Loading...
HomeMy WebLinkAboutAddendum to Finding Application with Plans and Exhibits - Plans - 315 TURNPIKE STREET 9/13/2023 Addendum to Application for a Finding Preliminary Information: The proposed project has been determined to be an educational use under M.G.L. c. 40A, Section 3 (the"Dover Amendment")'. Standard of Review: Applicant notes that the standard of review for a Dover use is reasonableness. The purpose of the Dover Amendment is to "strike a balance between preventing local discrimination against an educational use, and honoring legitimate municipal concerns that typically find expression in local zoning laws." Trustees of Tufts College v. City of Medford, 415 Mass. 753, 757 (1993). The key inquiry here is whether North Andover's height restriction is a "reasonable regulation." This depends on two factors: 1) whether it serves "legitimate municipal purposes," such as promoting public health or safety or preserving the character of an adjacent neighborhood; and 2) whether "compliance would substantially diminish or detract from the usefulness of a proposed structure, or impair the character of the institution's campus, without appreciably advancing the municipality's legitimate concerns." Id. at 757-760. The Supreme Judicial Court ("SJC") has also indicated that excessive cost of compliance, without significant municipal gain,may also qualify as unreasonable.Id. Importantly,"facially neutral requirements cannot be applied to educational uses without further inquiry into the outcome produced by such an application . . . particularly where the requirements sought to be applied do not take into account the special characteristics of an educational use."Id. at n. 6. A. The particular use proposed for the land or structure. Applicant is a non-profit school proposing to construct two buildings on an undeveloped portion of the college campus located at the corner of Turnpike Street and Andover Street. The proposed buildings will be used for college programming.Each building will be four levels,comprised of first-floor academic space with residential dormitories on the first and upper floorS2.Building 1, situated along Turnpike Street,will be approximately 79,653 square feet.Building 2, situated along Andover Street, will be approximately 61,482 square feet. The proposed project is located in the Residence 3 (R-3) zoning district. Building height in all residential districts, including the R-3 district, is limited to 35 feet, per the Table of Dimensional Requirements appended to the North Andover Zoning Bylaw3. The By-law defines building height as "The vertical distance as measured from the average finished grade level adjoining the building at all exterior walls to the highest roof surface,but shall not include chimneys,spires or mechanical equipment or penthouses used for enclosure of mechanical equipment." As proposed,upon completion Building 1 will have a height of approximately 47.1 feet and Building 2 will have a height of approximately 46.9 feet. Applicant seeks a finding from Board that the proposed building heights are reasonable for this educational use, consistent with the Dover amendment. ' See Letter of Determination from Paul Hutchins dated August 4,2023. 2 See generally Ground Floor Plan,Typical Residential Floor Plan(2°d Yd &4'Floors),Building 1 Conceptual Elevations, Building 2 Conceptual Elevations,and Layout and Materials Plan submitted herewith. 3 See Table of Dimensional Requirements attached hereto. B. Facts relied upon to support a finding that relief sought will be desirable and without substantial detriment to the public good. This project is an educational use under M.G.L. c. 40A, Section 3 (the"Dover Amendment")4. The purpose of the Dover Amendment is to"strike a balance between preventing local discrimination against an educational use, and honoring legitimate municipal concerns that typically find expression in local zoning laws." Trustees of Tufts College v. City ofMedford, 415 Mass. 753, 757 (1993). The key inquiry is whether the applicable restriction—here the building height restriction—is a"reasonable regulation" given the educational use. At the outset,North Andover's building height restriction is facially neutral because it applies to all uses in the Residence 3 District. However,the Court noted that"facially neutral requirements cannot be applied to educational uses without further inquiry into the outcome produced by such an application ...."Id. at n. 6. The approximate heights of the proposed buildings are 47.1 feet and 46.9 feet. Though taller than the 35- foot limit, the buildings will not be unreasonably high for the campus or the area in which the project is located. The College's campus already features many large three and four-story buildings that range in height from 41 feet to 50 feet. Given that these buildings average a height of approximately 47 feet, the heights of the proposed buildings are reasonable, and will be harmonious with the campus' current aesthetic. The College parcel lies within a residential district, however, it is surrounded by business and industrial districts 6 all of which allow higher buildings as of right. The proposed project site sits on the corner of two major roadways that house various commercial and residential uses and buildings. Many of the parcels abutting and/or closely adjacent to the subject parcel are zoned General Business (GB), Business-4 (B-4), and Industrial-1 (1-1). Each of these zoning districts has a higher building height limit than the residential districts. The respective building height limits in the surrounding districts are 45 feet(BG), 60 feet(B-4), and 55 feet(11)7. Accordingly,the character of the surrounding neighborhood is primarily commercial and features large buildings located off Route 114 on either side of the campus. Furthermore, the Bylaw contemplates and provides an exception for buildings that exceed the 35-foot height limit in residential zones for certain non-single-family residences$. Here, the College is not seeking to build an excessively tall single-family home,but rather, is seeking relief to construct reasonable multi-level buildings that will primarily serve as academic and residential space for on-campus students. Given the location of the parcel and the diversity of height requirements afforded to the surrounding parcels, the proposed buildings are 4 See Letter of Determination from Paul Hutchins dated August 4,2023. 5 See schematic marked"Exhibit B2"attached hereto. 6 See Town of North Andover Zoning Map. See Table of Dimensional Requirements.Also see Town of North Andover Zoning Map attached hereto, Schematic entitled"Existing Building Heights"attached hereto,and schematic entitled"Surrounding Building Height Limits"attached hereto. s Section 195-7.4(F) of the By-law provides for a waiver of the 35-foot requirement for "residential multifamily dwellings and townhouses described under Table 2;provided that such height waiver shall not permit a structure to exceed more than four stories and 55 feet in height,and further provided that such waiver is granted by the Planning Board, as special permit granting authority, after the Planning Board has made a determination based upon consideration of the special permit criteria described under§ 195-10.7A of the Zoning Bylaw." 2 more likely to blend into the environment than they are to protrude or tower above a nestle of residential dwellings.Furthennore,by constructing taller buildings,rather than larger footprint buildings,Applicant is able to preserve green space. The goal of this project is to provide a mixed-use, amenity rich space for students that will enhance the on- campus living and learning experience. The proposed design achieves this goal by providing residential and academic space on the ground floor, with residential space on the upper floors. The proposed number of residential beds is necessary to accommodate the College's aging housing stock and off-campus options. Strict compliance would require the College to forgo academic and amenity space to relocate additional beds to the ground floor. The relief requested allows the College to maintain critical ground-floor academic space, and achieve its goal to create a multi-functional academic and residential experience for students. With the relief sought,the College will be able to create additional academic and residential space to serve its students, while maintaining the aesthetic of the campus, integrating with the look of the surrounding neighborhood, and maintaining green space. The result will be the construction of buildings