Are natural resource Dyes ❑No ❑Yes x❑NO
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls OYes ❑No ❑Yes ONo Pohier recommends an additional secondary row of
and sediment barriers compost filter tube be added along existing filter
adequately installed tube along the northeast property line for further
(keyed into substrate) reinforcement at the natural downstream portion of
and maintained? the Property.
4 Are discharge points OYes ONO ❑Yes ONo
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets ❑xYes ❑No ❑Yes ONO
properIv protected?
6 Is the construction exit ❑Yes ®No ❑Yes ONO Construction entrancelexit to be installed following
preventing sediment asphalt removal during demolition prase to prevent
from being tracked any sediment tracking. Access to site remains
into the street? paved in current construction phase,
7 Is trash/litter from OYes ❑No Dyes ONo
work areas collected
and placed in covered
dum sters?
S Are washout facilities []Yes LINO ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and Dyes ONO ❑Yes ONO None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No Dyes ❑NO None observed
potential stormwater
contaminants stored
inside or under cover?
1 I Are non-stormwater Dyes ONO ❑Yes ❑No None observed
discharges (e.g.,wash
water, dewatering)
properly controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-06-01_Crosspoint-NAndover Inspection.docx
0
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T. (Design Engineer)
Signature: ,TGwed1Wa4sk
Date: 6/1/2021
2021-06-01_Crosspoint-NAndover inspection,docx
45 Franklin Street, 5th Floor
0
Boston, MA 02110 H L E617.849.8040
Photos Taken on June 1, 2021
V
h
Photo 1: Compost filter tube, slit fence, and construction fence installed on-site.
Photo 2: [Natural downstream travel of water onto abutting property. No slit presence observed.
www.BohlerEngineering.com
BOHLER #
i
...........
v ..........
a
"dF .�:"for,„ �, , �e�'r Y�"' .,. :✓r ,abt"a3. ^M ✓✓,a-
r
k
tl �
F
Fwiup:
Photo 3: Demolition of existing buildings on-site complete.
I
7,
r
Photo 4: Secondary constuction entrance/exit not utilized in this construction phase.
www.eohlerEngineering,com
Aft
tsuHLER //
Photo 5:View of adjacent existing Bertucci's building from the Site.
www.BohlerEngineeHng.com
J
Site Inspection Report
' General .nformation
Project Name Crosspoint North Andover
NPDES Tracking No. MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. 1 WWP No. NIA Permit February 15, 2022
Expiration
Date of Inspection May 17, 2021 Start/End Time 4:30-5:00PM
Inspector's Name(s) Jared Walsh
inspector's Title(s) Design Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Erosion controls and construction fencing remain in place on-site. Ethan Allen
construction building was actively being demolished via excavator.
Type of Inspection:
N Regular ❑ Pre-storm event ❑ During storm event N Post-storm event
Weather ntormatian
Has there been a storm event since the last Inspection? DYes NNo
If yes, provide:
Storm Start Date &Time: NIA Storm Duration (hrs): NIA Approximate Amount of Precipitation (in): NIA
Weather at time of this inspection?
N Clear ®Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 73°F
Have-any discharges occurred since the last inspection? DYes NNo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe:
Sites ecific BMPs
BMPNBMP BMP Corrective Action lVeded aritl Notes
llnstalted7 fthtenance
Re"aired?
1 Perimeter silt fence NYes ❑No ❑Yes NNo
2 Silt sacks DYes ❑No ❑Yes ®No
3 Compost filter tubes DYes DNo DYes NNo
4 Perimeter const. fence NYes ❑No DYes NNo
5 Const. entrancelexit ❑Yes NNo ❑Yes NNo See note below
6 DYes DNo DYes ❑No
7 DYes DNo ❑Yes ONO
8 ❑Yes ❑No ❑Yes ❑No
9 ❑Yes ❑No ❑Yes ❑No
10 DYes DNo ❑Yes ❑No
2021-05-17 Crosspoint-NAtidover Itispection.doex
Overall Site Issues
BIkIMPIact vlty Implernented't3 Ma(ntenanGe Corrective Aaron Needed''aind N bii
Re �utre7
1 Are all slopes and ®Yes ONO ❑Yes ©No The majority of the site remains paved with existing
disturbed areas not asphalt. Demolition of asphalt pavement has not
actively being worked yet begun on-site.
properly stabilized?
2 Are natural resource pYes ONO ❑Yes ONO
areas (e.g., streams,
wetlands, mature
trees, etc.) protected
with barriers or similar
BMPs?
3 Are perimeter controls pYes ONO ❑Yes '©No
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points pYes ONO ❑Yes ©No
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets pYes ❑No ❑Yes ®No
ro eri rotected?
6 Is the construction exit ❑Yes ®No [-]Yes ®No Construction ontrance/exit to be installed following
preventing sediment asphalt removal during demolition phase to prevent
from being tracked any sediment tracking.
into the street?
7 Is trash/litter from pYes ❑No ❑Yes ONO,
work areas collected
and placed in covered
du m stets?
8 Are washout facilities ❑Yes ❑No ❑Yes El No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes []No ❑Yes ONO None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ❑Yes ONO ©Yes ONO None observed
discharges (e.g.,wash
water, dewatering)
oror)erlv controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time. Any and all changes will be forwarded
sequence? for Planning Approval.
