Loading...
HomeMy WebLinkAbout2022-01-04 Long Term Stormwater O&M Plan 1 Sullivan Engineering Group, LLC Civil Engloeers&Land Development Consultants Long-Term Stormwater Operation & Maintenance plan 33 Appledore Lane, forth Andover Beginning with the construction of the drainage system,and continuing in perpetuity thereafter,the owner(s) of the site shall maintain in accordance with the following schedule: a. Pavement and walkways shall be swept in the early spring immediately after snow melt b. Paving&cape cod berm shall be maintained in good condition to channel surface runoff into the trench grate c. Roof drain inlets, downspouts, and roof drain pipes - All components of the.roof drain collection system shall be inspected at least 2 times per year. Sediments and debris shall be removed and disposed of in accordance with all applicable federal, state, and local laws. Any components that become damaged shall be repaired or replaced immediately upon discovery to assure proper conveyance of stormwater runoff into the drrywell systems. d. Concrete drywells—The level of water in the drywells shall be monitored during and after heavy rain storms at least 2 times per year during the first year of operation and at least twice annually thereafter for evidence of clogging or other problems. If water does not leave the chambers within 72 hours after the storm,or if water breaks out on the surface above the system, or if the roof collection system begins to overflow frequently(for the 10 year storm intensity or less intense storms),the infiltration bed is likely clogged. The infiltration bed shall be cleaned and repaired or replaced as needed to maintain proper functioning. e. Vegetation shall be maintained in healthy condition to prevent erosion and sedimentation in the drainage system and wetland resource areas. £ Trench drain and concrete manhole—Each structure shall be inspected at least four(4)times a year to insure proper function. The trench drain shall be cleaned of any sediment or leave collection immediately. The concrete manhole sump shall be cleaned if sediment buildup exceeds 50%of the sump capacity(2 feet of sediment) 12/28/2021 Owner: Date Sean Delaney P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksul153@eomeast.net