that are reasonable and consistent with the existing buildings on campus and in the neighborhood, without substantial detriment to the public good. Rather,the proposed project will have a positive impact on the campus and the Town of North Andover by: creating a new accessible pedestrian connection between the Route 114/Turnpike Street intersection to the Collegiate Church of Christ the Teacher, along with on-campus accessible walkways within the new project, creating of two-way vehicular circulation and supplemental emergency access routes between the new buildings for North Andover first response vehicles, enhancing the pedestrian and view corridors from Route 114/Turnpike Street onto campus, including enhancement of the existing Christ the Teacher statue. In addition, the Project has no impact or minimal impact to residential neighborhoods, wetland resources, nearby traffic,neighborhood parking, Town drainage systems,water supply system, or sewer system. C. Addressing all details of the Building Commissioner's denial when appropriate. The Building Commissioner's denial is based upon the building heights exceeding the maximum height of 35 feet in the Residential 3 zoning distriet.9 As addressed above,Applicant seeks relief from the 35- foot building height limit to construct two buildings of approximately 47.1 feet and 46.9 feet. As detailed above, such relief is reasonable for this educational use and without detriment to the public good. 9 See Zoning Bylaw Denial Form submitted herewith. 3 List of Enclosed Documents Exhibit A - Town of North Andover Zoning Map - Schematic: "Surrounding Building Height Limits" - North Andover Zoning Bylaw Table 2: Summary of Dimensional Requirements Exhibit B - Zoning Bylaw Denial Form, dated August 21,2023 —REVISED August 30,2023 - Building Permit Application No. 73970 dated August 15,2023 - Letter from Paul Hutchins,re: Dover Determination, dated August 4, 2023 Exhibit C - Certified Plot Plan, Coiner Development Project at Merrimack College,North Andover, MA by VHB, dated August 17,2023 - Graphic Aid,Merrimack College Corner Development Project by Cube 3, dated August 17, 2023 - Schematic: Existing Building Heights, Corner Development Project at Merrimack College, North Andover,MA by VHB dated August 17, 2023 - Schematic: Average Grade Calculation, Corner Development Project at Merrimack College, North Andover,MA by VHB dated August 17, 2023 - Layout and Materials Plan—Corner Development Project at Merrimack College, 315 Turnpike Street,North Andover, MA by VHB, dated August 17, 2023 Exhibit D - Ground Floor Plan,Merrimack College Corner Development Project by Cube 3, dated August 16, 2023 - Typical Residential Floor Plan(2nd 3rd&4th Floors), Merrimack College Corner Development Project by Cube 3, dated August 16, 2023 - Building 1 Conceptual Elevations (2 pages),Merrimack College Corner Development Project by Cube 3, dated August 16, 2023 - Building 2 Conceptual Elevations (2 pages),Merrimack College Corner Development Project by Cube 3, dated August 16, 2023 - Perspective View,Merrimack College Corner Development Project by Cube 3, dated August 16, 2023 Exhibit E - Town of North Andover 300' Abutter GIS Map dated August 3,2023 - Town of North Andover 300' Abutters List - Town of Andover 300' Abutters List Exhibit F - Deed to Merrimack College f/lda the Augustinian College of the Merrimack Valley dated July 21, 1947 - Owner's Authorization 4 EXHIBIT A Town of North Andover mellhueln a Zoning Map XX, Dmintown Vicinity IX //iii%% 4 11- /l'/ ,l// %//// �11 jY"/ /,li /// / rf {✓ mmon ns ! 21// �iiii/ L,awll"e11WTIMIT "tl 1107 yy✓ yA "", r //iiiiiiiiiii/ra/ /i / t°P' r /// 5 your,� ,..�-. t fi / f j // / / III .` /�+' li.�°ii*t i�///%�✓%/ �i /i '�. aye //''� � ''. 1 3h w 1� t«, 11 IIIIIIIIIIN - "'' '; %/d Nell If?l.✓R ''� r tv Ilulllullll o,v�3 �� "�y 3' �a . . A1fdG':hVAeir Mendirnack "I lii 4 Valley Planning Commission �, 841 GS G� IS' R4 m RS GB 1 T ` Ru FCD �$ 55 FT 2-3 es001 e R5 $ CDD2 e RT \ a Andover =t DOWNTOWN E I2 Surrounding Building Height Limits t99 .,. , ZONING 195 Attachment 3 Town of North Andover Table 2:Summary Of Dimensional Requirements [Amended 6-18-2019 STM by Art.1.6-17-2021 ATM by Art.271 Res. Res. Res. Res. Village Res. Res. Bus. Bus. Bus. Bus. Village PCD General CDD CDD CDD Ind. Ind. Ind. Ind. 1 2 3 4 Res.("' 5r""' 6 1 2 3 4 Comm. Bus. 1 2 3 1 2 3 5 Lot area,minimum(square feet) 87,120 43,560 25,00 12,500 43,560 43,56017) 130,690 25,000 25,000 120,00 80,000 90,000 150,00 25,000 43,560 43,560 108,90 80,000 80,000 435,600 50,000 0 0 0 0 Height,maximum(feet) 35 35 35 35 35 35 35 35 35 35 60 40*`7) 35*** 45 35 35 45 55 55"3' 55 55 Street frontage,minimum feet 175 150 125 100 85(13' 150 1501ll) 125 125 300 200 200 300 125 150 150 250 150 150 150 150 Front setback,minimum(feet) 30 30 30 30r2) 25 30 25 30 25 100 50 50**P7)r" 100 25 100) IOr" 151" 50 50 100,10) 30 Side setback,minimum(feet) 30 30 20 15 15 25 15 201" 25'2' 50` 50r" 25**('-' 50 25(2' 15 15 20 50r" 50"' 2001°J 20") Rear setback,minimum(feet) 30 30 30 30 30 30 30 30,2' 30(2' 50"' 50 25**r" 50 35«' 20 25 30 50"' 50"' 20000' 30") Floor area ratio.maximum N/A N/A N/A N/A N/A 0.75:1 0.25.11" 0.30.1 0.75.1 0.40.1 1.50.1 N/A 0.75:1 N/A 0.75:1 0.75.1 0.75:1 0.50.1 0.50:1"" 0.50.1 0.50.1 Lot coverage,maximum N/A N/A N/A N/A N/A 20% 200/t, 30% 35% 30% 25% 25°/u 25°% 35% 70% 70% 70% 35°% 35% 35%"" 35% Dwelling unit density, N/A N/A N/A N/A 1/acre"2' Multi- 9/acre"2' N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A maximum/acre family(- Townhouse Open s ace 25%**"h' 30% 30% * Two stories,not to exceed 40 feet ** Refer to§§195-8.4A(Note 6)and 195-8.6E. *** See detailed district use regulations. Please refer to footnotes for additional information. Footnotes 1. In all districts except Village Commercial and any Corridor Development District,front setbacks along Route 114 shall be a minimum of 100 feet.Front setbacks shall be 100 feet along 125 in Industrial I and 2 Districts;the first 6. Dimensional regulations for townhouse complexes shall meet the requirement of the Residence 5 District; 50 feet of front setbacks under this requirement shall be made to provide an effective visual buffer and no parking individual townhouses within the complex,however,shall be regulated as follows: shall be permitted. Minimum street frontage:18 feet 2. Adjacent to residential districts,an additional fifteen-foot side or rear setback shall be required.The first 15 feet of the total setback abutting the residential district shall remain open and green,be suitably landscaped,un-built Minimum front setback:30 feet upon,unpaved and not parked upon.In the Business 2 District,the side yard requirements may be eliminated when two adjoining property owners agree to share a party wall. Minimum side setback None required where a party wall is constructed between units;otherwise a twenty- five-foot side setback shall be provided 3. Adjacent to residential districts,the required side or rear setback shall be 100 feet. The first 50 feet of such setback abutting the residential district shall remain open and green, be suitably landscaped, un-built upon, Minimum rear setback:30 feet unpaved and not parked upon. Maximum floor area ratio:1.20:1 4. If an enclosed parking structure is provided,lot coverage may be increased up to the amount of such parking area but not exceed a total coverage of 45%. Maximum lot contiguous units:10 5. Minimum lot size for a townhouse complex shall be 43,560 square feet although individual townhouse lots may be a minimum of 3,000 square feet.Minimum lot size for an apartment complex shall be 60,000 square feet. 195 Attachment 3:1 supp 3,Sun 2021 NORTH ANDOVER CODE 7. The following additional requirements shall apply when apartments or townhouse complexes are constructed in 15. In accordance with the procedures and regulations set forth in § 195-10.7 of this bylaw, an application for a this district. special permit may be submitted to increase the allowed floor area ratio (maximum) from 0.25:1 to 0.30:1, provided that at least 5,000 square feet(excluding basements)of the resulting gross floor area are deeded to the a) There shall be a paved driveway or paved walk adequate to accommodate emergency vehicles within 50 feet Town for public use proposes;that at least 2,500 square feet of said area is located at street level,and that the of the outside entrance of each dwelling unit. entire square footage,exclusive of basements,deeded to the Town is supported with parking spaces at the rate of one space per 250 square feet. b) Any road providing access to townhouses or lots intended for townhouses shall conform to the Subdivision Control Regulations of the Planning Board. 