2021-05-17 Ciosspoint-NAndover lnspection,doex
i
Nan-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Eased on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete, I am aware that there are significant
penalties for submitting false Information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E.I.T. (Design Engineer)
Signature: ,J44-ed,W44hv
Date: 5117/2021
2021-05-17_Crosspoint-NAndover inspection,docx
45 Franklin Street, 5th Floor
EMIRL
Boston, MA 02110
amp 617.849.8040
M--M U H L F�=
Photos Taken on May 17, 2021
T�
Photo 1: Construction fence separating existing Bertucci's parking lot from active construction
activities.
Photo 2: Existing asphalt pavement remains in place at construction fence entrancelexit.
www.BohlerEnginear[ng.com
0` L IR I
Photo3 Construction fence, slit fence, and compost filter tube in place providing se dimema|on
barrierfor abutting property.
�. . . .
Photo Active demolition of existing Ethan Allen and Bess Spa building.
www.mh� «nlg_69pm
Site Inspection Report
.. era! Information
PraJect Name Crasspoint North over
NPDES Tracking No, MAR100393 Location 419 Andover St, N. Andover, MA
DEP File No. 1 WWP Na, NIA Permit February 15, 2022
Expiration
Date of Inspection May 7, 2021 Start/End Time 9:00-11:00 N
Inspector's Name(s) Jared Walsh
Inspector's Titfe(s) Design Engineer
Inspector's Contact (617)849-8040
Information
Inspector's Qualifications E.I.T.
Describe present phase of Pre-construction meeting. Erosion controls and construction fencing have been
construction installed. Dig Safe markings have been applied on the property per existing
utility locations.
Type of Inspection:
Z Regular ❑ Pre storm event ❑ During storm event © Post storm event
Weather Infarmatlan �"
Has there been a storm event since the last inspection? ❑Yes ©No
If yes, provide:
Storm Start Date & Time: NIA Storm Duration (hrs): N/A Approximate Amount of Precipitation (in): NIA
Weather at time of this inspection?
N Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snowing ❑ High Winds
❑ Other: Temperature: 55OF
Have any discharges occurred since the last inspection? ❑Yes ONo
If yes, describe:
Are there any discharges at the time of inspection? ❑Yes NNo
If yes, describe:
Site-s ecific BMPs
�BMP � BMP
�, �, 81111� Corrective Ration Neecietl anal Notes
' v'�,� r Insfatletl7 Ma�atenance ����'�'�� a
1 Perimeter slit fence x Yes ❑x No
2 Silt sacks ®Yes ❑Na ❑Yes ®No
3 Compost filter tubes ©Yes ❑No ❑Yes NNo
4 Perimeter const. fence ®Yes []No ❑Yes ®No l
5 Const. entrance/exit ❑Yes ®No ❑Yes ©No See note below
6 ❑Yes ❑No ❑Yes ❑No
❑Yes ❑No ❑Yes ONO
8 ❑Yes ❑No ❑Yes ❑No
9 ❑Yes ❑Na ❑Yes ❑No
10 ❑Yes ❑No ❑Yes ❑No
2023-05-07_crosspoint-NAndover_Jnspection.doex
overall Site Issues
BNlPlactrvity Irhplelnsntetl? 1Meihtenance ` Correct�ve��►etioin'Needef�anctNbte�s `> v
„Re aired?
w t
I Are all slopes and.... ®Yes ❑No ❑Yes ONo The majority J ...; p� .. g.„
a"ont of the site remains paved with existing
disturbed areas not asphalt. Demolition has not yet begun on-site,
actively being worked
properly stabilized?
2 Are natural resource Oyes ❑No ❑Yes ONo
areas (e.g., streams,
wetlands, mature
trees, etc.)protected
with barriers or similar
BM Ps?
3 Are perimeter controls OYes ©No ❑Yos Me
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points oyes ❑No ❑Yes MNo
and receiving waters
free of any sediment
deposits?
5 Are storm drain inlets ❑xYes ❑No ❑Yes ®No
properly rotected?
6 Is the construction exit ❑Yes ®No ❑Yes ®No Construction entrance/exit to be installed following
preventing sediment asphalt removal during demolition phase to prevent
from being tracked any sediment tracking.
into the street?
7 Is trash/litter from ©Yes ❑No ❑Yes ONo
work areas collected
and placed in covered
dum stets?
8 Are washout facilities ❑Yes ❑No ❑Yes ❑No None observed
(e.g., paint, stucco,
concrete)available,
clearly marked, and
maintained?
9 Are vehicle and ❑Yes ❑No ❑Yes ❑No None observed
equipment fueling,
cleaning, and
maintenance areas
free of spills, leaks, or
any other deleterious
material?
10 Are materials that are ❑Yes ❑No ❑Yes ❑No None observed
potential stormwater
contaminants stored
inside or under cover?
11 Are non-stormwater ❑Yes ©No ❑Yes ❑No None observed
discharges (e.g.,wash
water, dewatering)
ro erl controlled?
12 Are there any changes No change in work schedule or sequence is known
in work schedule or at this time.Any and all changes will be forwarded
sequence? for Planning Approval.
2021-05-07_Crosspoint-NAndove_Inspection.docx
Non-Compliance
Describe any incidents of non-compliance not described above;
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations."
Print name and title: Jared Walsh, E .I.T. (Design Engineer)
Signature: Ja4le&WaUk