16.Open space shall be consistent with the definition of usable open space as contained in Article 8,Part 5,§ 195- 8.27F,Usable open space.No loading areas shall be allowed on the usable open space. c) Any road providing access to more than 18 apartment dwelling units or more than 24 parking spaces shall conform to appropriate provisions of the Subdivision Control Regulations as if it were a minor residential All required front,rear,and side yard requirements may be calculated as part of the usable open space,but in no street.Before issuing a building permit in such cases,the Building Inspector shall obtain a report from the instance shall any area designated for open space be less than 15 feet in width. Planning Board on the extent of such conformity. Further,no more than 25%of the total area required for open space shall be a wetland area,and no pennanent ol- d) Maximum height(apartment building):40 feet. standing water bodies shall be calculated as part of the required open space. e) Maximmn stories of living quarters(apartment building)_three. 17.Village Commercial Dimensional Requirements. f) Maximum units per structure(apartment building):18. Setbacks 8. In Residence 4 Districts only,front setback may be the average of all front setbacks of dwelling units within 250 Objective:The setbacks have been determined and arranged in such a way as to promote a quality development feet on either side of the lot.Buildings on comer lots shall have the required front setback from both streets except which lends itself to the surrounding community in an unobstractive manner. in the Residence 4 Districts,where setback from the side street shall be a minimum of 20 feet. a) Front setbacks for strictures along Route 114 shall be a minimum of 50 feet,all of which shall be used as an 9. Nursing and convalescent homes shall have at least 600 square feet of lot area per bed.The minimum lot size for effective visual buffer.No parking shall be allowed within that fifty-foot buffer.Any roadways or drives such homes in Rl,R2,and R3 Districts shall be two acres. within that fifty-foot buffer shall be as necessary for access only. 10.Where a public sanitary disposal site is the primary use,the setback area shall be used to provide a screening, b) When adjacent to a residential district,the minimum setback shall be 40 feet,with the first 25 feet remaining natural or artificial,from adjacent residential use ofpublic roadway, as an effective visual buffer.The Planning Board may allow the minimum setback adjacent to a residential district to be reduced to 25 feet,provided that the maximum height of the proposed structure is 25 feet,not to 11. Where a public sanitary disposal site is the primary use,an increase up to 100%of the lot coverage shall apply, exceed one story.Further,for every one foot that the structure is moved closer than 40 feet to the residential not including the setback areas. property line,the maximum allowed height of the structure shall be reduced by one foot(See Diagram I).1n no instances shall a structure be closer than 25 feet to a side or rear setback.Any roadway or drives within 12. If multifamily structures are selected to attain the maximum density allowed,the proposed project shall be subject those setbacks shall be as necessary for access only. to the minimum open space requirements found in Article 8,Part 5,Planned Residential Development,and to the site plan review requirements of§195-10.7. Footnote 17.Village Cammer ciat Dimensional Requirements-Diagram I In the instance where no public sewer service is provided and there is not private sewer system acceptable to the Town,the allowed density in the Village Residential Zone shall be one dwelling unit per acre and said dwelling and associated lot shall conform to all the regulations consistent with development in the R-2 Zone.Further,under no circumstances shall multifamily development be allowed in the Village Residential Zone, regardless of density,without the provision ofpublic sewer or a Town-approved and-accepted private sewer system. 13. In instances where a lot fronts on Route 114,for purposes of public safety,the required lot front shall be 250 feet. - 14. The dimensional criteria described in the table below applies only to detached single-family development. j ce Multifamily structures developed in this district shall be subject to all criteria applicable to multifamily v- developments as stated in Article 8,Part 5.However,in no instances shall the bonus density sections of Article 8, Part 5 apply in the Village Residential District. 195 Attachment 3:2 supp s,Sun 2021 ZONING 18. The Planning Board may grant approval of an increase in the maximum height described under Table 2,provided that such approval shall not permit a structure to exceed 105 feet in building height,that the lot is at least 100 acres in size, and further provided that such approval is granted by Planning Board special permit after consideration of the special permit criteria described under§ 195-10.7A of the Zoning Bylaw. 19. The Planning Board may grant approval of an increase of the maximum floor area ratio described under Table 2, provided that the floor area ratio shall not exceed 1.0:1,that the lot is at least 100 acres in size,and that such approval is granted by Planning Board special permit after consideration of the special permit criteria described under§195-10.7A of the Zoning Bylaw. 195 Attachment 3:3 supp s,Jun 2021 EXHIBIT B Zoning Bylaw Denial Form Town of North Andover Building Depat•tnierzt 120 Maid Street North Andover,MA, 01845 Phone 978-688-9545 Fax 978-688-9542 Street: 315 Turnpike Street MaplLot: 025.0-0013 Applicant: Jacob Hawes Request; Variance Date: 812112023 - Revised 8/3012023 Please be advised that after review of your Application and Plans that your Application is DENIED for the following Zoning Bylaw reasons: Zonin Item Notes Item Notes A Lot Area F Frontage 1 Lot area Insufficient 1 Frontage insufficient 2 Lot Area Preexisting 2 Frontage Complies 3 Lot Area Complies 3 Preexisting frontage 4 Insufficient Information 4 Insufficient Information B Use 5 No access over Frontage 1 Allowed G Contiguous Building Area 2 Not Allowed 1 Insufficient Area 3 Use Preexisting 2 Complies 4 Special Permit Required 3 1 Preexisting CBA 5 Insufficient Information 4 Insufficient Information C Setback H Building Height 1 All setbacks comply 1 Height Exceeds Maximum X 2 Front Insufficient 2 Complies 3 Left Side Insufficient 3 Preexisting Height 4 1 Ri ht Side Insufficient 4 1 Insufficient Information 5 Rear Insufficient I Building Coverage G Preexisting setbacks 1 Coverage exceeds maximum 7 Insufficient Information 2 Coverage Complies D Watershed 3 Coverage Preexisting 1 Not In Watershed 4 Insufficient Information 2 In Watershed J Si n 3 Lot prior to 101204 1 Sin not allowed 4 Zone to be Determined 2 Sign Complies 5 insufficient Information 3 Insufficient Information E Historic District K Parkin 1 In District review required 1 More Parking Required 2 Not in district 2 Parking Com lies 3 1 Insufficient Information 3 Insufficient Information 4 Pro-existing Parkin Remedy for the above is checked below, Item# Special Permits Planning Board Item# Variance Site P€an Review Special Permit Setback Access other than Frontage Special Permit Parkin Frontage Exception Lot Special Permit Lot Area Common Driveway Special Permit H 1 Height Congregate Housing Special Permit I Sign Continuing Care Retirement Special Permit Contiguous Building Area Independent Elderly Housing Special Permit Special Permits Zoning Board Large Estate Condo Special Permit Special Permit Non-Conforming Use ZBA Planned Development District Special Permit Earth Removal Special Permit ZBA Planned Residential Special Permit -Special Permit Use not Listed but Similar R4 Density Special Permit Sp ecial Permit for Sign Watershed Special Permit Special permit for preexisting nonconforming Frontage i Plan Review Narrative The following narrative is provided to further explain the reasons for DENIAL_for the APPLICATION for the property indicated on the reverse side: Mtem Refe�encs Reasons for H 1 Town of North Andover Table 2: Summary of Dimensional Requirements Height Maximum Residential 3 Zoning District Is 35 Feat Applicant is requesting a height of 47.1 Feet.A relief of 12,1 Feet in height is requested for building 1 .Building 2 height is 46.9 feet .Height allowed in R-3 zoning is 35 feet.A relief of 11,9 is requested by the applicant. The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the applicant serve to provide definitive answers to the above reasons for Any inaccuracies,misleading information,or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department.The attached document titled"Plan Review Narrative"shall be attached hereto and incorporated herein by reference. The building department will retain all plans and documentation for the above file.You must file a new permit application form and begin the permitting process. F" *4= 8/15/2023 _812112023 � eparlment Official Signature Application Received Application Denied gl3ol��J� Denial Sent: 8121/2023 - s�o rG,{ If Faxed Phone Number/Date: Referred To: Fire X Health Police X Zoning Board X Conservation Department of Public Works X Planning Historical Commission Other X Building Department File Message Help BLUEBEAM Tell rne what you want to do tit ED Share�o earns (,�] Mark LJ nread D Find Zoorn ... '�2 a [EXTERNAL] Application submitted for 315 TURNPIKE STREET rown of North Andovei, MA<i)oreply@viewpoil)tClOLuCI.COIII> Reply �K) Reply All > Porwaid fiS to GJacoli liw8/1S/202i U6 AIM If there are brobleni�,with how tfiiS.rnessaqe is displayed,r,llr,k fiery to vi—it in a web bro—ei, WE Town of North Andover, I Your application has been submitted successfully! Type: *Building Permit Number: 73970 WOOM 0 8/15/23,9:41 AM Record 73970-ViewPoint Cloud *Building Permit 73970 Your Submission Attachments Guests (1) O Building Department Review Fire Department Review Treasurer Review Conservation Review Planning Review Health Review DPW Engineering Review DPW Operations Review Building Inspector Approval New Construction Building Permit Fees Building Permit Issued Temporary Dumpster Permit Issued Building Inspection Your submission Submitted Aug 15, 2023 at 9:35am Contact Information Jacob Hawes Email address https://northandoverma.viewpointcloud.com/track/l 00420/submission 1/6 8/15/23,9:41 AM Record 73970-ViewPoint Cloud Jacob.hawes@greystar.com Phone Number 6179456892 Mailing Address 1 Federal Street , Boston, Massachusetts 02110 Locations 1 location total PRIMARY LOCATION ,' 315 TURNPIKE STREET NORTH ANDOVER, MA 01845 Application Submission Are you submitting this application as the Homeowner? NO Primary Contractor Firm (Business) Name Licensee EMERY L GREEN License # CS-116548 License Expiration Date 04/03/2025 https://northandoverma.viewpointcloud.com/track/l00420/submission 2/6 8/15/23,9:41 AM Record 73970-ViewPoint Cloud License Type Construction Supervisor License Active O License Status Active Mailing Address 133 FOSTER RD, SWAMPSCOTT, MA, 01907 Preferred Telephone #: 8576751604 Alternate Phone # Email emery.green@greystar.com I certify, under the pains and penalties of perjury, that the information on this application is true and complete. G Project Information Type of Project New Construction Type of Improvement New Building Proposed Use Non-Residential Building Describe the type of use Academic Space and Dormatory Description of Work to be Performed https://northandoverma.viewpointcloud.com/track/l00420/submission 3/6 8/15/23,9:41 AM Record 73970-ViewPoint Cloud New Construction of Two New 4 level Academic and Dormatory Buildings Is property on Town water Yes Is property on Town sewer Yes Project Cost (if new construction base on $125 per square foot and if addition/alteration/renovation base on actual contract price) 40,000,000 Does this project require a temporary construction dumpster? Yes Does this project require a temporary construction trailer? YES Does this project require a temporary construction sign? YES Danger Zone Literature (MGL CHapter 166 Section 21A-F and G min. $100-$1,000 fine) NO Registered Design Professional Architect/Engineer Name Cube 3 Architect/Engineer Address 370 Merrimack Street, Lawrence MA Architect/Engineer Phone Number 978-989-9900 Architect/Engineer Reg. # Aaron Bancroft/20545 Construction Dumpster Permit Application https://northandoverma.viewpointcloud.com/track/l00420/submission 4/6 8/15/23,9:41 AM Record 73970-ViewPoint Cloud Name of Dumpster Company (if applicable) KTown Disposal Dumpster Arrival Date 06/03/2024 State clearly purpose for which the Construction Dumpster Permit is requested Recycling and Waste disposal generated from the construction of the new buildings Insurance I have a current liability insurance policy or its substantial equivalent. Yes If yes, indicate the type of coverage Liability If other, specify Worker's Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Are you an employer? Select the appropriate type.Any applicant that selects #1 must also fill out the section below showing their workers' compensation policy information. 1. 1 am an employer with employees (full and/or part-time) Type of project 7. New Construction I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name (Attach a copy of workers' compensation policy declaration page showing the policy number and expiration date) Sompo America Insurance Company Policy # or Self-Ins. License # * https://northandoverma.viewpointcloud.com/track/l00420/submission 5/6 8/15/23,9:41 AM Record 73970-ViewPoint Cloud WCDS108610 Expiration Date O1/02/2024 Workers' Compensation Affidavit Signature I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. G undefined Town of North Andover, MA Your Profile Your Records (/dashboard/records) Resources Search for Records (/search) Claim a Record (/claimRecord) Employee Login (https://northandoverma.viewpointcloud.io) Portal powered by OpenGov https://northandoverma.viewpointcloud.com/track/l00420/submission 6/6 • � ' � � ... Town of North Andover Building Departrimit North Andover'rown T-Tall 120 Main Street �` �� a � � ��AAA North Aaadovca•, MA 01845 pliutchiars((r7nortlaaaadovea,raaa.gov Paul Hutchins Telephone (978)688-9545 Building Commissioner/Zoning Enforcement Officer Fax (978)688.9542 8/4/2023 Mark B,Johnson Johnson &Borenstein,LLC 12 Chestnut Street Andover Ma,01810 Re; Corner Development Project 315 Turnpike Street North Andover, Ma 01845 Merrimack College Determination letter of Dover Amendment use. Dear Mr Johnson, I have determined that the project of adding two dormitories acid academic space falls under the Dover Amendment as using the guidelines of MGL CH. 40A Section 3 . The Dover Amendment allows that only zoning ordinances or bylaws that a city or town may enforce against the proposed project are reasonable regulations regarding the bulls and height of structures, yard size,lot area,setbacks,open space,parking and building coverage requirements. Respectfully submitted North Andover Building Cormnissioner/Zoning Enforcement m Paul Hutchins EXHIBIT C \\VHb\gbI\p,q\Wat-LD\1 162534 G,ey,ta,P3 De,eIopme,t\cad\Id\PIa,set\1 162534-PLOTA,g ..................wLL .............. .............................................. -0 Turnpike StreetlRoute 114 .....ti .... 4 S E,, 915.3 .0 DEL-LIc F —————— 'k (FGJI ID) L-1 B'47'41" PROPOSED BUILDING 1 ee O ILI- L------------------- '319.12' 153 L 6' '34" LF I .................. ............. e Medina DO e ............ o N E ...... .......... PROPOSED BUILDING 2 1,EFRIN A'1K(A-j C1 '00K k7�7,PAGE S General Notes 1) THE PROPERTY LINES SHOWN ON THIS PLAN ARE BASED UPON AN ACTUAL FIELD SURVEY CONDUCTED BY VANASSE HANGEN BRUSTLIN,INC.IN 5NC AUGUST,2013 AND FROM DEEDS AND PLANS OF RECORD. 2) THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON AN ACTUAL ON-THE-GROUND INSTRUMENT SURVEY PERFORMED BY VANASSEHANGENBRUSTLIN,INC.BETWEEN APRIL AND MARCH,20(6,APRIL,2021,AND AGAIN IN JULY,2023. N 2712'U"E 3) THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED ON FIELD OBSERVATIONS AND INFORMATION OF '812Y RECORD.THEY ARE NOT WARRANTED TO BE EXACTLY LOCATED NOR IS IT WARRANTED THAT ALL UNDERGROUND UTILITIES OR OTHER STRUCTURES . ARE SHOWN ON THIS PLAN. E It') OF 4) HORIZONTAL DATUM IS BASED ON MASS.GRID SYSTEM,NAD 1983.ELEVATIONS SHOWN ON THIS PLAN REFER TO NAVD OF 1988. F, 5) SITE IS LOCATED IN ZONING DISTRICT RESIDENCE 3(R3). 11.5E11 1 BOUSQUET t6) SEE ABUTTERS LIST FOR ABUTTERS OF PROPERTY WITHIN 300'RADIUS. NO 3538 15'. hb Certified Plot Plan Corner Development Q4 0 30 60 120Feet Project at Merrimack College 2023-08-17 7/202 North Andover,MA \\Vhb\gb1\p,q\Wat-LD\1 162534 G,ey,ta,P3 De,e1opme,t\cad\1d\P1a,set\1 162534-GRAPHIC,dwg ........ ..........-\, ��-16ih�tr—eetlRo- u—te—11-4 --- ............................................................................................ ...... X DR11 HcUF TREE TO BE REMOVED(TYP) F UH r PROPOSED Z, BUILDING 1 X X X ................... illci ..................... X X ........... JEFFR�Y W. PROPOSED KOETTERITZ GfV11- BUILDING 2 N�.605 X EFMA K,A-L,F 0A 137O,P4GE .......... X Notes [I P PE 1. PROPOSED BUILDING,SIDEWALKS/PLAZAS,WALLS,AND DRIVE AISLES IN RED. 2. BLACK DASHED LINES NOTE EXISTING FEATURES TO BE REMOVED. Owner Developer Land Surveyor Merrimack College Greystar Development East, VHB "OVAb Graphic Aid Q4o zo ao ao1-1 315 Turnpike Street 1 Federal Street,Suite 1804 101 Walnut Street,PO Box 9151 Corner Development North Andover,MA 01845 Boston,MA 02110 Watertown,MA 02471 Project at Merrimack College 2023-08-17 978.837.5000 857.254.1325 617.924.1770 North Andover,MA \\Vhb\gb1\p,q\Wat-LD\1 162534 G,ey,ta,P3 De,elopme,t\cad\ld\Pla,misc\Buildi,g Height\1 162534-Bldg Height d,,g A ggp jp �J --g oa 203 TURNPIKE STREET - 6 A 5 LEVELSmoo 1P 50' PROPOSED SULLIVAN HALL IM --W 111F -k 451 ANDOVLK STREET 4 LEV ELS ) 1 4 LEVELS 'M& Qi5-147.1' ±50' 1-6 "g 7, ip J PALMISANO HALL raw A ............ ...........\,�� 3 LEVELS FOW-17P—MIK +-46' (EXCLUDING OBSERVATORY Jc AP, mksim i' AND DOME) 'A� —7 WWWI W aw g 41 lizz-air, v Q\1 ? AUSTIN HALL J 'F`,� Aw 4 LEVELS 'Z 410 5 q'g 0 +50 p aw-n- uw a 0� % n la-wr g vsw 6L MAP-, -gp A-e A1 k PROPOSED BLDG 2 kk7'-d-A" 4 N Vft �4 LEVELS 1 J! wAm-�-- It, U- N 0, IMF 'y 4 331, 41 - 0 fkii i A, COLLEGIATE CHURCH OF CHRIST THE TEACHER Alva ROGERS CENTER W,\ 32%N__ 2 LEVELS (FIRST LEVEL BELOW GRADE) 3 N.- W, EL FOR THE ARTS 3§1,5 -Jq a ff V am A -A111-1 SHING HALL z- x- N LEVELS (FIRST LEVEL BELOW GRADE) O-REILLY HALL - % 4 LEVELS MR, M`Q-0 f 11 WIN RN, No x"�/,':'N,,A-L "%hb Existing Building Heights Exhibit B2 Corner Development Project Q4 0 100 200 400 Feet NOTE:APPROXIMATE EXISTING BUILDING HEIGHTS at Merrimack College 2023-08-17 MEASURED USING NEARMAP AERIAL IMAGERY North Andover,MA 0 \\Vhb\gbI\prq\Wat-LD\1162534 Greystar P3 Development\cad\Id\Eng\Average Grade\1162534-Average Grade-dwg AVERAGE GRADE=222.1' BUILDING HEIGHT FROM CUBE3 ELEVATION: - ROOF=69' SOUTH SIDE OF BUILDING=24' NOT RELATIVE HEIGHT FOR EAST SIDE OF BUILDING=45' TOP OF BUILDING ELEVATION:224'+45'=269' PT9-228.0 '.PT12 224.0 PT1.1-2240 PT13 224.0 PROPOSED PT8 2280 PT7 2280 BUILDING 2 HEIGHT = 269' -222.1' = 46.9' Prlsa2a0 BUILDING 1 - PT14-224.0 PTO-2280 FEE 224.0 i FFE=228.0 EN *-225 0 ' PH 7 224.0 PT19 224.0 - 1 PT3�-22II 0 PT4 228.0 6 224,0 P1-224.0 0= j L--- 7 azno zaa.o 2 T PT18-2240 _ PT26 224,0 --� PT27-2240 PT3 22 0 PT20-224.0 T �PT6-228.0 -PT21 2240 - m EN EN EN T o 0 PT4-220.0 a PT25-224.0 PTS-2280=EN IN PT22 224.0 PT?_4-224.0 .. PT23-224.0 PT5-220.0" Hvn ` 'AVERAGE GRADE=225.9' FEE 220.0` BUILDING HEIGHT FROM CUBE3 ELEVATION: ROOF=73' EAST SIDE OF BUILDING=28' PT13 224.0 NOT RELATIVE HEIGHT FOR EAST SIDE OF BUILDING=45':� PT14-224.0 TOP OF BUILDING ELEVATION:228'+45'=273' T2-224 BUILDING 1 HEIGHT = 273' -225.9' = 47.1' 1 PT15 224,0 zPno ` 1 PT7 2240 PT11 2240 _ PT6-2200 Legend �PT7-26-.0 N 2zg0 ... PROPOSED - BUILDING 2 = 228.0 PT8-2240 � PT10 224.0 224.0 FIFE=224.0 220.0 PT9-2240 a ..�� N OF 1gg }Q GRADE TRANSITIONING NL JEFFREY W. Notes 'G� ,\O`GS cn .,CIVIL U... , No.50595 1. ELEVATIONS SHOWN ARE BASED ON NAVD OF 1988. ss ONAL Ea0 Average Grade Calculation Exhibit B3 Q4 0 20 40 80 Feet Corner Development Project at Merrimack College 2023-08-17 North Andover,MA E Q.0000 Vhb Turnpike Street/Route 114 - � tat Walnut sneer Po B,,"9151 Gunn N� EV t mown MA 02471 6179241770 IT Feu 0 E L —--—-- Legend: N PROPOSED BUILDING 1 "N"'T"77,­TOTAL IESF I T1 ­M INTEUS CON(LEETE PAVEMENT 4 LEVELS 1366 USESrsTearw 1111111E)ITIENE ISIIII 111A TI11T E.11—TIII,III IT,IS \ o 1A ­TEI T, Program Summary D."NPfi., 75791 75­ 57 IN I IIT T.IIE III) IUCI IT I T IT III 1P I I�IT Parking Summary IT, ENITI 11 II.EIT T111-4�I—El II.IIEIII 1R.EIT_1TI1-11-11 1111111 T.TI1-1 1-11 NET ITTAIIII-LI T 1 12 12 1 :'T —PROPOSED DITIITIIIE El BUILDING 2 Al I—IN1111 V211 1 62-0 TOTAL GSF 4 LEVELS]174 BEEDS 1,- 11 TTIE.11 axEr Corner Development -PL4L-11 29 �7 7 L",1 1,T Project at Merrimack T I E­ College 315 Turnpike St `*\ North AndoVer,MA 01845 T I, e \ \ i v i I I TE111 111TI 11E1 EIT JI Sign Summary \, MI.T CD sp"' N"b" EV I gh eat A,-17,2023 F7). Local Approva Is Layout and Materials N Plan ty W,,,/F 0-1 Zoning Summary Chart 'F Raher Zg D,,t : —d-,,3(R3) 0...hy D-In(S). AN'. P,.,,d,d I I I'll 11"El_ 1 1 I CNotes - "o — 1 IAI110 NEE N_I '11,N 3 11 IP 4i OK EAGF'59 IDNITIEN-1 ".11TNI"IN'"I tt� 34 EXHIBIT D F T TTTT-I -W .,.—�r, sr�o4 i Y t i i 1 1 µ 1 1 ouversirrracooeansane 1 1 �1 1 1 � 1 � r earxa�a i� � 5 per � 1 aur,ore. hey,,v, �.�uxrexwice . . " Merrimack College-Corner Development Project '> 315 Turnpike St North Andover.MA Ground Floor Plan „�.. _ 16 August 2023 �ma wre�ceM r��.�,�CUBE 35Ndo LLC 370 Mer" ck BVeet.8u1e 33] La a.91843 9]9.9899909 cube3.com ::. r ��Hee a 8 F7= T T T TJ a� Merrimack College-Corner Development Project ' 315 Turnpike St North Andover.MA Typical Residential Floor Plan, ( n , 3rd & 4thFloors) _ 16 August 2023 Wfe r„r CUBE 35Ndo LLC 3]O Merrimack BVeet.8u1e 33] La M a.91843 9]9.9899909 cube3.com ::. h O 31-East ElevationROME / L e B1 North Elevation / Merrimack College-Corner Development Project ' 315 Turnpike St North Andover.MA Building 1 Conceptual Elevations „�.. _ 16 August 2023 W r„r 35N CUBEdo LLC 3]O Merrimack BVeet 1e 3.8u3] Lafe�M a.91843 9]9.9899909 cube3.com ::. E.. _ TO ONE 31-West Elevation / L ��\yyyyy y\y, Will g 4\ \ \ v B1 South Elevation 1 ..sue-1-o Merrimack College-Corner Development Project ' 315 Turnpike St g�� North Andover.MA Building 1 Conceptual Elevations , .. 16 August 2023 CUBE-d LLC 1370—ma—t—tS,,-37 �aw�e��,-0184S 197-9-0 1 -3wm G'UBE= ,y 1� o a n CO B2-North Elevation o �zaa B2-East Elevation Merrimack College-Corner Development Project ' 315 Turnpike St North Andover.MA Building 2 Conceptual Elevations _ 16 August 2023 Wfe M r„r CUBE35Ndo LLC�3]O Merrimack BVeet.8u1e 33]�La a.91843�9]8.9899909�cube3.com �,:. ::.. � . —r 1fi CID oe tlQ O T' O aru mb6'e"Y n0 cD 7 h B2-South Elevation / L F o ic-o Buz �n h - � B2-West Elevation / \ Merrimack College-Corner Development Project ' 315 Turnpike St North Andover.MA Building 2 Conceptual Elevations _ 16 August 2023 LLC 3]O Wfe M r„r CUBE 35Ndo Merrimack BVeet.8u1e 33] La a.91843 9]9.9899909 cube3.com ::. \\\ \ RR AN 211 yv\ Merrimack College-Corner Development Project �p 315 Turnpike St ®� North Andover.MA Perspective View „�.. _ 16 August 2023 r�ma wre�ceM r.� � ��w"RCUBE-� r CUBE38Ndo LLC 3]0 Me ck BVeet.8u1e 33] La a.91843 9]8.9899999 cube3com :. EXIIIBITE Town of North Andover, MA August 3, 2023 w maW, J n �ryy"n Wu"^ % m 'I ,"7 r w, r4�n r � "p��„^C ttlx' ^�' "p 'o' wp Imo , , ax N .. `T1f o `"apt i ���� N 1�1� �' um w"9 10� 4�aom % by gym. . 7lYlr' wu , u y n lllU, kw Q .w m Fl ae _ paUJ ° ��+a b UN 3 mn h-mj xd >�p tl any dr �I W y s 0/ ar' {+� �'. m'm al7P ":� �uraia�!"m`° mR a,s W .1 ° Ue '✓xm 5 dYdT 4K ui n� �, a p� wprtd° V rba �"e,00 �IYr 9 N s} s` r, 4. n e v t'4 aJ ry fia m? 4 4 ,nn g P y� �L Y,,,dr�fl `( ✓° tlilA. '�l�. Pori;° �YA u � U� ro a ray ur Jeb w� �r 01 aka mp,�. i yp b srm a may a r grad Nv rm� l �,�� ro�m � ..�� r �•s�, a. qry `°ra p,mm awro m Ym xm n -b, ,L Roo +7 rau 10 oa✓?IV � d✓rmt, w ti w ua, t�,pJf'JA �ANlp�x +l �am76 Wm ..sa M oy mkm a' A b acre 4N ,a rrm;�eu „a.w - d� 4 , yr B6 r:aP"a m � J4w,� '� 1"=1311.569238284238 ft ra,�manuaa;, w7rtn7oiyxm AGn `. �. �pyldlllp2a. aW+" '�.,WNp" Print map scale is approximate. Critical layout or measurement activities should not be done using this resource. MAP FOR REFERENCE ONLY NOT A LEGAL DOCUMENT Town of North Andover,MA makes no claims and no warranties,expressed or implied,concerning the validity or accuracy of the GIS data presented on this map. Geometry updated 09/29/2022 Data updated on a daily basis Abutter to Abutter( ) Building Dept. ( ) Conservation( ) Zoning ( ) REQUIREMENT: MGL 40A,Section i i states in part"Parties in Interest as used in this chapter shall mean the petitioner, abutters,owners of land directly oppositeon any public or private way,and abutters to abutters within three hundred(300)feel of the property line of the petitioner as they appear on the most recent applicable tax list,not withstanding that the land of any such owner is located in another city or town,the planning board of the city or town,and the planning board of every abutting city or town." Subject Property: MAP PARCEL Name Address 25 13 Merrimack College 315 Turnpike Street North Andover,MA 01845 Abutters Properties Map Parcel Name Address `*"SEE ATTATCHMENTS— Date 8/25/2023 Page 1 of 8 T146 * Mx1 e 024.0-0028-0125.B 024.0-0028-0404.B 025.0-0016-0039.G 125 NAOP LLC 203-404 TURNPIKE STREET RLTY TRST MICHAEL J. 39 ALCOTT REALTY TRUST ROBERT&CHING LID 203 TURNPIKE STREET U:125 B LAROCQUE,TRUSTEE KIRK,TRUS NORTH ANDOVER,MA 01845 203 TURNPIKE STREET U:404 39 ALCOTT WAY NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 024.0-0028-0005.A 024.0-0028-0100,A 024,0-0028-0007.A 451 ANDOVER STREET LLC TALLMAN EYE 451 ANDOVER STREET SUITE 100 RLTY MICHAEL S. 451 ANDOVER STREET,LLC ASSOCIATES CALHOUN,TRUSTEE 451 ANDOVER STREET#G7 451 ANDOVER STREET#5 451 ANDOVER STREET SUITE 100 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 024.0-0031-0000.0 025.0-7165-0000.B 025.0-0011-0055.0 471 ANDOVER STREET LLC 565.66 LLC ABOU-EZZI,JEAN ABOU-EZZI,RACHELLE 44 PARK STREET 565 TURNPIKE STREET U:66 555 TURNPIKE STREET#55 ANDOVER,MA 01810 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0066-0000.0 025.0-0035-0000.0 024.0-0055-0000.0 AIMCOMA MS 235 THREE GALLERIA TOWER AIMCOMA MS235 THREE GALLERIA TOWER ARLEQUE,JEFFREY W. 13155 NOEL RD STE 100 LB 235 13155 NOEL RD,STE 100 LB235 14 BERKELEY ROAD DALLAS,TX 75240-5090 DALLAS,TX 75240-5090 NORTH ANDOVER,MA 01845 025.0-0016-0015.0 024.0-0028-0130.A 025.0-0016-0019.D BEATS,KAREN A CERULLI&ASSOCIATES,LLC CHABOT,PAUL L 15 ALCOTT WAY 451 ANDOVER STREET 19 ALCOTT WAY NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0071-0062.0 025.0-0016-0012.0 025.0-0071-0061.0 CHESTNUT GREEN SIXTY-TWO,LLC FENIGER AND COLLINS FAMILY LIVING TRUST WILLIAM A.& CK MANAGEMENT,LLC ULIASZ MAUREEN E.COLLINGS, 565 TURNPIKE STREET U:61 45 BAY STREET 12 ALCOTT WAY NORTH ANDOVER,MA 01845 MANCHESTER, NH 03104 NORTH ANDOVER,MA 01845 025.0-0016-0006.B 025.0-7163-0000.B 025.0-7163-OOOO.0 CLAUSEN, ERICA,K. COPPOLA,FRANK,A.COPPOLA,ELAINE COPPOLA,FRANK,A.COPPOLA,ELAINE 6 ALCOTT WAY 33 BRADY LOOP 33 BRADY LOOP NORTH ANDOVER,MA 01845 ANDOVER,MA 01810 ANDOVER,MA 01810 025.0-0011-0033.0 025.0-7163-OOOO.A 025.0-0011-0054.0 CTTJ NOMINEE TRUSTJOHNSON,THOMAS D.N.BARDWELL,LLC DEMINSKI TURNPIKE REALTY TRUST KENNETH 555 TURNPIKE STREET#33 565 TURNPIKE STREET U:63A E.DEMINSKI,TRUSTEE NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 555 TURNPIKE STREET U:56 NORTH ANDOVER,MA 01845 047.0-0016-0000.0 025.0-0016-0016.D 025.0-0016-0023.E FARNUM,BENJAMIN,S. WILLIAM T.&SHEILA M. FOULDS FOULDS, FULLER,JOHN WOO,KYUNGMI 1370 TURNPIKE STREET WILLIAM T.,TR 23 ALCOTT WAY NORTH ANDOVER,MA 01845 16 ALCOTT WAY NORTH ANDOVE,MA 01845 NORTH ANDOVER,MA 01845 024.0-0028-0209.A 025.0-0016-0018.D 024.0-0050-0000.0 GB&MOE LLC GOLDBERG,DENISE M GORHAM,FREDRICK,P. 362 E. BROADWAY 18 ALCOTT WAY 49 TOLLAND ROAD HAVERHILL, MA 01830 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0016-0022.E 025.0-0016-0013.0 024.0-0044-0000.0 GREWAL,LESLEY GRIFFITHS,PAULA HANNA,COLETTE,Y. 22 ALCOTT WAY 13 ALCOTT WAY#13 246 TURNPIKE STREET NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 024.0-0028-0150.A 024.0-0028-0160.A 024.0-0028-0008.A HASSEY,DAVID J.MILL CITY INSURANCE HASSEY,DAVID J.MILL CITY INSURANCE HERITAGE DRIVE INVESTMENTS LLC 493 WESTFORD STREET 493 WESTFORD STREET 80 HERITAGE DRIVE LOWELL,MA 01851 LOWELL,MA 01851 LOWELL,MA 01853 024.0-0028-0170.A 025.0-0011-0030.0 025.0-0011-0031.0 HERNANDEZ,CARIDAD JOHNSON TR,THOMAS F CTTJ NOMINEE TRUST JOHNSON,THOMAS F,MD 451 ANDOVER STREET U: 170A 555 TURNPIKE STREET#30 555 TURNPIKE STREET NORTH ANDOVER,MA 01845 NORTH ANDOVER, MA 01845 NORTH ANDOVER,MA 01845 024.0-0069-0000.0 025.0-0016-0032.F 024.0-0052-0000.0 LIZOTTE JR,THOMAS J LIZOTTE,NICOLE M LUO.XUNSHAN LURVEY, ROBERT,E. LURVEY,DEBORAH,J. 17 HIGHLAND TERRACE 14008 175TH PLACE NE 19 TOLLAND ROAD NORTH ANDOVER,MA 01845 REDMOND,WA 98052 NORTH ANDOVER,MA 01845 025.0-0071-0074.0 025.0-0016-0007.B 025.0-0069-0012.0 M&S REALTY, LLC MADER,ALLISON JOSEPH D.LAGRASSE 565 TURNPIKE STREET#74 7 ALCOTT WAY 327 MERRIMAC STREET NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 MEWBURYPORT,MA 01950 025.0-0016-0035.G 024.0-0029-0000.0 025.0-0067-0000.0 LEE,PATRICK CHERI SIU KWAN LEUNG MERRIMACK COLLEGE MERRIMACK COLLEGE 35 ALCOTT WAY 315 TURNPIKE STREET 315 TURNPIKE STREET NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0014-0000.0 025.0-0021-0000.0 025.0-0016-0034.G MERRIMACK COLLEGE MERRIMACK COLLEGE MERRIMACK COLLEGE ACCOUNTS PAYABLE A13 315 TURNPIKE STREET 315 TURNPIKE STREET 315 TURNPIKE STREET NORTH ANDOVER, MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0016-0010.C 024.0-0028-0105.A 024,0-0028-0120.B MORAN,VALERIE L. NA PROPERTY,LLC NANO PROPERTIES,LLC 10 ALCOTT WAY 189 FOREST AVE 203 TURNPIKE STREE,STE.120 NORTH ANDOVER,MA 01845 W. NEWTON,MA 02465 NORTH ANDOVER,MA 01845 024.0-0028-0100.B 024.0-0028-0303.B 024.0-0028-0002.B NANO PROPERTIES,LLC NAOP,LLC C/O COLLIERS INTERNATIONAL NEOS,LLC 203 TURNPIKE STREET,STE. 100 175 CANAL STREE,STE.401 203 TURNPIKE STREET,STE.G2 NORTH ANDOVER,MA 01845 MANCHESTER,NH 03101 NORTH ANDOVER,MA 01845 025.0-0071-0086.0 025.0-0011-0032.0 025.0-7182-OOOO.A NEU REALTY COMPANY LLC ORTHO REALTY TRUST STEPHEN M WEISNER,TR P G A REALTY TRUST R W&H L CROCKER&K 231 SUTTON STREET SUITE 1 D 555 TURNPIKE STREET U:32 DOTY NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 565 TURNPIKE STREET SUITE 80 NORTH ANDOVER,MA 01845 024.0-0045-0000.0 025.0-0069-0027.0 025.0-0016-0014.0 PLEASANT STREET HOLDINGS,LLC PRAKASH REALTY,LLC THE MICHAEL PROVENZANO 2020 TR 231 SUTTON STREET 124 PHILLIPS COMMON PROVENZANO,MICHAEL NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 14 ALCOTT WAY NORTH ANDOVER,MA 01845 025.0-0012-0000.0 025,0-0011-0056.0 025.0-0071-0073.0 WALGREEN CO.RITE AIDE CORPORATION C/O RICHARD,PATTI A RINALDI,STEVEN WALGREEN 15 MAYFLOWER LANE 565 TURNPIKE STREET U:73 PO BOX 1159 HAVERHILL,MA 01832 NORTH ANDOVER,MA 01845 DEERFIELD,IL 60015 047.0-0031-0000.0 025.0-0016-0005.B 024.0-0046-0000.0 SNOW,DEBORAH J SNOW,GARETT E. SUNDARARAJAN, PARTHPAN SZCZAPA, MICHAEL,J.GOUDREAU,LAURA, L. 1 BERKELEY ROAD 5 ALCOTT WAY Unit 5B 13 WILSON ROAD NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0016-0024.E 024.0-0032-0000.0 024.0-0047-0000.0 TRIANTAFILOU, NICHOLAS DIANE X TRIANTAFILOU THOMPSONS RESTAURANT,INC TOMASHEVSKY,GREGORY A SVETLANA P 24 ALCOTT WAY P 0 BOX 155 TOMACHEVSKY NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 21 WILSON ROAD NORTH ANDOVER,MA 01845 025.0-0011-0042.0 025.0-0071-0081.0 024.0-0028-0185.A TURNER REALTY TRUSTTURNER,IAN M TRUSTEE TURNPIKE HOLDINGS, LLC VERSIE GROUP,LLC 555 TURNPIKE STREET 565 TURNPIKE STREET#81 451 ANDOVER STREET U:185 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0071-0071.A 025.0-0071-0071.B 024.0-0028-0206.A ZOLOT,HOWARD,M. ZOLOT, HOWARD,M. 451 ANDOVER ST U206 REALTY TRUST REDDI,VA 59 SUNSET ROCK ROAD 59 SUNSET ROCK ROAD S.,TR NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 PO BOX 2105 ANDOVER,MA 01810 024.0-0028-0301.A 025.0-0011-0051.0 025.0-0011-0053.0 WACHTEL REALTY, LLC MESHAR REALTY,LLC WEISS,JONATHAN 451 ANDOVER STREET U:301 A 555 TURNPIKE STREET,SUITE 51A 555 TURNPIKE ST. UNIT 53 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 024.0-0080-0000.0 024.0-0056-0000.0 024.0-0028-0213.A WHEELER,MEGAN,COLLINS WILSON,MATTHEW R.WILSON,MARIA INDIGO RE, LLC. 24 BERKELEY ROAD 200 ELM STREET 177 CHADWICK STREET NORTH ANDOVER,MA 01845 ANDOVER,MA 01810 NORTH ANDOVER,MA 01845 024.0-0028-0214.A 024.0-0028-0305.A 025.0-0011-0044.0 INDIGO RE,LLC. INDIGO RE,LLC. PASTA BROTHERS,LLC 177 CHADWICK STREET 177 CHADWICK STREET 555 TURNPIKE STREET#44A NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0016-0001.A 024.0-0028-0315.A 024.0-0028-0210.A CERUOLO,ANTHONY R. BATTEN,J.GREGORY BATTEN,J.GREGORY 1 ALCOTT WAY 451 ANDOVER STREET-UNIT 315 451 ANDOVER STREET-UNIT 210 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 024.0-0028-0003.A 024.0-0028-0006.A 025.0-0016-0025.E CHAN REAL ESTATE,LLC CHAN REAL ESTATE,LLC PETIT,MANLY M. PETIT,AMY 451 ANDOVER STREET U-3A 451 ANDOVER STREET U-6A 25 ALCOTT WAY NORTH ANDOVER,MA 01845 NORTH ANDOVER, MA 01845 NORTH ANDOVER,MA 01845 024.0-0028-0190.A 024.0-0028-0200.B 024.0-0054-0000.0 203 TURNPIKE REALTY,LLC 203 TURNPIKE STREET REALTY,LLC WEIDELJR,PAUL F.TREACY,DENISE M. 175 CANAL STREET,STE.401 500 CHAPMAN STREET,SUITE 201 50 TOLLAND ROAD MANCHESTER,NH 03101-2335 CANTON,MA 02021 NORTH ANDOVER,MA 01845 025.0-0069-0026.0 025.0-0069-0028.0 047.0-0015-0000.0 575 TURNPIKE STREET 26-28,LLC 575 TURNPIKE STREET 26-28,LLC VOONG,DIANNA VOONG,TOM 9 MACDONALD DRIVE 9 MACDONALD DRIVE 318 TURNPIKE STREET BOXFORD,MA 01921 BOXFORD,MA 01921 NORTH ANDOVER,MA 01845 025.0-0016-0030.F 025.0-0016-0027.E 024.0-0075-0000.0 RENZELLO,LYNDA LYONS,PAUL W. LYONS,CHARLOTTE A.R. LURVEY, ROBERT E.LURVEY,DEBORAH J. 30 ALCOTT WAY 27 ALCOTT WAY 26 TOLLAND ROAD NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0016-0028.E 025.0-0069-0010.0 025.0-6915-000O.A D-AVANZO,OLIVIA E. EPITELOS,LLC MCNULTY,BRIAN 28 ALCOTT WAY 575 TURNPIKE STREET U-10 575 TURNPIKE STREET SUITE 15 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 024.0-0028-0000.0 025.0-0069-0000.0 024.0-0028-0005.0 NORTH ANDOVER OFFICE PARK CON CHESTNUT GREEN CONDO MASTER 451 ANDOVER STREET LLC TALLMAN EYE 203 TURNPIKE STREET 555-575 TURNPIKE STREET ASSOCIATES NORTH ANDOVER, MA 01845 NORTH ANDOVER,MA 01845 451 ANDOVER STREET#5 NORTH ANDOVER,MA 01845 024.0-0028-0165.A 024.0-0028-0195.A 024.0-0028-0003.B 203 TURNPIKE STREET REALTY,LL 203 TURNPIKE STREET REALTY,LL 203 TURNPIKE STREET REALTY,LL 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101 024.0-0028-0301.B 024.0-0028-0302.B 024.0-0028-0403.B 203 TURNPIKE STREET REALTY,LL 203 TURNPIKE STREET REALTY,LL 203 TURNPIKE STREET REALTY,LL 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101-2335 024.0-0051-0000.0 025.0-0071-0077.0 025.0-0016-0008.E DEWITT, ROBERT M.DEWITT,MADALENA MARIE NOBLE DEVELOPMENT ENTERPRISE,LLC VITALE,RICHARD D.RIZZO,LAUREN 6 TOLLAND ROAD 35 SHANNON LANE 8 ALCOTT WAY NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0071-0064.0 025.0-0011-0045.0 025.0-0011-0047,0 MAGPIE REALTY,LLC 555 TURNPIKE STREET, LLC MOAVENIAN REALTY,LLC 565 TURNPIKE STREET U-64 119 FOX HILL ROAD 33 TRAFALGAR SQUARE NORTH ANDOVER,MA 01845 NEEDHAM,MA 02492 NASHUA,NH 03063 025.0-0016-0031.F 024.0-0028-0207.A 024.0-0028-0208.A SHANMUGA SUNDARAM,SATHISH KUMAR 451 ANDOVER#207/208, LLC 451 ANDOVER#207/208,LLC SELVARAJ,DHANYA 2 BEVERLY DRIVE,SUITE 2 2 BEVERLY DRIVE,SUITE 2 31 ALCOTT WAY STERLING, MA 01564 STERLING,MA 01564 NORTH ANDOVER,MA 01845 025.0-0016-0002.A 025.0-0016-0021.D 024.0-0028-0125.A PETER D.COLLINS FAMILY TRUST COLLINS, PETER, BROWN AND MCGUIRE REVOCABLE LIVING TRUST NAOP MEDICAL REALTY,LLC TR BROWN,ROBERT A.,TR 500 CHAPMAN STREET,SUITE 101 2 ALCOTT WAY 21 ALCOTT WAY CANTON,MA 02021 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0011-0052.0 025.0-0064-0000.0 025.0-0071-0083.0 CHATSON,MD.,GEORGE P. MERRIMACK COLLEGE c/o AP Al PULMONARY AT CHESTNUT GREEN ANDOVER,LI 555 TURNPIKE STREET#52 315 TURNPIKE STREET 565 TURNPIKE STREET#83 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0071-0085.0 025.0-7182-0000.B 025.0-0016-0004.A PULMONARY AT CHESTNUT GREEN ANDOVER,LLC PULMONARY AT CHESTNUT GREEN ANDOVER, LLC JEFFERSON,TRACEY A.JEFFERSON,ROBERT E. 565 TURNPIKE STREET#85 565 TURNPIKE STREET#82B 4 ALCOTT WAY NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0071-0076.0 025.0-0069-0025.0 024.0-0028-0004.A 565 TURNPIKE ST.SUITE 76 A HOLDING,LLC FIRST CHOICE PROPERTIES,LLC NAOP MEDICAL REALTY,LLC 565 TRUNPIKE STREET U-76 575 TURNPIKE STREET SUITE 25 175 CANAL STREET,STE.401 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 MANCHESTER,NH 03101-2335 024.0-0028-0011.A 024.0-0028-0110.A 024.0-0028-0302.A NAOP MEDICAL REALTY,LLC NAOP MEDICAL REALTY,LLC NAOP MEDICAL REALTY,LLC 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101-2335 024.0-0028-0330.A 024.0-0028-0335.A 024.0-0028-0200.A NAOP MEDICAL REALTY,LLC NAOP MEDICAL REALTY, LLC NAOP MEDICAL REALTY,LLC 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101-2335 024.0-0028-0201.A 024.0-0028-0202.A 024.0-0028-0205.A NAOP MEDICAL REALTY,LLC NAOP MEDICAL REALTY,LLC NAOP MEDICAL REALTY,LLC 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 MANCHESTER,NH 03101-2335 MANCHESTER,NH 03101-2335 MANCHESTER, NH 03101-2335 024.0-0028-0211.A 024.0-0028-0400.B 024.0-0028-0401.E NAOP MEDICAL REALTY,LLC NAOP MEDICAL REALTY LLC c/o COLLIERS NAOP MEDICAL REALTY LLC c/o COLLIERS 175 CANAL STREET,STE.401 INTERNATIONAL INTERNATIONAL MANCHESTER,NH 03101-2335 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 MANCHESTER,NH 03101 MANCHESTER,NH 03101 024.0-0028-0402.B 024.0-0028-0406.B 024.0-0028-0407.B NAOP MEDICAL REALTY LLC c/o COLLIERS NAOP MEDICAL REALTY LLC c/o COLLIERS NAOP MEDICAL REALTY LLC c/o COLLIERS INTERNATIONAL INTERNATIONAL INTERNATIONAL 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 175 CANAL STREET,STE.401 MANCHESTER,NH 03101 MANCHESTER, NH 03101 MANCHESTER,NH 03101 047.0-0014-0000.0 025.0-6915-0000.B 025.0-0069-0011.0 LEYLAND,ROBERT C.JR. M-M2 HOLDINGS,LLC M-M2 HOLDINGS,LLC 312 TURNPIKE STREET 29 PETER PARLEY ROAD#2 29 PETER PARLEY ROAD#2 NORTH ANDOVER,MA 01845 BOSTON,MA 02130 BOSTON,MA 02130 025.0-0069-0014.0 025.0-0069-0016.0 025.0-0069-0017.0 M-M2 HOLDINGS,LLC M-M2 HOLDINGS,LLC M-M2 HOLDINGS,LLC 29 PETER PARLEY ROAD#2 29 PETER PARLEY ROAD#2 29 PETER PARLEY ROAD#2 BOSTON,MA 02130 BOSTON,MA 02130 BOSTON,MA 02130 025.0-0069-0021.0 025.0-0069-0023.0 025.0-0016-0026.E M-M2 HOLDINGS,LLC M-M2 HOLDINGS,LLC PETER M.NAWFEL FAMILYTRUST NAWFEL,PETEI 29 PETER PARLEY ROAD#2 29 PETER PARLEY ROAD#2 M.,TR BOSTON,MA 02130 BOSTON,MA 02130 26 ALCOTT WAY NORTH ANDOVER,MA 01845 024.0-0030-0000.0 025.0-0016-0009.E 024.0-0008-0000.0 MERRIMACK COLLEGE Al ACCT PAYABLE CAFFERY,SUSAN,L. DOHERTY,SHAWN J. DOHERTY,VERONICA G. 315 TURNPIKE STREET 60 MERRIMAC STREET UNIT 705 3 WILSON ROAD NORTH ANDOVER,MA 01845 AMESBURY,MA 01913 NORTH ANDOVER,MA 01845 025.0-0016-0020.D 025.0-0016-0036.G 025.0-0016-0003.A BOCKMANN,MATTHEW CARACUEL,MARIA M. CARON,NICOLE MARIE 20 ALCOTT WAY 36 ALCOTT WAY 3 ALCOTT WAY NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER, MA 01845 024.0-0053-0000.0 025.0-0016-0038.G 024.0-0028-0120.A ORMISTON,GREGORY ORMISTON,LAUREN DAVID M.KONJOIAN AND ROSALIE F.KONJOIAN LISBRIA REALTY LLC 11 TOLLAND ROAD LIVING TRUST KONJOIAN,DAVID M.,TR 327 MERRIMAC STREET NORTH ANDOVER,MA 01845 38 ALCOTT WAY NEWBURYPORT,MA 01950 NORTH ANDOVER,MA 01845 024.0-0028-0115.B 025.0-0069-0022.0 025.0-0069-0024.0 M-M2 HOLDINGS,LLC M-M2 HOLDINGS,LLC M-M2 HOLDINGS,LLC 29 PETER PARLEY ROAD,#2 29 PETER PARLEY ROAD#2 29 PETER PARLEY ROAD#2 BOSTON,MA 02130 BOSTON,MA 02130 BOSTON,MA 02130 025.0-0071-0075.0 025.0-0071-0072.0 025.0-0011-0041.0 WAI KEE LEE,LLC TIBBETTS,AMY MOAVENIAN REALTY,LLC 565 TURNPIKE STREET#75 245 CHESTNUT STREET 33 TRAFALGAR SQUARE NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NASHUA,NH 03063 025.0-7165-OOOO.A 025.0-0016-0011.0 025.0-0016-0037.G SKYLEXI TRUST LONGTIN,KELLY T.,TR BURNS FAMILY REALTY TRUST BURNS,JAMES P., MCKINNON FAMILY IRREVOCABLE TRUST 7 MOUNT HOLLY DRIVE TR MCKINNON,ROBERT&PAULA,LE METHUEN,MA 01844 11 ALCOTT WAY 37 ALCOTT WAY NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0079-0000.0 025.0-0071-0084.0 025.0-0016-0017.D POND VIEW NA,LLC VLB REALTY,LLC LEWIN FAMILY REAL ESTATE TRUST LEWIN, 10 CONVERSE PLACE 565 TURNPIKE STREET, U-84 JOSHUA A.,TR WINCHESTER,MA 01890 NORTH ANDOVER,MA 01845 12 MOCASSIN PATH NATICK,MA 01760 024.0-0073-0000.0 025.0-0016=0033.F 024.0-0028-0001.B HRONO,SARA WIESELQUIST, PETER ROBINSON,JENNIFER 203 TURNPIKE G1, LLC 6 BERKELEY ROAD 33 ALCOTT WAY 203 TURNPIKE STREET,U-G1 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 NORTH ANDOVER,MA 01845 025.0-0011-0043.0 025.0-0016-0029.E 555 TURNPIKE STREET, LLC MAHER FAMILY TRUST MAHER,JAMES J.,TR 119 FOX HILL ROAD 29 ALCOTT WAY NEEDHAM,MA 02492 NORTH ANDOVER,MA 01845 Ngtiununntu► pF Alit p °�A�Etl •�4y6 a BOARD OF ASSESSORS TOWN OFFICES So *� 7 . 36 BARTLET ST ANDOVER, MA 01810 sgcHU5 � 978-623-8930 w�► BOARD OF ASSESSORS CERTIFICATION OF ABUTTERS out of town request PETITION #077314�1 lw —m Cf I hereby certify the attached list, as requested, of abutters as they currently appear on the Assessors' Office records. Meg Anderson Senior Assessor 0 ELM STANDOVER,MA01810 3 0 1 200-A MURRAY WAY ANDOVER,MA01810 4 072 23 BROOKFIELD RD ANDOVER,MA01810 20106 LUG:132 LUC:942 LUC:101 OWNER UNKNOWN TT AUGUSTINIAN COLLEGE HARRIER WILLIAM M %COLLECTORITREASURER THE MERRIMACK VALLEY HARRIER ANNAV TE 36 BARTLET ST 315 TURNPIKE ST 23 BROOKFIELD RD ANDOVER,MA0I810-0000 NORTH ANDOVER,MAC18454=0 ANDOVER,MA01810-0000 3FARNSWORTHRDANDOVER,MA01610 302 8-R APPLECREST RD ANDOVER,MA 018 10 4073 17 BROOKF IELD RD ANDOVER,MA 01810 20107 LUC 101 LUC:946 LUC:101 LORI M PAGLIA REVOC TRUST-2000 MERRIMACK COLLEGE KOWSKI THOMAS JAMES PAGLIA LORI+PETER TRS 315 TURNPIKE ST 17 BROOKFIELD RD 3 FARNSWORTH RD NORTH ANDOVER,MA 01845-0000 ANDOVER,MA01810-0000 ANDOVER,MA01810-0000 147 ELM ST ANDOVE R,MA 01810 303 19 DOWNING STANDOVER,MA01810 4077 13 BROOKFIELD RDANOOVER,MA01810 20108 LUC,945 LUC'.101 LUC:101 MERRIMACK COLLEGE ANDERSON TRUST OF 2010 LEVINE STEPHEN H. CIO Al 3-ACCOUNTS PAYABLE DEPT SALIBE JUDITH A TR LEVINE SANDRA K TE 315 TURNPIKE ST 19 DOWNING ST 13 BROOKFIELD RD NORTH ANDOVER,MA 01845-0000 ANDOVER,MA01810-ODOO ANDOVER,MA01810-0000 0 ELM STANDOVER,MA01810 304 17 DOWN INGST ANDOVER,MA01810 4078 9 BROOKFIELD RDANDOVER.MAD1810 20109 LUC:946 LUC,101 LUC:101 AUGUSTINIAN COLLEGE PELTIER REALTY TRUST BUSTATHOMAS M THE MERRIMACK VALLEY PELTIER LEONARD+VERONICATRS 9 BROOKFIELD RD 315 TURNPIKE ST 17 DOWNING ST ANDOVER.MA 0181M000 NORTH ANDOVER,MA01845-0000 ANDOVER,MA01810-0000 100 MURRAY WAYANDOVER,MA01810 3 0 5 15 DOWNING STANDOVER,MA01810 4079 5 BROOKFIELD RDANDOVER,MA01810 20110 LUC:942 LUC:101 LUC:101 AUGUSTINIAN COLLEGE 15 DOWNING STREET RT BEAN CURTIS H THE MERRIMACK VALLEY LAHOOD JOSEPH+SANDRATRS BEAN SARA H JT 315 TURNPIKE ST 15 DOWNING ST 5 BROOKFIELD RD NORTH ANDOVER,MA 01 B45-0000 ANDOVER,MA01810-0000 ANDOVER,MA 01810-0000 0 ELM STANDOVER,MA01810 306 13 DOWNING STANDOVER,MA01810 4080 1 BROOKFIELD RD ANDOVER,MA01810 2 C 111 LUC 946 LUG:101 LUC 101 MERRIMACK COLLEGE INC THIRTEEN DOWNING STREET RT II POWERS NATHANAEL P 315 TURNPIKE ST O'BRIEN THOMAS+GERALDINE TRS 1 BROOKFIELD RD NORTH ANDOVER,MA01845-0000 13 DOWNING ST ANDOVER,MA01810-00DO ANDOVER,MA 01810-0000 41 FOX HILL RD ANDOVER,MA01B10 2097 11DOWNiNGST ANDOVER,MA01510 4091 151 ELM ST ANDOVER,MA 01810 20112 LUC 101 LUC:101 LUG:101 THOMSON ALAN W SASSANO JAMES M MCCARTHY REID C THOMSON SUSAN TE SASSANO KATELYN E TE HERNANDEZ GABRIELAA JT 41 FOX HILL RD 11 DOWNING ST 151 ELM ST ANDOVER,MA01810-0000 ANDOVER,MA01810-0000 ANDOVER,MA01810-0000 37 FOX HILL RDANDOVER,MA01810 2096 33 BROOKFIELD RDANDOVER,MA01810 20103 145 ELM ST ANDOVER,MA01B10 304A LUC:945 LUC:946 LUC 132 MERRIMACK COLLEGE AUGUSTINIAN COLLEGE MAYE ROBERT J 315 TURNPIKE ST THE MERRIMACK VALLEY MAYE LISA HOLIHAN TE NORTH ANDOVER,MA 01845-0000 315 TURNPIKE ST PO BOX 2000 NORTH ANDOVER,MA 01845-0000 RYE,NH 03870-0000 33 FOX HILL RD ANDOVER,MA 01810 2099 29 BROOKFIELD RD ANDOVER,MA 01810 20104 55 TOWNHOUSE LN ANDOVER,MA 01810 30 5 A LUC:945 LUC:101 LUC:942 MERRIMACK COLLEGE WANG JOHN YANG AUGUSTINIAN COLLEGE 315 TURNPIKE ST CHENG JEANNE THE MERRIMACK VALLEY NORTH ANDOVER.MA 01845 OO 29 BROOKFIELD RD 315 TURNPIKE ST ANDOVER,MA01810-0000 NORTH ANDOVER,MA 01845-0000 124-R SUMMER STANDOVER,MA01810 4061 27 BROOKFIELD RD ANDOVER,MA01810 20 105 250 WALSH WAY ANDOVER,MA 01 B10 3 0 5 B LUC',932 LUC,101 LUC:945 TOWN OF ANDOVER LYNCH CAROLYN AUGUSTINIAN COLLEGE CONSERVATION COMMISSION 27 BROOKFIELD RD THE MERRIMACK VALLEY 36 BARTLET ST ANDOVER,MA 01810-0000 315 TURNPIKE ST ANDOVER,MA 01 B10-0000 NORTH ANDOVER,MA 01845-0000 32 ROCK RIDGE RD ANDOVER,MA01810 20 51 A LUC:946 AUGUSTINIAN COLLEGE THE MERRIMACK VAL.EY 315 TURNP IKE ST NORTH ANDOVER,MA01845-0000 141 ELM ST ANDOVER.MA 01810 21 C 139 LUC:125 SHP VI ANDOVER LLC C/O PGIM REAL ESTATE 7 GIRALDA FARMS MADISON.NJ 0794D-0000 63 LUCERNE DR ANDOVER.MA01810 210156 LUC:101 HODGESROWENA 63 LUCERNE OR ANDOVER,MA 01610-0000 59 LUCERNE DR ANDOVER,MA01810 210157 LUC.101 TRAHAN MICHAEL R TRAHAN LAUREN ATE 59 LUCERNE DR ANDOVER.MA01810-0000 55 LUCERNE DR ANDOVER,MA 01810 210158 LUC:101 HUTCHINSON SAMUEL R BUNTING EMILY G JT 55 LUCERNE DR ANDOVER,MA01810-0000 49 LUCERNE DRANDOVER,MA01810 210159 LUC 101 MORIN SUSAN H 49 LUCERNE DR ANDOVER,MA01810-0000 43 LUCERNE DR ANDOVER,MA01810 210100 LUC:101 SPURR GREGORY W III SPURR BONNIE ATE 43 LUCERNE OR ANDOVER,MA 01810-0000 39 LUCERNE OR ANOOVER,MA 01810 210161 LUC:101 KNOWLES SHEILAM 39 LUCERNE DR ANDOVER,MA 01010-0000 35 LUCERNE DR ANDOVER,MA01810 210 182 LUC:101 DIBENEDETTO JOHN DIBENEDETTO ALISON TE 35 LUCERNE DR ANDOVER,MA 01810-0000 EXHIBIT f ' 4 .�....-M rg r_ ....J.■._.. g .n .._.... _. . _ ........_.......................... ................._...._..._...................... _ ...................................................................- ......................----.......................---.................................................................. _.... _, _._.._.... ......... of ................._.....Lawrence...................... ....-_....__._..._.__........._-....._.__..Essex _ - _.._..-_...._.....County, Massachusetts, being unmarried, for consideration paid, rant to..--...AL1gF1St.1ri�. lll... .? ,. .. .,...._o I.....the....MerT.li18_ck . al.1.ey. ....-a.---c-orporat. on..__ u y_�organized under .the laws_ of Massacfiusetts .. . ....and....hav- ng.•_an usual lalace of business in North Andover, Mass . �- - Of ............................................................................----........................................---................................__.............___..----...........-......_with quitrtutm roorugrta ................._...............- --..- . ......_..--- .._...._....---- ------- --------..._..............-..............................-......................... - ...........-........-..-._........... -.-._........... 9ce4an4in ....._A..-..cn.rta-in..._par..c.al.....of.-..land—in....N.ort] -Andovem.......Ma-as...........haLmd-ad.-....... and.....des-cr. b_ed..._as ..............._....................__......................................................................._..__..........._._.............. (Pesar4p9@ _w4 omwn mseesr 4-a"4 Northeasterly by the southwesterly line of Salem Turnpike twenty--five hundred and nine and 10/100 (2509.10) feet; Northeasterly by the southwesterly line forming the junction of said Salem Turnpike and Andover By-Pass six- hundred seventy- nine and 66/100 (679.66) feet; Easterly by the westerly line .of said Andover By-Pass ninety-nine and 79/1.00 (99.39) feet; Southeasterly by land now or formerly of Trustees of Phillips Academy four hundred seventy-four and 37/100 (474.37) feet; Northeasterly by said Trustees of Phillips Academy land and by land now or formerly of Frederick Moseley five hundred eighty- seven and 60/100 (5$7.60) feet; Southerly by land now or formerly of James Downing et al six hundred eighty-eight and 40/100 (688.40) feet, being a line in: an old road as shown on the plan hereinafter mentioned.; Southwesterly twelve hundred and 64/100 (1200.64) feet; - Southerly one hundred eighty-two and 83/100 (182.83) feet, and Southwesterly five hundred eighty-nine and 42/100 (589.42) feet by lot B as shown on said plan; Southwesterly i-n--thy, -same-l--ne thirteen hundred and ten and 58/100 (1310.58) feet.' to__a__stone bound marking the line between Andover and North Andover,kaown as Elm St. in Andover and Andover St. in North Andover; Northwesterly by the southeasterly line of Andover St. f ot�r hundred thirty- ni*ne and :78/100 1439.78) feet t$ ya pint; and Northatly by the southerly line forming the junction of $aid Andover Street and Salem Turnpike one hundred fifteen and 69/100 (115.69) feet. Being part of the premises conveyed to Margaret 1. Higgins and being Parcel A on a plan drawniby Clinton F. Goodwin, Eng. dated December, 1943, and noted on Transfer Certificate of Title Number 2941, recorded with the Rec°ords of Registered Land in North District Essex- Registry of Deeds, Book 20, Page 165. So much of the land as is included within the limits bf the Old Road south of Parcel A, is subject to the rights of all persons lawfully entitled thereto in and over the same. Premises are conveyed subject to the taxes for the current year which the grantee assumes and hereby agrees to pay. There is appurtenant to said Parcel A rights of way over the north- wester-ly: portion of:-said,Road-afor said 4qd ;over a. passageway .about twenty six (26) feet wide and about ten hundred fifty (1050) feet long,being the extension of the whole of said Road aforesaid northeasterly and situated 1 THE FOLLOWING IS NOT A PART OF THE DEED, AND IS NOT TO EE RECORDED.) e CHAPTER 183, SECTION 11, GENERAL LAws A deed in substance following the form entitled "Quitclaim- Deed" shall when duly executed have the force and effect of a deed in fee simple to the grantee, his heirs and assigns, to his and their awn use, with covenants on the part of the grantor, for himself, his heirs, executors, administrators and successors, with the grantee, his heirs, successors and .assigns,.that at the time of the delivery of such deed the premises were free from all encumbrances made by him, and that he will, and his heirs, executors and administrators shall, warrant and defend the same to the grantee and his heirs and assigns forever against the lawful claims and demands of all persons claiming by, through or under the grantor, but against none other. t , MIT: Q Ga ! ci- O Orin OD to R+ 13 00 sr 0 � "�a C'F OWNER'S AUTHORIZATION Re: Property — 315 Turnpike Street North Andover, MA 01845 Owner — Merrimack College The undersigned, owner of the above-referenced Property, hereby authorizes Johnson & Borenstein, LLC to file and pursue permits, applications,petitions, and appeals with the Town of North Andover Zoning Board of Appeals related to the above-referenced Property. Owner: Jeffrey ooggett(Sep 13,2073 1OM FC)f) Dated: September 13, 2023